HomeMy WebLinkAboutMisc /SE /1 ' J
i2 7/
(irff ..41144
CITY INFRASTRUCTURE
CITY OF COLLEGE STATION INSPECTION NOTICE
Planning d Development Servicer
Date: 04/16/07
To: Bob Mosley ( 2 )
From: Deborah Grace
RE: Pebble Creek Phase 9F
Location: Quaker Ridge Dr. and St. Andrews Dr.
Public Water Lines/Fire Hydrants
IX Public Sanitary Sewer
X Public Storm Sewer
XI Public Streets Engineer's Estimates Attached
Public Detention Facility PI Construction Plans Attached
Driveway Connection to Public Street Site Plan Attached
Private Construction within easement n
No Inspection Required
Comments:
**Need to complete water line from Phase 90**
\\docserver\vol l\group\htltr\pzltr\prod\pz2007\p0017630.doc
Vt
V"-
--C S
r 1
11�
q
V �a
•
I A
V
6"6„<9,0,0,