TO: Ewing Irrigation Products, Inc. via US mail
FROM: Molly Hitchcock, AICP (!, 11 51 oq
Planning Administrator 'J
SUBJECT: EWING IRRIGATION (FP) - Final Plat
I reviewed the above-mentioned final plat application and determined it to be incomplete.
Please submit the following information to be scheduled for a future Planning & Zoning
Commission meeting:
A complete Preliminary Plat application.
A complete Final Plat application identifying all property owners. 01 Corporation
must be listed as a property owner and sign the application. If 01 no longer owns the
property, please provide proof of the transfer of ownership. Also, please list Lots 1 and
2, Block 1 as the "Specified Location of Proposed Subdivision".
Since Ewing Irrigation Products, Inc. and 01 Corporation are both businesses,
proof of authority for Mr. York and the 01 Corporation representative to sign on behalf of
their businesses will be needed.
If you have any questions or need additional information, please call me at 979.764.3570.
cc: McClure & Browne Engineering/Surveying, Inc. via fax 979.693.2554
Case file #08-00500220
09°
McCLURE & BROWNE ENGINEERING/SURVEYING, INC. ‘)— •D$
1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845 1v
(979)693-3838•Fax:(979)693-2554 \V
December 3, 2008
Mr. Matt Robinson
Staff Planner
City of College Station
P.O. Box 9960
College Station, TX 77842
Re.: Ewing Irrigation (FP) —Final Plat
Staff Review Response
MBESI#: 1000-0136
Dear Matt:
Below is the summary of the staff review comments dated November 24, 2008.
PLANNING COMMENTS: (reviewed by Matt Robinson November 24, 2008)
COMMENT#1: The metes and bounds state 0.0155 acre Graham Road ROW dedication
which does not match the preliminary plat, which states 0.0303 acres.
ACTION: The 0.0155 acre tract is a dedication out of the 2.24 acre tract, the 0.0303
acres is an additional ROW dedication for this plat.
COMMENT#2: Please clarify the acreage as ROW is being dedicated. In addition the acreage
listed does not add up to the acreage listed in the metes and bounds (2.228 vs.
2.24).
ACTION: This plat consists of two tracts a 2.24 acre tract and the remainder of a
called 50 acre tract and out of these two tracts were additional ROW
dedications. The combination of all parcels is 2.258 acres.
COMMENT#3: Please remove addition (Ewing Irrigation Subdivision addition) from the
Certificate of Ownership and Dedication.
ACTION: See revised plat.
COMMENT#4: Please note that any changes made to the plans that have not been requested
by the City of College Station must be explained in your next transmittal letter
and "bubbled" on your plans. Any additional changes on these plans that the
City has not been made aware of will constitute a completely new review.
ACTION: Duly noted.
Ewing Irrigation Final Plat Page 1 of 4
City Comment Response Letter
& a McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845
(979)693-3838•Fax:(979)693-2554
I
COMMENT#5: The construction documents and reports are still under review and may affect
the plat.
ACTION: Duly noted.
ENGINEERING COMMENTS: (reviewed by Erika Bridges November 24, 2008)
COMMENT#1: Please clarify the 0.0303 Acre right-of-way dedication. Since Graham Rd. is
• classified as a major collector and is currently 70-ft wide, a 5-ft dedication
across the property is required unless otherwise negotiated.
ACTION: The 0.0303 ROW dedication is in addition to previous dedications (see Volume
8477, Page 138 & Volume 4097 Page 184). The ROW line on this plat matches
the ROW line on the plats to the northeast and the southwest.
4, RENT#2: Please provide volume and page number on all existing easements.
ACTION: See revised plat.
44ellrylENT#3: Our records indicate that the 10-ft PUE shown adjacent to the property is
actually a 10-ft. Pipeline easement. Please verify.
ACTION: See revised plat.
CiltOrENT#4: Please show that a lot corner is tied to City's horizontal control monument.
�F�ACTION: See revised plat.
11OIMENT#5: Please show the iron rod at the southwest corner of lot 2.
ACTION: See revised plat.
joiiverNIT#6: Please include the subdivision name, lot ownership information, and
recordation information on all adjacent lots.
ACTION: See revised plat.
tioetrMENT#7: Our records indicate that the correct recordation information for the Brown
Addition is Volume 2370, Page 61. Please verify.
ACTION: See revised plat.
urserMENT#8: Please label and show the limits of the current right-of-way width on Graham
Rd. in front of the property.
F�ACTION: See revised plat.
r2'6MMENT#9: Please clearly indicate the limits of 50-ft. lot perimeter line adjacent to Graham
Rd.
ACTION: See revised plat.
Ewing Irrigation Final Plat Page 2 of 4
City Comment Response Letter
McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
F 1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845
(979)693-3838•Fax:(979)693=554
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION:
COMMENT#1: All easements on site are existing. Electric facilities will be designed within
existing easements.
ACTION: Duly noted.
COMMENT#2: Developer may be responsible for locating easements on site to insure that
electrical infrastructure is installed within easement boundaries.
ACTION: Duly noted.
COMMENT#3: If applicable, the following easements will be required:
➢ A 20' PUE overlay to the existing 20' Bryan Electrical Easement.
ACTION: See revised plat.
GENERAL ELECTRICAL COMMENTS: (reviewed by Sam Weido November 19, 2008)
COMMENT#1: Developer installs conduit per CSU specs and design.
ACTION: Duly noted.
COMMENT#2: CSU will provide drawings for electrical installation.
ACTION: Duly noted.
COMMENT#3: Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
ACTION: Duly noted.
COMMENT#4: Developer provides digital AutoCAD 2000 or later version of plat and/or site
plan. Email to: sweido a[�cstx.gov.
ACTION: Duly noted.
COMMENT#5: Developer provides load data to CSU as soon as it is available to avoid
construction delays. Delivery time for transformers not in stock is approximately
40 weeks.
ACTION: Duly noted.
COMMENT#6: Final site plan must show all proposed electrical facilities necessary to provide
electrical service, i.e. transformer(s), meter location and conduit routing as
designed by CSU.
ACTION: Duly noted.
Ewing Irrigation Final Plat Page 3 of 4
City Comment Response Letter
u McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
r
1008 Woodcreek Drive,Suite 103•College Station,Texas 77845
(979)693-3838•Fax:(979)693-2554
COMMENT#7: To discuss any of the above electrical comments, please contact Sam Weido at
979.764.6314.
ACTION: Duly noted.
If you have any questions or additional comments, please do not hesitate to let me know.
Sincere ,
Kevin R. McClure, R.P.L.S.
Vice-President-Surveying
Ewing Irrigation Final Plat Page 4 of 4
City Comment Response Letter
1 Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
C'IY or COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 24, 2008
TO: Douglas York, via fax 602.437.9639 ki
FROM: Matt Robinson, Staff Planner
SUBJECT: EWING IRRIGATION (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Wednesday, December 3rd, 10:00 a.m.,
your project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, December 18th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas
Avenue.
One (1) 24"x36" copy of the revised final plat;
Nineteen (19) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat (required after P&Z approval); and
One (1) copy of the digital file of the final plat on diskette or e-mail to:
P&DS Digital Submittal a cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
Please note that a Mylar original of the revised final plat will be required after P&Z approval and
prior to the filing of the plat. If you have any questions or need additional information, please call
me at 979.764.3570.
Attachments: Staff review comments
cc: Jeff Robertson, McClure & Brown Engineering/Surveying Inc., via fax 693.2554 Ni
Case file #08-00500220
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 1 of 3