HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: SPRING CREEK COMMONS LOT 13 BLK 1 (FP) - 08-00500215 PLANNING 1. Please provide proof of authority for John Buckley to sign on behalf of St. Joseph Regional Health System. 2. Remove the setback lines from the plat. 3. Remove the zoning labels from the plat. 4. Complete the Certificate of the County Clerk as provided in the Subdivision Regulations with the "WITNESS my hand and official Seal, at my office in Bryan, Texas" phrase. 5. Except for Lot 6, Block 1, the surrounding area is not platted. Please revise the labels of the adjacent property, providing the current legal description. 6. The final plat will not be able to be scheduled for a Planning & Zoning Commission meeting for its consideration until all the conditions of approval for the preliminary plat that were imposed by the Commission have been met. For the preliminary plat to be approved, a revised full-size copy and mylar will need to be submitted and verified by Staff that the conditions have been satisfied. Also, the final plat will need to conform with the approved preliminary plat. 7. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 8. The construction documents and reports are still under review and may affect the plat. Reviewed by: Jason Schubert Date: September 25, 2008 ENGINEERING COMMENTS NO. 1 1. Please provide volume and page for all existing easements. 2. Please remove "prop" from all easements being dedicated. 3. The only easements being dedicated with this plat would be those located within the metes and bounds of the lot. Please remove all "prop" offsite easements, unless they have already been dedicated and you can provide volume and page. 4. Please verify that following easement do not encroach this proposed lot. These easements were identified on our mapping system: a. 25-ft PUE (V0758, P592) b. 20-ft PUE (V8312, P35) 5. If applicable, please provide a note explaining the ownership and maintenance responsibilities of the private drainage easements. 6. There appears to be several issues concerning the site plan for this proposed development, related to the platting of this lot. It would be best to meet to discuss these issues. Reviewed by: Josh Norton Date: September 24, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides descriptive easements for electric infrastructure as designed by CSU for electric lines (where applicable, including street lights if necessary). NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 3. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: gmartinez@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: September 17, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia / Rodney Harris Date: September 17, 2008 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3