HomeMy WebLinkAboutStaff Report 0
STAFF REPORT
Item: Presentation, possible action, and discussion on a Variance Request to Section 8-M
Sidewalks of the Subdivision Regulations, and a presentation, possible action, and discussion
on a Preliminary Plat for the Super B Phase 2 Subdivision consisting of 1 lot on 1.88 acres
located at 2000 FM 158 in the general vicinity of the northwest intersection of FM 158 and
Harvey Road.
This-plat is in preparation for commercial development on the tract. The
development will,a1l o include the relocation of an existing detention pond
and the extension of a joint access easement from the neighboring
property.
v G c.TY 4 Ci -P:ibUty
Section 8-M of the Subdivision Regulations require that sidewalks shall be
required on both sides of all streets having a right-of-way width equal to or
greater than sixty feet. The applicant is requesting a variance to this
section. Harvey Road currently has a ditch section.
The Comprehensive Land Use Plan identifies this area as Retail Regional.
The property has approximately 344 feet of frontage on State Highway 30,
a Major Arterial on the City's Thoroughfare Plan. The subdivision is not
proposing the extension of any sidewalks. The location of the access bKisbeE:'�1I
easement identified for the driveway is pending, subject to TxDOT vowed
approval. This location may be moved on the Final Plat based on TxDOT
comments.
Except for the provision of sidewalks, this plat is in compliance with the
remaining sections of the Subdivision Regulations.
Staff Recommendations: If the variance is granted, staff recommends
approval of the preliminary plat with the condition that the attached Staff
Review Comments #3 are addressed.
The Commission must act on the variance first, before acting on the
preliminary plat.
INFRASTRUCTURE AND FACILITIES
Water Service: The subject property will be served by an existing 12-in water main
located adjacent to the subject property along SH 30.
Sewer Service: The subject property will be served by an existing 8-in sanitary sewer
main located along the eastern property line.
Street(s) required for plat: The subject property will be dedicating a portion of the
required 120-ft ROW for SH 30.
Streets/Access: The subject property will take access off SH 30, which is shown as a
major arterial on the city's thoroughfare plan.
Off-site Easements required for plat: none known at this time
Drainage: The subject property is located in the Carter's Creek Drainage Basin.
Flood Plain: none
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: None.
Parkland Dedication Fees: None.
The subject property was annexed in 1980, and subsequently zoned A-O,
Agricultural Open. The property was rezoned in 1999 to C-B, Business
Commercial. With the adoption of the Unified Development Ordinance in
2003, all C-B, Business Commercial districts became C-1 , General
Commercial. This property has not previously been platted. It was included
in a preliminary plat from 1999, however it expired in 2001 . There has been
no recent development on this property, however, it is in the vicinity of the
Crescent Pointe plats.
STAFF REPORT
Project Manager: Lindsay Boyer, Staff Planner Report Date: August 25, 2006
Email: Iboyer@cstx.gov Meeting Date: September 7, 2006
Project Number: 06-00500134
Item: Presentation, possible action, and discussion on a Variance Request to Section 8-M
Sidewalks of the Subdivision Regulations, and a presentation, possible action, and discussion
on a Preliminary Plat for the Super B Phase 2 Subdivision consisting of 1 lot on 1.88 acres
located at 2000 FM 158 in the general vicinity of the northwest intersection of FM 158 and
Harvey Road.
Applicant: Garrett Engineering, engineer for the owner Sahn Trihn.
Staff Recommendations: Staff recommends approval of the preliminary plat with the condition
that the attached Staff Review Comments #3 are addressed.
Item Summary: This plat is in preparation for commercial development on the tract. The
development will also include the relocation of a detention pond that will serve both the Exxon
station at the corner and this development. Additionally, the access easement through the
Exxon station property (Super B, Phase 1) will be extended through this property.
Section 8-M of the Subdivision Regulations require that sidewalks shall be required on both
sides of all streets having a right-of-way width equal to or greater than sixty feet. The applicant
is requesting a variance to this section. Harvey Road currently has a ditch section. In
considering a variance, the Planning and Zoning Commission should make the following
findings:
1. That there are special circumstances or conditions affecting the land involved such
that strict application of the provisions of this chapter will deprive the applicant of the
reasonable use of his land;
2. That the variance is necessary for the preservation and enjoyment of a substantial
property right of the applicant;
3. That the granting of the variance will not be detrimental to the public health, safety,
or welfare, or injurious to other property in the area, or to the City in administering
this chapter; and
4. That the granting of the variance will not have the effect of preventing the orderly
subdivision of other land in the area in accordance with the provisions of this chapter.
Comprehensive Plan Considerations: The Comprehensive Land Use Plan identifies this area
as Retail Regional. The Land Use Plan was updated in 2001 with the 30/60 Small Area Plan.
The property has approximately 344 feet of frontage on State Highway 30, a Major Arterial on
the City's Thoroughfare Plan. The subdivision is not proposing the extension of any sidewalks.
The location of the access easement identified for the driveway is pending, subject to TxDOT
approval. This location may be moved on the Final Plat based on TxDOT comments.
Except for the provision of sidewalks, this plat is in compliance with the remaining sections of
the Subdivision Regulations.
Item Background: The subject property was annexed in 1980, and subsequently zoned A-O,
Agricultural Open. The property was rezoned in 1999 to C-B, Business Commercial. With the
adoption of the Unified Development Ordinance in 2003, all C-B, Business Commercial districts
became C-1, General Commercial. This property has not previously been platted. It was
included in a preliminary plat from 1999, however it expired in 2001. There has been no recent
development on this property, however, it is in the vicinity of the Crescent Pointe plats.
Budgetary & Financial Summary: N/A
Related Advisory Board Recommendations: N/A
Commission Action Options Regarding the Variance Requests: The Commission must
consider each variance request prior to approving the preliminary plat. The options for each
variance request are:
• Approval
• Denial
Commission Action Options Regarding the Preliminary Plat: The Commission has final
authority over the preliminary plat. The options regarding the preliminary plat are:
• Approval
• Denial
INFRASTRUCTURE AND FACILITIES
Water Service: The subject property will be served by an existing 12-in water main
located adjacent to the subject property along SH 30.
Sewer Service: The subject property will be served by an existing 8-in sanitary sewer
main located along the eastern property line.
Street(s) required for plat: The subject property will be dedicating a portion of the
required 120-ft ROW for SH 30.
Streets/Access: The subject property will take access off SH 30, which is shown as a
major arterial on the city's thoroughfare plan.
Off-site Easements required for plat: none known at this time
Drainage: The subject property is located in the Carter's Creek Drainage Basin.
Flood Plain: none
Oversize request: See Budgetary and Financial Summary Section.
Impact Fees: None.
Parkland Dedication Fees: None.
Supporting Materials:
1. Small Area Map (SAM) and Aerial Map
2. Application
3. Staff Review Comments #3
4. Variance Request Letter
5. Copy of Preliminary Plat (provided in packet)