HomeMy WebLinkAboutEnginneering Doc CITY INFRASTRUCTURE
CITY OF COLLEGE STATION INSPECTION NOTICE
Planning&Development Services
Date: 02/26/08
To: Alan Gibbs _
From: Deborah Grace
RE: PEBBLE CREEK PHASE 9H
Location: Congressional Dr. and St. Andrews Dr.
IX Public Water Lines/Fire Hydrants
X Public Sanitary Sewer
X Public Storm Sewer
X Public Streets 1 Engineer's Estimates Attached
Public Detention Facility 2 Construction Plans Attached
Driveway Connection to Public Street Site Plan Attached
Private Construction within easement
No Inspection Required
Comments:
****ACCEPTANCE OF PHASE 9G INFRASTRUCTURE REQUIRED PRIOR TO ACCEPTANCE OF
PHASE 9H****
\\doc server\vol 1\group\htltr\pzltr\prod\pz2007\p0021413.do c