Loading...
HomeMy WebLinkAboutLetter of Completion O� b o — r7 Jul, 10. 2008 12:32PM J Fred Bayl iss, P. C. No. 7352 P. 2 FROM :Texwn Geral Cantract:ur5 FAX KO. :9795909797 Jul. 09 2O1X 10:03P11 P2 • LETTER OF COMPLETION CITY ENGINEER . DATE: '7-- 7- Of.._... _. CITY OF COLLEGE STATION COLLEGE STATION,TEXAS /00vI4 7'<daf7 RE: COMPLETION OF 1 /"/ '• �as<' The purpose of onr letter is to request that the following listed improvements be approved and accepted as being constructed under oily Inspection and completed according to plans and specifications as approved and rewired by the City of College Station,Texas. This approval and acceptance by the City is requested in order that we may finalize tuiy sub- contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvetnente on the above refereneed project. • `the one year warranty is hereby affirmed and agreed to by ' ?XGo`'`i and by their suh.-contractors a t indieafod by signatures below, \OR1 Cf1M2LET,D1 DATE • fr/V41-7-&:- 5 -- � --- _D OWNER: PI 14.0 _Vewi L Lt: CONTRACT.OR. ../,_ 7(CQr / Add1ess: c l ) F✓rh,v► �awt Address: /.7 rr.�,,.- 'r Signature; fir%,= `� �,, �u Signature:—Z9`-L.,./-� / • UJoi—e--s W 7-40 bE, Utility Representative ACCEPTANCE&APPROVAL ly E meet PLAT FILED OFFSITE ESMTS FILED k TEMP BLANKET ESMT FILED A NO OTHER FSr.rrS NEEDED 7.CDti G�/eviric, J LSS'-S e b. 26. 200/ 8: 08AM J Fred Bay] i ss, P. C. No, 3872 P. 2 FROM :Thxcon Inr1 Contractors FAX NO. :9796909797 Feb. 23 2007 ii;55H11 P2 LETTER OF COMPLETION CITY ENGINEER DATEL„.,_,..,2/23/Q7 CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF North Forest Pt-oh:60040 eArk , The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under city inspection and completed according to plans and specifications as approved and required by the City of Collese Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any sub- contracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the fisted improvements on the above referenced project. The one year warranty is hereby affirmed and agreed to by TCXCOP and by their sub-contractors as indicated by signatures below, WOW COMPLETE) Dal ki,19,1""A-1) Litios 2123107 SanitwY kvier 2/g(07 OWNER:_ftio ye*,!,,Lc CONTRACTOR To:K(1AI Addrcos;ilg jyLyjaimoge A.claress:=12rxhitrai Bryn Texas 77801 College Station. T as MO Signature: gimtu . * 2 - 17 — tiOyi Representative ACCE.VrANCE& APPROVAL I eitv.Pitginee