HomeMy WebLinkAboutStaff Review 11/18/2008 14:20 9798460783 PINNACLE HOMESTEAD PAGE 06
10�03I2008 4 ;24;10 PM -0 FAXCOM PAGE 3 OF 3
STAFF REVIEW COMMENTS
Project: 3907 SANTOUR CT (ZBA) -08-00500239
PLANNING
1. Please revise page 2 of the application. Under the hardship description provided, it
is stated that the "city inspector missed the measurement'. Please remove this
comment as the city inspector is not responsible for measuring the setback, it is the
responsibility of the developer of the lot.
2. Revise the special condition description and hardship descriptions to say "building
setback" instead of easement.
Reviewed by: Matt Robinson Date: 10/3/08
10/03/2008 4 : 24 : 10 PM 500 FAXCOM PAGE 3 OF 3
STAFF REVIEW COMMENTS
Project: 3907 SANTOUR CT (ZBA) - 08-00500239
PLANNING
1. Please revise page 2 of the application. Under the hardship description provided, it
is stated that the "city inspector missed the measurement". Please remove this
comment as the city inspector is not responsible for measuring the setback, it is the
responsibility of the developer of the lot.
2. Revise the special condition description and hardship descriptions to say "building
setback" instead of easement.
Reviewed by: Matt Robinson Date: 10/3/08
Qg .2
)\ . 2-0
CG
STAFF REVIEW COMMENTS
Project: 3907 SANTOUR CT (ZBA) - 08-00500239
PLANNING
1. Please revise page 2 of the application. Under the hardship description provided, it
is stated that the "city inspector missed the measurement". Please remove this
comment as the city inspector is not responsible for measuring the setback, it is the
responsibility of the developer of the lot.
2. Revise the special condition description and hardship descriptions to say "building
setback" instead of easement.
Reviewed by: Matt Robinson Date: 10/3/08