Loading...
HomeMy WebLinkAboutEnginneering Doc CITY INFRASTRUCTURE CITY OF COLLEGE STATION INSPECTION NOTICE Planning&Development Services Date: 02/26/08 To: Alan Gibbs _ From: Deborah Grace RE: PEBBLE CREEK PHASE 9H Location: Congressional Dr. and St. Andrews Dr. IX Public Water Lines/Fire Hydrants X Public Sanitary Sewer X Public Storm Sewer X Public Streets 1 Engineer's Estimates Attached Public Detention Facility 2 Construction Plans Attached Driveway Connection to Public Street Site Plan Attached Private Construction within easement No Inspection Required Comments: ****ACCEPTANCE OF PHASE 9G INFRASTRUCTURE REQUIRED PRIOR TO ACCEPTANCE OF PHASE 9H**** \\doc server\vol 1\group\htltr\pzltr\prod\pz2007\p0021413.do c