HomeMy WebLinkAboutStaff Review 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 6, 2008 TO: Rabon Metcalf, RME Consulting Engineers, via fax 979.690.0329 ✓ FROM: Lindsay Boyer, AICP, Senior Planner 101()I() SUBJECT: CREEK MEADOWS SECT 1-C PH. 1 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 13, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, November 6th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to mtrevino@cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). • Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Todd Carnes, Creek Meadows Partners, L.P., via fax 979.694.4141 Gary Arnold, Brazos County Planning & Traffic, via fax 775.0453 Case file #08-00500243 STAFF REVIEW COMMENTS NO. 1 Project: CREEK MEADOWS SECT 1-C PH. 1 (FP) - 08-00500243 PLANNING 1. Plat is not in compliance with the preliminary plat for Section 1C, Phase 1. Phase 1 includes 4 lots with a 50 foot access easement, the plat only shows 2 lots with a 25 foot access easement. 2. Please hatch the ROW dedication and clearly delineate the new property boundary. 3. The lots in this phase do not meet the minimum lot width required on rural roads. Please provide a variance request to meet the minimum requirements of Section 13 of the City's Subdivision Regulations Reviewed by: Lindsay Boyer Date: October 2, 2008 BRAZOS COUNTY 1. Variance is required to requirement of 70 foot lot width in the ETJ. Reviewed by: Gary Arnold Date: October 6, 2008 ENGINEERING COMMENTS NO. 1 1. Provide locations and distance to existing driveways. 2. Why are you constructing sanitary sewer line on adjacent A&M Super Storage property when you can construct it on yours? 3. Did you ever submit revised sanitary sewer report to include this area? 4. Construction plans and reports still under review. Reviewed by: Carol Cotter Date: October 6, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 30, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. N/A GENERAL ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/30/08. IV/ VO/GVVo '& : O't :ci FC! —VOW rAAUuM PAGE 2 OF 3 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone c 79.764.3570/Fax 979.764.3496 MEMORANDUM October 6, 2008 TO: Rabon Metcalf, RME Consulting Engineers, via fax 979.690.0329 FROM: Lindsay Boyer, AICP, Senior Planner SUBJECT: CREEK MEADOWS SECT 1-C PH. 1 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 13, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, November 6th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. / One(1) 24"x36"copy of the revised final plat; / Nineteen (19) 11"x17"copies of the revised final plat; e:.)V-. One (1) copy of tl•a digital file of the final plat on diskette or e-mail to mtrevino@cstx.gov; and C)1, The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required docum ents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.c3tx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Todd Carnes, Creek Meadows Partners, L.P., via fax 979.694.4141 Gary Arnold, Brazos County Planning &Traffic, via fax 775.0453 Case file#08-00500243 001-6 10- l� e4 1U/ Vo/GUUo '& : 31 : I PM -V0U0 rAXUUM PAGE 3 OF 3 • STAFF REVIEW COMMENTS NO. 1 Project: CREEK MEADOWS SECT 1-C PH. 1 (FP) - 08-00500243 PLANNING Plat is not in compliance with the preliminary plat for Section 1 C, Phase 1. Phase 1 includes 4 lots with a 50 foot access easement, the plat only shows 2 lots with a 25 foot access easement. Please hatch the ROW dedication and clearly delineate the new property boundary. 0/The lots in this phase do not meet the minimum lot width required on rural roads. Please provide a variance request to meet the minimum requirements of Section 13 of the City's Subdivision Regulations Reviewed by: Lindsay Boyer Date: October 2, 2008 BRAZOS COUNTY Z 1. Variance is required to requirement of 70 foot lot width in the ETJ. Reviewed by: Gary Arnold Date: October 6, 2008 ENGINEERING COMMENTS NO. 1 3 1. Provide locations and distance to existing driveways. 2. Why are you constructing sani•:ary sewer line on adjacent A&M Super Storage property when you can construct it on yours? 3. Did you ever submit revised sanitary sewer report to include this area? 4. Construction plans and reports still under review. n ,,,� Reviewed by: Carol Cotter Date: October 6, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 30, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. N/A GENERAL ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/30/08. 1V/VO/ GVVO L : JG : 10 ell -VJVV rtAt i1I reurc G Vr 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM October 8, 2008 TO: Rabon Metcalf, RME Consulting Engineers, via fax 979.690.0329 FROM: Carol Cotter, Sr. Assistant Engineer SUBJECT: CREEK MEADOWS SEC 1C PH 1 (FP) - Engineering Documents Staff reviewed the above-mentioned engineering documents as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: One (1) sets of revised construction documents. If you have any questions or need additional information, please call Carol Cotter at 979.764.3570. Attachments: Staff review cDmments cc: Todd Carnes, Creek Meadows Partners, L.P., via fax 979.694.4141 Case file#08-00500243 CR rr . 1V/ VO/ LVVO L ; UG : 1O ell -VJVV rt%AI..Vl7 YHVL. J lir J ENGINEERING COMMENTS NO. 2 BCS Design Guidelines specify two valves at every tee connection including hydrant leads. Add valve to 16" line. This will also facilitate the required relqcation of same water line with �� /subsequent phases. Pc.,•0t, t1TJorJ /14 'rGFs17KK f}CtCNowF._ t. O&fr'Cr- Cr?y Slyva �S What is stormwater plans for Section 1C? This Section does not appear to have been included in the overall Drainage Study. A77/A-Crfg Doesn't County require sleeving of all utility roadway crossings? -- No : ONLY Pu 84_1 c 5reafErTS p1!'Submit "Letter Acknowledging City Standards". A'T7fIGN Arm PO121 VM7E 110-1 vF..-wf 5 Reviewed by: Carol Cotter Date: October 8, 2008 STAFF REVIEW COMMENTS NO. 1 Project: CREEK MEADOWS SECT 1-C PH. 1 (FP) -08-00500243 PLANNING �,7Plat is not in compliance wi':h the preliminary plat for Section 1C, Phase 1. Phase 1 includes 4 lots with a 50 foot access easement, the plat only shows 2 lots with a 25 foot access easement. k2/Please hatch the ROW dedication and clearly delineate the new property boundary. („3 `The lots in this phase do not meet the minimum lot width required on rural roads. Please provide a variance request to meet the minimum requirements of Section 13 of the City's Subdivision Regulations Reviewed by: Lindsay Boyer Date: October 2, 2008 BRAZOS COUNTY 1. Variance is required to requirement of 70 foot lot width in the ETJ. Reviewed by: Gary Arnold Date: October 6, 2008 ENGINEERING COMMENTS NO. 1 �,,, 5,.. A ,cN, 3 Gly'Provide locations and distance tc existing driveways. e.Why are you constructing sanitary sewer line on adjacent A&M Super Storage property p4hen you can construct it on yours? - SBE I Eve 7"1115 /7r4,..,/ m5 .2e'4 plezepiEp id you ever submit revised sanitary sewer report to include this area? ATTAtti ol!Construction plans and reports Will under review. a Reviewed by: Carol Cotter Date: October 6, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 30, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. N/A GENERAL ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSIJ Electric, (979) 764-3439. Date: 09/30/08. 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM October 6, 2008 TO: Rabon Metcalf, RME Consulting Engineers, via fax 979.690.0329 FROM: Lindsay Boyer, AICP, Senior Planner SUBJECT: CREEK MEADOWS SECT 1-C PH. 1 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 13, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for Thursday, November 6th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to mtrevino@cstx.gov; and The Mylar original of the revised final plat with the owner and County Judge's signatures (will be required after the County's approval). Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed, your project will not be scheduled for the Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff Review Comments cc: Todd Carnes, Creek Meadows Partners, L.P., via fax 979.694.4141 Gary Arnold, Brazos County Planning &Traffic, via fax 775.0453 Case file#08-00500243 STAFF REVIEW COMMENTS NO. 1 Project: CREEK MEADOWS SECT 1-C PH. 1 (FP) - 08-00500243 PLANNING 1. Plat is not in compliance with the preliminary plat for Section 1C, Phase 1. Phase 1 includes 4 lots with a 50 foot access easement, the plat only shows 2 lots with a 25 foot access easement. 2. Please hatch the ROW dedication and clearly delineate the new property boundary. 3. The lots in this phase do not meet the minimum lot width required on rural roads. Please provide a variance request to meet the minimum requirements of Section 13 of the City's Subdivision Regulations Reviewed by: Lindsay Boyer Date: October 2, 2008 BRAZOS COUNTY 1. Variance is required to requirement of 70 foot lot width in the ETJ. Reviewed by: Gary Arnold Date: October 6, 2008 ENGINEERING COMMENTS NO. 1 1. Provide locations and distance to existing driveways. 2. Why are you constructing sanitary sewer line on adjacent A&M Super Storage property when you can construct it on yours? 3. Did you ever submit revised sanitary sewer report to include this area? 4. Construction plans and reports still under review. Reviewed by: Carol Cotter Date: October 6, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 30, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. N/A GENERAL ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/30/08. STAFF REVIEW COMMENTS NO. 1 Project: CREEK MEADOWS SEC 5 PH 1 (FP) - 08-00500233 PLANNING 1. Please also note for the setbacks that they are in accordance with the PDD rezoning on the site, City Ordinance#3079. 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 3. The construction documents and reports are still under review and may affect the plat. Reviewed by: Lindsay Boyer Date: October 2, 2008 ENGINEERING COMMENTS NO. 1 1. Show limits of floodplain determined by your flood study. 2. Is HOA Note 2 correct? 3. Engineering construction documents and reports are still under review. Reviewed by: Carol Cotter Date: October 6, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. N/A GENERAL ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/30/08. SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 30, 2008 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2