HomeMy WebLinkAboutCost Estimate CHARLES KING
HORTICULTURAL SERVICES, INC.
P 0 DRAWER 10108
COLLEGE STATION,TX 77842
(979)219-3223
June 3, 2008
Civil Developement Ltd. Job Description: Tree planting &
2033 Harvey Mitchell Pkwy S. irrigation for Arrington Rd. detention
College Station, TX 77843 pond
Attention: Kent Laza
COST ESTIMATE
Material & labor to install 27 Live Oaks, 100 gallon, 16' X 8' X 31/2" - $ 22,140.00
includes 108 T posts, 24 cu yds sandy loam, 8 cu yds compost,
100 lbs 20-6-12
Irrigation — manual 2 station drip for trees only 1,680.00
Labor Included
Sales tax (8.25%) 1,965.15
TOTAL $ 25,785.15