Loading...
HomeMy WebLinkAboutCorrespondence CIVIL DEVELOPMENT, Ltd.* CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: September 24, 2008 To: Molly Hitchcock, AICP Planning Administrator Development Services City of College Station From: Joe Schultz, P.E. Civil Developme , td. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 joe@cdlbcs.com Subject: Preliminary Plat Harvey Mitchell Commercial Subdivision College Station, Texas Remarks: Attached is a revised application with the Owner's signature for Unisource and the documentation showing that Sultan Mahmood has authority to sign the document. Let me know if you have any questions or need additional information. 07. 23 * CIVIL DEVELOPMENT, Ltd.* CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: October 16, 2008 To: Jason Schubert Staff Planner Development Services City of College Station From: Joe Schultz, P.E. Civil Development, Ltd. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 joe@cdlbcs.com Subject: Revised Preliminary Plat Harvey Mitchell Commercial Subdivision College Station, Texas Remarks: Attached are 19-11x17 copies and 1 full-sized copy of the revised Preliminary Plat for the above-referenced project. Also attached is our Response to Staff Review Comments No. 1. Let me know if you have any questions or need additional information. !b/.2376 Y-y3 RESPONSE TO STAFF REVIEW COMMENTS NO. 1— 10/15/2008 Project: HARVEY MITCHELL COMMERCIAL SUBDIVISION (PP) - 08-00500238 PLANNING 1. Re-label the zoning description under the Lot 2, Block 2 owner from R-1 to R-3 and A-O. Correction made. 2. Please revise the name of"Minar Drive" to "Minar Court." Street name revised. 3. Provide the acreage for the individual lots in Phase 1. Acreage label added. 4. Provide a note on that plat that Lot 1, Block 1 and Lot 2, Block 2 will only have access to Minar Court and will not receive driveway access to Harvey Mitchell Parkway. Note 7 added to the plat. 5. Please provide a public access easement of at least 12 feet in width along Harvey Mitchell Parkway to cover the proposed public sidewalk and future pedestrian/bike path. Easement has been added to the plat. 6. Please note that cross access to Southwood Section 25 Lot 39A will be required with the development of Lot 1, Block 2. This may be provided on the plat or by separate instrument with a future site plan. Note 8 added to the plat. ENINEERING COMMENTS NO. 1 YI: Construction of the proposed "Minar Drive" connection to Harvey Mitchell Parkway will require TxDOT permitting and approval. Per the UDO, there may be the need for accel/decal lanes at this proposed driveway connection. /' Noted. /2 Minar Drive will need a cul-de-sac or to be looped. A cul-de-sac has been added in Phase 2 and a public access easement shown u•erwhich will be conveyed by separate instrument. he proposed dead end 8-in water main extension illustrated to serve Lot 2 would not be allowed per the BCS Design Guidelines. Please provide a note on the preliminary plat addressing the need to establish a looped water system once the development layout for lot 2 has been established. Note 9 added to the plat. . Please provide 20-ft rear PUE to all lots, the 20-ft can be centered on lot lines. Requested easements have been added to the plat. . There is some concern regarding the proposed sanitary sewer extension and subsequent creek crossing, cover issues, floodway encroachments, etc. Noted. TXDOT—all comments NOTED. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION —all comments NOTED. GENERAL ELECTRICAL COMMENTS — all comments NOTED. SANITATION —all comments NOTED. Print Form 1OAAo4 ()ik 11 PLANNING & DEVELOPMENT SERVICES J CM OF COT FGE STATION TRANSMITTAL COVER N9)38 Please check one of the options below to clearly define the purpose of your submittal. ❑ New Project Submittal ❑ Documents for a previous incomplete submittal yl Existing Project Submittal Revisapt4 . Q nig/mei/11j Project Name: NeZA v-e' /�f fd?e"/('9yyl,Y0Ge c 'v1�1 d1 Contact Name: J Phone No.: 7‘4 7743 We are transmitting the following for Planning & Development Services to review and comment. (Please check all that apply). El Comprehensive Plan Amendment ❑Non-Residential Architectural Standards ❑Rezoning Application ['Irrigation Plan ❑Master Development Plan ❑Variance Request $Preliminary Plat Revised I - fil si' c9 ❑Development Permit ❑Final Plat 1/- 1/xl/ ❑Conditional Use Permit ❑Development Plat ❑FEMA CLOMA/CLOMR/LOMA/LOMR ❑Site Plan ❑Grading Plan ❑Special District Site Plan (Other- Please specify below ❑Special District Building /Sign ❑ amovienis Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS All infrastructure documents must be submitted as a complete set. The following are included in the complete set: ❑ Waterline Construction Documents ❑TxDOT Driveway Permit ❑ Sewerline Construction Documents ❑TxDOT Utility Permit ❑ Drainage Construction Documents ❑Drainage Letter or Report ❑ Street Construction Documents ❑ Fire Flow Analysis ❑ Easement Application ❑Other- Please specify Special Instructions: 29-Aug-08 .. O D `, /� Rod O'Connor, Ph.D., FAAAS (j •)9 Do 1111L Chemical Consulting Services 1300 Angelina Court ill' College Station, TX 77840 phone: 979-693-5804 fax: 979-696-1227 e-mail:docroc34Grotmail.corn June 11, 2009 MEMORANDUM TO: Jason Schubert RE: The "McCrory Tract" Per our recent telephone conversation, I have enclosed a copy of the Land Purchase Agreement under which we bought a "buffer zone" in anticipation of development of the adjoining land. Pertinent exhibits are also enclosed. Paragraph 7 of the agreement deals with the issue of runoff water, and the signatures at the end of the agreement show that Sultan Mahmood, not Mike Butte, is the person authorized to act for the property owner(Unisource Real Estate Investments, LLC). If you need further information,please let me know. ( o'Covm-e-f