Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 2 Project: LEGACY RETAIL ADDITION (SP) - 08-00500234 PLANNING/LANDSCAPING 1. According to the improvements and the method of calculating the minimum number of landscaping points, this project would only be required a minimum of 800 points. Please edit the calculations accordingly. 2. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Crissy Hartl Date: January 20, 2009 ENGINEERING COMMENTS NO. 2 1. Please label easements as "Public Utility Easements." 2. Please clearly label all proposed erosion control measures. Are you proposing silt fencing? 3. Please show applicable City Standard Details for Storm Water Pollution Prevention, etc. The details can be downloaded at www.bcsunited.net. 4. Please show and label the existing sand trap. A note should also be added to the site plan specifying that the sand trap and associated utilities be removed and disposed of in accordance with TCEQ Ch. 330 & 334 requirements. 5. Please remove the Plumbing Facilities and Fixture Load tables from the site plan since they are not pertinent to the water and sewer demand schedule. Reviewed by: Erika Bridges Date: 1/13/09 STAFF REVIEW COMMENTS NO. 1 Project: LEGACY RETAIL ADDITION (SP) — 08-00500234 PLANNING 1. Please provide the area of the existing building. 2. Please add a note to the site plan stating whether or not the subject property is located within a 100-year floodplain or floodway and include the applicable FEMA/FIRM map number. 3. Provide the existing ROW for Holleman Drive West and FM 2818. 4. There are several measurements provided at the northern driveway. Please label the measurement of 47'-4" as the throat length. 5. Per Section 7.9.6.5 of the UDO, a bicycle facility capable of holding 4 bicycles is required for all new non-residential buildings. Please provide such a facility for this building. 6. Please dimension the proposed parking spaces. 7. The end island adjacent to parking space #8 must be 180 square feet in area. Please make adjustments to this end island so that it meets this standard. 8. Please dimension all new parking islands. 9. What do the two blocks at the rear of the building represent? 10. Add the "Fire Lane" label to the line type in the legend. 11. Please add a note to the site plan that states, "For the purposes of signage and Non- Residential Architectural Standards, Lot 1, Block 2 of the Legacy Addition No. 1 shall be considered one building plot." 12. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Crissy Hartl Date: December 4, 2008 LANDSCAPING/STREETSCAPING/BUFFER 1. According to Section 7.5.D Streetscaping, an additional 300 landscaping points are required for every 50 linear feet of frontage along a ROW. Based on this requirement, an additional 300 points would be required in addition to the 70 required site landscaping points. Please add this to the calculations. This does not change the minimum 800 points required. 2. Provide the caliper of live oaks and crepe myrtles and gallon size of the waxleaf ligustrum shrubs according to the standards in the UDO in the landscaping legend. 3. Acording to Section 7.5.D Streetscaping, streetscaping trees are required for this project. If it is your intention to satisfy this requirement by preserving the live oak adjacent to the project area, then please indicate that in the point calculations. 4. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Reviewed by: Crissy Hartl Date: December 4, 2008 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. Please submit a Development Permit Application and Fee. 2. Please submit a revised Drainage Report as the proposed amount of impervious cover does not appear to be reflected in the Legacy Addition No. 1 report. 3. Please submit a Letter of Acknowledgement of City standards. 4. Please submit a grading and erosion control plan. 5. Please show and label all existing and proposed easements. Our records indicate that there are existing PUEs on the property. 6. Please add minimum, average, and maximum water and sanitary sewer demands on the site plan. 7. All water meters must be within a PUE. Please revise. 8. Please label all water meters. 9. Please show and legibly label all existing and proposed water service lines with size and material. 10. Please show and legibly label all existing and proposed sanitary sewer service lines with size, material, and slope. 11. FYI ... Storm water management requirements are listed below. In addition to the following standard comments, if more than 5 acres will be disturbed during construction of this project a NOI must be filed with the state and a copy provided to the CoCS. Any questions may be directed to Donnie Willis, CoCS Drainage Inspector, at 979-764-6375: Storm Water Discharges from Small Construction Activities The Texas Commission on Environmental Quality has issued a general permit for construction activities under the Texas Pollution Discharge Elimination System. The general permit (TXR150000) is for construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development disturbing at least 1 but less than 5 acres. You will need to follow these steps to discharge storm water from your construction site to the City of College Station's Municipal Separate Storm Water Sewer System (MS4): 1. Read the general permit (TXR150000) to make sure it applies to your situation. 2. Adhere to the requirements of the general permit (TXR150000). 3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part Ill of the general permit (TXR150000). 4. Sign and post a construction site notice. 5. At least 2 days before beginning construction, provide a copy of the site notice to the operator of any Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged. A MS4s include streets, channels, gutters, ditches or anything else that is publicly owned, designed or used to collect or transport storm water. As long as you meet the conditions of this general permit, you are authorized to discharge storm water. No notice of intent (NOI), notice of termination (NOT), or fee is required under this option—as long as the requirements of this general permit are followed. This particular general permit will expire at midnight on March 5, 2008. A copy of General Permit TXR150000 can be obtained from TCEQ at: http/www.tceq.state.tx.us/assets/public/permitti ng/waterq uality/attachments/stormwater/txr150000. pdf A copy of the construction site notice can be obtained from TCEQ at: http/www.tceq.state.tx.us/assets/public/permitting/waterquality/attachments/stormwater/txr152d2.p df Reviewed by: Erika Bridges Date: 11/17/08 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia / Rodney Harris Date: November 12, 2008