HomeMy WebLinkAboutPlans_ -A
Of
l#J
NOTES'
EXI5TINCG 10' P.U.E. \1551-P& LINE
BED PREPARATION
• SPRAY FLUOZIFOP P -BUM FOR EXISTING VEG REMOVAL
• SPREAD AMAZE 0 4 LBS / 1000 SQ FT
• 4' TO 6' 1:1 TOPSOIL/COMPOST MIX IN BED
SPREAD AMAZE ® 2 LBS / 1000 SQ FT
• PLANT WITH ROOT LEVEL 1' MAX BELOW GRADE
• 4' SHREDDED HARDWOOD MULCH
. 1.25' NON -CANOPY BUFFER TREE, - - i
1 PER 15', TYP. (7.6.F.2)
2' CANOPY BUFFER TREE,
1 PER 25', TYP. (7.6.F.2)
SEE NOTE ON SITE PIAN
FOR SCREENING, TYP
1513 SF SHOP
FF = 100.50
WE � • ,
►� � SII
R,,�.� - -
\ �\ Fx,- 10' P U E. I
1. )KPROPOSED LANDSCAPING IS SUBJECT TO CHANGE BASED ON THE NEEDS OF THE SITE FINAL LANDSCAPING PLAN MUST MEET
THE REQUIREMENTS AS OUTLINED IN SECTION 7.5 OF THE CITY OF COLLEGE STATION UNIFIED DEVELOPMENT ORDINANCE.
2. 100% COVERAGE OF GROUND COVER, DECORATIVE PAVING, DECORATIVE ROCK, OR PERENNIAL GRASS IS REQUIRED IN PARKING
LOT ISLANDS, SWALES, AND DRAINAGE AREAS, THE PARKING LOT SETBACK, RIGHTS-OF-WAY, AND ADJACENT PROPERTY
DISTURBED DURING" CONSTRUCTION.
3. ALL ROOF AND GROUND MOUNTED MECHANICAL EQUIPMENT SHALL BE SCREENED FROM VIEW OR ISOLATED SO AS NOT TO BE
VISIBLE FROM ANY PUBLIC RIGHT-OF-WAY OR RESIDENTIAL DISTRICT WITHIN 150' OF THE SUBJECT LOT MEASURED FROM A
POINT FIVE FEET ABOVE GRADE, SCREENING SHALL BE COORDINATED WITH THE BUILDING ARCHITECTURE AND SCALE TO
MAINTAIN A UNIFIED AFPEARANCE.
4, AN IRRIGATION PLAN WILL BE APPROVED PRIOR TO C.O. IT WILL INCLUDE A PRESSURE VACUUM BREAKER, RPZ, OR DOUBLE
CHECK BACKFLOW PREVENTER INSTALLED AND TESTED PER CITY ORDINANCE 2394.
5, LANDSCAPING FOR FUTURE DEVELOPMENT WILL BE DEMONSTRATED WITH ITS RESPECTIVE SITE PLANS,
6. ALL WORK SHALL COMPLY WITH CITY OF COLLEGE STATION STANDARDS,
Q
y
_I %'ZO
O�
N
X CANOPY TREE FOR `b
STREETSCAPE (7.5.1))
SHRUBS TO SCREEN
CL PARKING, 5OX EVERGREEN,
N x 36' OC, 3' TALL, 5 GAL, o so' 40'
z MIN. 2' FROM BACK OF
N CURB .5)
X J x � METAL
X Q
d w LANDSCAPE
m x EDGING
1—
S— ss ss—ss ss— ssNs
n e -
i SFi&r IL'
EWREH- II
T_ll Q -4
777._S o
.:� II
HT 96"
.. •., it III I
may, .- _ II n' p � •
`-1:. _m � • II III
- . X
II
II
6' WOOD FENCE �' I �4 W zA
FOR SCREENING1 " oro, 'm a .N m H (0
< v $4 JU
LI I 0 ti v ry y.
O ro O ro N z to _
PHASE itN f
6 PARD NG SPACES
0 o b)� 4J b e y A '4 a
a Q. w w N 23� a
.ry sm s.. w+ma reaw.vwwwwwg xO I °k A U ': W H U �, W r -I a Rf O
dy H�
G W \ 'S. A s -I rV ` •• rn
Ln
U . Z�W- Z r4 H
N N �� m01
a wzCn a
OLu
^� 000 D_/N( X (1 w `� W a W E a A Sa HP4 M �
E4 P4 Z Z
Cq m o _— Q (� (� H 0 to W H O cA En O O M H W
6 iia x I I V x W w W w W w w a s
1 a8 m 0 -X p N W 2 2 7 W 2 2 A a O H
n v Q ° N O Q: :4 S O
L
PHASE TWO DEVELOPMENT U]
" " o `� " x "
4. wsm w ww wwwwwww ss:l x I , U U •Zi
-REVIEWED FOil
- - - — --- -- ! t FEB i r ^007 }
COLLEGE STATION
i. DEVELOPMENT SERVICI S
A0 01 29 2007 ORIGINAL DESIGN
STREETSCAPE ANALYSIS (7.5.D):
REQUIRED:
189' FRONTAGE @ 1 CANOPY TREE / 25' ............... 8
PROPOSED*:
rANnPY TREES ...................................... 8
LANDSCAPE ANALYSIS (7.5.C):
REQUIRED:
2.59 ACRES = 112,820 SF LOT AREA
30'X260'= "7,800 SF BUFFER AREA
112,820-7,800 = 105,020 SF SITE AREA
105,020 SF @ 30 PTS / 1,000 SF ................... 3,151
189' FRONTAGE @ 300 PTS/50' (7.5.D.3)............ 1,134
TOTAL.......................................... 4,285
PROPOSED* (INCLUDES STREETSCAPE, NOT BUFFER):
CANOPY TREE, 3.5" DIA @ 300 POINTS, 12 31600
CANOPY TREE, 2.1" DIA @ 150 POINTS, 0 .......... 0
NON -CANOPY TREE, 1.25" DIA @ 40 POINTS, 12 ...... 480
SHRUB, 5 GAL @ 10 POINTS, 21 ................... 210
TOTAL.......................................... 4,290
BUFFER ANALYSIS (7.6.F):
MIN
REQUIRED:
t'
ON5 -
ZONE M-2 TO R-4 BUFFER
YARD 15' X 2........... 30'
GRAM RROA: OAD SIDEWALK
GRAHAM
6' WOOD FENCE
1.25" NON -CANOPY TREE
260' . @ 1/15' ........... 36
2.59 ACRES, LOT 1
2" CANOPY TREE 260' @
1/25' .................. 22
GRAHAM ROAD BUSINESS CENTER
PROPOSED*:
4
i.W� cilk
30'
6' WOOD FENCE
FREDDIE CURRY
1.25" NON -CANOPY TREE
....... ; . ..............: 36
2102 ROCK PRAIRIE RD.
'CANOPY
22
tIlk
2" TREE ...............................
(979) 690-2260
Gurry Plumbing
V. of re �
�AS'��,
P Pledger Kalkomey, Inc.
College Station, Texas
_ -A
Of
l#J
NOTES'
EXI5TINCG 10' P.U.E. \1551-P& LINE
BED PREPARATION
• SPRAY FLUOZIFOP P -BUM FOR EXISTING VEG REMOVAL
• SPREAD AMAZE 0 4 LBS / 1000 SQ FT
• 4' TO 6' 1:1 TOPSOIL/COMPOST MIX IN BED
SPREAD AMAZE ® 2 LBS / 1000 SQ FT
• PLANT WITH ROOT LEVEL 1' MAX BELOW GRADE
• 4' SHREDDED HARDWOOD MULCH
. 1.25' NON -CANOPY BUFFER TREE, - - i
1 PER 15', TYP. (7.6.F.2)
2' CANOPY BUFFER TREE,
1 PER 25', TYP. (7.6.F.2)
SEE NOTE ON SITE PIAN
FOR SCREENING, TYP
1513 SF SHOP
FF = 100.50
WE � • ,
►� � SII
R,,�.� - -
\ �\ Fx,- 10' P U E. I
1. )KPROPOSED LANDSCAPING IS SUBJECT TO CHANGE BASED ON THE NEEDS OF THE SITE FINAL LANDSCAPING PLAN MUST MEET
THE REQUIREMENTS AS OUTLINED IN SECTION 7.5 OF THE CITY OF COLLEGE STATION UNIFIED DEVELOPMENT ORDINANCE.
2. 100% COVERAGE OF GROUND COVER, DECORATIVE PAVING, DECORATIVE ROCK, OR PERENNIAL GRASS IS REQUIRED IN PARKING
LOT ISLANDS, SWALES, AND DRAINAGE AREAS, THE PARKING LOT SETBACK, RIGHTS-OF-WAY, AND ADJACENT PROPERTY
DISTURBED DURING" CONSTRUCTION.
3. ALL ROOF AND GROUND MOUNTED MECHANICAL EQUIPMENT SHALL BE SCREENED FROM VIEW OR ISOLATED SO AS NOT TO BE
VISIBLE FROM ANY PUBLIC RIGHT-OF-WAY OR RESIDENTIAL DISTRICT WITHIN 150' OF THE SUBJECT LOT MEASURED FROM A
POINT FIVE FEET ABOVE GRADE, SCREENING SHALL BE COORDINATED WITH THE BUILDING ARCHITECTURE AND SCALE TO
MAINTAIN A UNIFIED AFPEARANCE.
4, AN IRRIGATION PLAN WILL BE APPROVED PRIOR TO C.O. IT WILL INCLUDE A PRESSURE VACUUM BREAKER, RPZ, OR DOUBLE
CHECK BACKFLOW PREVENTER INSTALLED AND TESTED PER CITY ORDINANCE 2394.
5, LANDSCAPING FOR FUTURE DEVELOPMENT WILL BE DEMONSTRATED WITH ITS RESPECTIVE SITE PLANS,
6. ALL WORK SHALL COMPLY WITH CITY OF COLLEGE STATION STANDARDS,
Q
y
_I %'ZO
O�
N
X CANOPY TREE FOR `b
STREETSCAPE (7.5.1))
SHRUBS TO SCREEN
CL PARKING, 5OX EVERGREEN,
N x 36' OC, 3' TALL, 5 GAL, o so' 40'
z MIN. 2' FROM BACK OF
N CURB .5)
X J x � METAL
X Q
d w LANDSCAPE
m x EDGING
1—
S— ss ss—ss ss— ssNs
n e -
i SFi&r IL'
EWREH- II
T_ll Q -4
777._S o
.:� II
HT 96"
.. •., it III I
may, .- _ II n' p � •
`-1:. _m � • II III
- . X
II
II
6' WOOD FENCE �' I �4 W zA
FOR SCREENING1 " oro, 'm a .N m H (0
< v $4 JU
LI I 0 ti v ry y.
O ro O ro N z to _
PHASE itN f
6 PARD NG SPACES
0 o b)� 4J b e y A '4 a
a Q. w w N 23� a
.ry sm s.. w+ma reaw.vwwwwwg xO I °k A U ': W H U �, W r -I a Rf O
dy H�
G W \ 'S. A s -I rV ` •• rn
Ln
U . Z�W- Z r4 H
N N �� m01
a wzCn a
OLu
^� 000 D_/N( X (1 w `� W a W E a A Sa HP4 M �
E4 P4 Z Z
Cq m o _— Q (� (� H 0 to W H O cA En O O M H W
6 iia x I I V x W w W w W w w a s
1 a8 m 0 -X p N W 2 2 7 W 2 2 A a O H
n v Q ° N O Q: :4 S O
L
PHASE TWO DEVELOPMENT U]
" " o `� " x "
4. wsm w ww wwwwwww ss:l x I , U U •Zi
-REVIEWED FOil
- - - — --- -- ! t FEB i r ^007 }
COLLEGE STATION
i. DEVELOPMENT SERVICI S
A0 01 29 2007 ORIGINAL DESIGN
STREETSCAPE ANALYSIS (7.5.D):
REQUIRED:
189' FRONTAGE @ 1 CANOPY TREE / 25' ............... 8
PROPOSED*:
rANnPY TREES ...................................... 8
LANDSCAPE ANALYSIS (7.5.C):
REQUIRED:
2.59 ACRES = 112,820 SF LOT AREA
30'X260'= "7,800 SF BUFFER AREA
112,820-7,800 = 105,020 SF SITE AREA
105,020 SF @ 30 PTS / 1,000 SF ................... 3,151
189' FRONTAGE @ 300 PTS/50' (7.5.D.3)............ 1,134
TOTAL.......................................... 4,285
PROPOSED* (INCLUDES STREETSCAPE, NOT BUFFER):
CANOPY TREE, 3.5" DIA @ 300 POINTS, 12 31600
CANOPY TREE, 2.1" DIA @ 150 POINTS, 0 .......... 0
NON -CANOPY TREE, 1.25" DIA @ 40 POINTS, 12 ...... 480
SHRUB, 5 GAL @ 10 POINTS, 21 ................... 210
TOTAL.......................................... 4,290
BUFFER ANALYSIS (7.6.F):
REQUIRED:
A ADDED ACCESSIBLE ROUTE TO
ZONE M-2 TO R-4 BUFFER
YARD 15' X 2........... 30'
GRAM RROA: OAD SIDEWALK
GRAHAM
6' WOOD FENCE
1.25" NON -CANOPY TREE
260' . @ 1/15' ........... 36
2.59 ACRES, LOT 1
2" CANOPY TREE 260' @
1/25' .................. 22
GRAHAM ROAD BUSINESS CENTER
PROPOSED*:
PROPERTY OWNER / DEVELOPER:
BUFFER YARD ..................................
30'
6' WOOD FENCE
FREDDIE CURRY
1.25" NON -CANOPY TREE
....... ; . ..............: 36
2102 ROCK PRAIRIE RD.
'CANOPY
22
COLLEGE STATION; TX 77845
2" TREE ...............................
(979) 690-2260
Gurry Plumbing
V. of re �
�AS'��,
P Pledger Kalkomey, Inc.
College Station, Texas
*: o ••••*,
ConsultngEngineers
'
A:SIEVEEDUNCAN••••;
K
Landscape Plan
' •.
A' Is sEa wAs
AUTHORIZED BY
7020 Coyote Rua Bryan, Texas 77808
979-731-8000 979-731-1500(Fax)
SME ERE 83252 CAN
35CAN
www.pkengineering.com
Design: CAD: lob No: IhnwinB No:
i/
ON 02/13/2007
Brenham • Bryan • Rosenberg
SED TOW 43306-291 LI of i
JI
VICINITY MAP, N.T.S.
(
Lain
WATER
2,590 SF OFFICE @
PROPERTY OWNER / DEVELOPER:
1 SPACE PER 250 SF ..............
10.4
6,200 SF WAREHOUSE @
MAXIMUM
U
I
TOTAL ........................
17
PROPOSED: ........................
18
HANDICAP PARKING ANALYSIS (TAS):
4. FLOOD HAZARD STATEMENTI ACCORDING TO THE FLOOD INSURANCE RATE MAP COMPILED BY THE FEDERAL EMERGENCY
REQUIRED:
36,000
HANDICAP SPACES (1-25) ............
1
VAN ACCESSIBLE (1 PER 8) ..........
1
PROPOSED:
COUNTY, TEXAS DATED JULY 2,N1992, IT 1992,AL ITSURANCE THAT THISRPROPERTYOMDOESTNOTANEL FALLNO. WITHIN 0, YEAR FLOOD
FLOOD
HANDICAP SPACES ..................
1
u�
w
1
(979) 690-2260
PAVEMENT SECTION
z�
wu
exas ALC II Inc.
AeI
Edelweiss Estates
PH 3A,
nlock 10, Lot 1,
Acres
4.575
13Vol. 5830 Pg. 41
Zoned R-4
I
+
i
0
+
�A
L
0110
I v +
PARKING ANALYSIS (7.2.H):
L D I N
REQUIRED:
WATER
2,590 SF OFFICE @
PROPERTY OWNER / DEVELOPER:
1 SPACE PER 250 SF ..............
10.4
6,200 SF WAREHOUSE @
MAXIMUM
1 SPACE PER 1,000 SF ...........
6.2
TOTAL ........................
17
PROPOSED: ........................
18
HANDICAP PARKING ANALYSIS (TAS):
4. FLOOD HAZARD STATEMENTI ACCORDING TO THE FLOOD INSURANCE RATE MAP COMPILED BY THE FEDERAL EMERGENCY
REQUIRED:
36,000
HANDICAP SPACES (1-25) ............
1
VAN ACCESSIBLE (1 PER 8) ..........
1
PROPOSED:
COUNTY, TEXAS DATED JULY 2,N1992, IT 1992,AL ITSURANCE THAT THISRPROPERTYOMDOESTNOTANEL FALLNO. WITHIN 0, YEAR FLOOD
FLOOD
HANDICAP SPACES ..................
1
VAN ACCESSIBLE ...................
1
Texas A&M Research Foundation, \0
University Industrial Center ��
XISTING 20' PUE + + Lot 88\(Rem.), Acres 2.5833 SECURITY GATE +� EXISTING TRANSFOfER 46*sAwAR"y ���'�Vol. 22bi Pg. 256 WITH KdIOX BOX a`p 1•.071E" MINoZoned M ,2 °' ° _j � O
MC& CONDUIT
CD
�\ x z
a•
nh ° 0
20'
EXISTINGfI U.E. 75BLDG LINE
CLEANOUT uj a IX. 12
� SANITARY UNE w
a nu TIE N RANGE i Q I z
7.5' BUILDING UN
CONCRETE IN�NNrszr �k u W LL
DE1T]ITION NO OUTLET PAVING, TYP. m
STRUCTURE w +
o i cv
\ —
0 CLEANOUT }
SEE MEP FO m CLEAN0 FL: 92.63
3 -RAIL o ..
GUARD CONTINU w + �.
/ <.. - OF SS—,C8, s ss ss— ; -V Ss— ss ss ss a '
FENCE o o w: . , ° : 4 PVC IRRIGATION A
L—.
/ FUEUNG STATION o >x _ y , u.
G.
2 N 1,000—GAL - o. v F •:.- ' .• ` .
NCO' ELEVATED TANKS 3 SIO _ :. u
D
1 1:1- � _= -. , _ _ __ _ _ _ 300 LAY -OF -HOSE TYP � - _ � � :.. a; , . � _ � � \ .. __._ � _ � �.. a
� Q, .--1 F � � 13P1 Y Q - :. a � \ o •@�\o
+ N A "s w I WIDEN \o \
r� 6" ' w DRIVE,
I.R.
a
WON 1
o - AtlMlltlH s u o FIRE HYDRW
oa
Ni(NOX BOX o I � ii (SEE PLANS)) �
Fa m a > y N��p '
R n e • - - " EAR FRO I (I co V
n iryry`�mi� �' 11 x
m n ••'e .' -, a.� III 0
0 II I
p{y
VV a
Uj 111 6" WATER UNE �'NCI MM •
J BERM WALT. ! ONO ,Ot X .ZI Ir _ (SEE PUNS) MOQt/3
6" PIPE " o, ,.
WALE
DETENTION _� BOLLARD °{ �" 2 N 3' PVC CONDUIT CURB TYP I "�
z
39 � r:s.n .smm. ..n.-ry c -•.:,,se ,.. � � o ��
[SECURITY GATE WITH ••�..--� ri;r x _
KNOX-BOX w 0 REVIEWED FC)6.,g
+ + - _ _ rr ^ NOD
1 1 2" WATER do COMPLIANCE
pq Ai ft 2. "A� , FEB 15 2Gu10 -- �- v- IRRIGATI N SERVICE a� D` I 1 PHASE NO � 6 PIPE 1 1 6 PARI ING SPAC S COLLEGE STATION
BOUARD TYP. 1513 SF SHOP 1 1 E I = ¢ ( EVEL11MENT SERVICES
FF = t00.50 t I °
IX. 12
of i i .� m .� �, , �, .� A �. \` IJ I n WATER UNE.
15'/BUILDII IG UN _ t
00 0
w (^ t�EVI>E9V
I W N W Y I , 0 f tl z� I + L C®MPLIA6VC --
6 WOOD PRIVACY 1a ' �� , w
FENCE ON PROPERTY' 1 a +-0N ) e ox s -- Q
10PUE
UNE WITH 6' CHAIN I I 1 w 2 "a , x w I \ FEB 15 2007
LINK FENCE ON INSIDE, TYP i 1 ' a +m ' ,J a + I v LD D Io
' BLDG LINE EXI5TING 10' P.U.E. I 1 ! a` �� x
ENGINEERING
IC
1 1 o PHASE TWO DEVELOPM li
.�
_-__ __J.�.�..�..�,.� ...�. sen! --_ X00 5' < EL
a
EVATI DN
-- — --+- -- .w — - -_— _'.
•
2
BUILDING UNE
-- -- ----
_. c�TaTrFT r
.., o _ E
Hk W ❑ REQUIRE
b \ IY ❑ T1
13 +2
�
0 15TING 10' P.U.E. 0`?0 7.5 B NG UNE �' ._\ \, \00, D .' DO 01/29/2007: ORIGINAL DESIG O +4'
o°' \0 Securcare Properties Dk NOT RFS, JIBED
University Industrial Center, \ 02/13/2007: ADDED ACCESSIBLE -ROUTE -40.
Lot 88.14 (Rem.), Acres 1.809 \ + GRAHAM ROAD SIDEWALK
Vol. 3397 Pg. 254 - --- —
NOTES, Zoned M-2 + 04�� � M10U5, 31
. URB 2.59 ACRES, LOT 1
B U I
L D I N
G
WATER
DEMAND
PROPERTY OWNER / DEVELOPER:
MINIMUM
0
GPM
MAXIMUM
95
GPM
AVERAGE
25
GPM
SEWER
DEMAND
4. FLOOD HAZARD STATEMENTI ACCORDING TO THE FLOOD INSURANCE RATE MAP COMPILED BY THE FEDERAL EMERGENCY
MAXIMUM
36,000
GPD
MANAGEMENT AGENCY OH
1THE21
i. LOT 1, GRAHAM ROAD BUSINESS CENTER, 2.59 ACRES, ROBERT STEVENSON LEAGUE, A-54, COLLEGE STATD7N, BRAZOS
COUNTY, TEXAS
EXPANSION JOINTS 3'R NOTES'
1 FA6'A44SION JOINTS. bO' MAX 5PA6I1119 AND
. o AT ALL RADIUS POINTS, PTs, AND PG5
GRAHAM ROAD BUSINESS CENTER
PROPERTY OWNER / DEVELOPER:
2. ZONED M-2 FOR HEAVY COMMERCIAL.
�' + ' �6' FIRE LANE, 2 CONTRPGTION JOINTS, IO' MAX SPACING.
$' OTHER
3, ALL PROPOSED SIGNS WILL BE REVIEWED AND PERMITTED SEPARATELY.
3. THESE AM: CITY MINI r
#4 BARS G-.EOTWlM�AI HMM POR PROJFS.TRMT r -at PWJ6cT
a 19.00tiN
FREDDIE CURRY
4. FLOOD HAZARD STATEMENTI ACCORDING TO THE FLOOD INSURANCE RATE MAP COMPILED BY THE FEDERAL EMERGENCY
SUDGRADE EINFORCED
2102 ROCK PRAIRIE RD.
MANAGEMENT AGENCY OH
1THE21
CONCRETE
COUNTY, TEXAS DATED JULY 2,N1992, IT 1992,AL ITSURANCE THAT THISRPROPERTYOMDOESTNOTANEL FALLNO. WITHIN 0, YEAR FLOOD
FLOOD
COLLEGE STATION, TX 77845
HAZARD BOUNDARY,
(979) 690-2260
PAVEMENT SECTION
INTERIOR ISLAND PARKING ANALYSIS (7.2.E):
REQUIRED:
TOTAL INTERIOR PARKING = 11
11 @ 180 SF PER 15 INTERIOR SPACES ............... 0
PROPOSED:
ISLAND ADDITIONAL SIZE ........................ N/A
5, ALL ROOF AND GROUND MOUNTED MECHANICAL EQUIPMENT SHALL BE SCREENED FROM VIEW OR ISOLATED SO AS NOT TO
BE VISIBLE FROM ANY PUBLIC RIGHT-OF-WAY OR RESIDENTIAL DISTRICT WITHIN 150' OF THE SUBJECT LOT MEASURED _�..�.._
FROM A POINT FIVE FEET ABOVE GRADE. SCREENING SHALL BE COORDINATED WITH THE BUILDING ARCHITECTURE ANDtgOFT -11
SCALE TO MAINTAIN A UNIFIED APPEARANCE, y� S •• to Pledger Kalkomey, Curry Plumbing
P
' Inca College Station, Texas
6. AN IRRIGATION PLAN WILL BE APPROVED PRIOR TO C.O. IT WILL INCLUDE A PRESSURE VACUUM BREAKER, RPZ, OR g
DOUBLE CHECK BACKFLOW PREVENTER INSTALLED AND TESTED PER CITY ORDINANCE 2394. / """""""""""/ Consulting Engineers
/ STEVE E DUNCAN I
Aa32s2
-
7. TOPOGRAPHICAL SURVEY WAS PERFORMED IN AUGUST 2006. / o'• % Glty Site 4 Utility Plan
11.13
' THIS SEAL WAS 7020 Coyote Run, • Bryan, Texas 77808
8. BOUNDARY FROM PLAT DATED 9-4-2005 BY KERR SURVEYING, tt'i SSC •• G\�t AUTHORIZED BY 979-731-8000 979-731-1500 (Fax)
STEVE E DUNCAN, www.pkengineering.com
9. ALL WORK SHALL COMPLY WITH CITY OF COLLEGE STATION AND THE BCS UNIFIED DESIGN STANDARDS AND DETAILS. 3sJP.E. /33252 Dcngn: cAn: IonNo:ION 02/11/2007 Brenham •Bryan • Rosen'berg � TOW 43306-291 GI oP 3
�a
d,ft nil
i%1'n�.� a,a�