HomeMy WebLinkAboutCorrespondence 04# Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 CITY OF COLLEGE STATION Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM September 25, 2008 TO: Veronica Morgan, Mitchell & Morgan, LLP, via vmitchellandmorgan.com FROM: Jason Schubert, Staff Planner SUBJECT: SPRING CREEK COMMONS LOT 13 BLK 1 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Wednesday, October 1, 2008, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, Thursday, October 16, 2008, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to mtrevino@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: John Buckley, St. Joseph Health System, via jbuckley(a�st-ioseph.orq Penny Busch, Hammes Company, via pbusch(a�hammesco.com Case file#08-00500215 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of 3 MITCHELL MM MORGAN October 6, 2008 Jason Schubert City of College Station Planning and Development Services P.O. Box 9960 College Station, TX 77842 Re: SPRING CREEK COMMONS LOT 13 BLK 1(FP) - 08-00500215 Dear Jason, Attached please find the following: • One (1) 24"x36" copy of the revised Final Plat, • Nineteen (19) 11"x17" copy of the revised Final Plat, and • One (1) copy of the digital file of the final plat has been e-mailed to mtrevino@cstx.gov. STAFF REVIEW COMMENTS NO. 1 Project: SPRING CREEK COMMONS LOT 13 BLK 1 (FP) - 08-00500215 PLANNING 1. Please provide proof of authority for John Buckley to sign on behalf of St. Joseph Regional Health System. Response: Please see the attached paperwork. 2. Remove the setback lines from the plat. Response: Setback lines have been removed. 3. Remove the zoning labels from the plat. Response: All zoning labels have been removed from the plat. 4. Complete the Certificate of the County Clerk as provided in the Subdivision Regulations with the "WITNESS my hand and official Seal, at my office in Bryan, Texas" phrase. Response: The certificate language has been corrected. 5. Except for Lot 6, Block 1, the surrounding area is not platted. Please revise the labels of the adjacent property, providing the current legal description. Response: These lots have been revised to state they are "future"lots. 6. The final plat will not be able to be scheduled for a Planning & Zoning Commission meeting for its consideration until all the conditions of approval for the preliminary plat that were G , 511 UNIVERSITY DRIVE EAST,SUITE 204 • COLLEGE STATION,TX 77840 • T 979 260 6963 • F 979.260 3564 10,°`-i; CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES STREETS • SITE PLANS • SUBDIVISIONS 1Vp�.\ 90 info@mitchellandmorgan.com • www.mitchellandmorgan.com v f' imposed by the Commission have been met. For the preliminary plat to be approved, a revised full-size copy and mylar will need to be submitted and verified by Staff that the conditions have been satisfied. Also, the final plat will need to conform with the approved preliminary plat. Response: Understood. 7. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Response: It is hard to bubble but we have removed all new easements as discussed with staff. 8. The construction documents and reports are still under review and may affect the plat. Response: There should not be any construction drawings associated with this plat. ENG ERING COMMENTS NO. 1 . Please provide volume and page for all existing easements. Response: The volume and page for these easements have been indicated. todetPlease remove "prop" from all easements being dedicated. Response: We have removed all new easements since they are not required for the plat. All of these easements were required for site development so we will dedicate those easements with the site development documents. ive.The only easements being dedicated with this plat would be those located within the metes and bounds of the lot. Please remove all "prop" offsite easements, unless they have already been dedicated and you can provide volume and page. Response: All of these proposed easements have been removed. lease verify that following easement do not encroach this proposed lot. These easements were identified on our mapping system: a. 25-ft PUE (V0758, P592) b. 20-ft PUE (V8312, P35) Response: The 25-ft PUE (V0758, P592) is shown on our plat but it is actually a 20-ft PUE labeled (V0758, P594). The 20-ft PUE (V8312, P35) is actually incorrectly mapped on your mapping system and should be located on the other side of William D. Fitch. We have attached a copy of the recorded documents from the Brazos County Clerk's Office for your records. applicable, please provide a note explaining the ownership and maintenance If rfe responsibilities of the private drainage easements. Response: These private drainage easements have been removed as requested. . There appears to be several issues concerning the site plan for this proposed development, related to the platting of this lot. It would be best to meet to discuss these issues. Response: Understood. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. Response: Acknowledged. 2. Developer provides descriptive easements for electric infrastructure as installed by CSU for electric lines (where applicable, including street lights if necessary). Response: Acknowledged. 3. Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. Response: Acknowledged. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. Response: Acknowledged. 2. CSU will provide drawings for electrical installation. Response: Acknowledged. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. Response: Acknowledged. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Response: Acknowledged. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. Response: Acknowledged. 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. Response: Acknowledged. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). Response: Acknowledged. 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: gmartinez(a cstx.gov. Response: We have already emailed a composite site plan (full development) to Gilbert for him to work on overall electrical layouts for the total acreage. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. Response: We will try to get Gilbert load data as soon as possible. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. Response: Acknowledged. 11. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Response: Thank you for your help. SANITATION 1. Sanitation is ok with this project. Response: Thank you for your help. ou have any questions or comments, please feel free to call our office at 979-260-6963. cerely, Veronica J.: org Ln,P.E., C.F.M. Managing Partner Cc: File Staff Review Comments for Final Plat of Lot 13, Block 1 Spring Creek Commons (08-215) 1. To conform to the note on the preliminary plat regarding Lakeway Drive, the right-of-way for Lakeway Drive adjacent to Lot 11 and Lot 12 will need to be dedicated and the road designed and constructed or a surety established prior to this plat being filed for record at the Courthouse. Reviewed by: Jason Schubert & Josh Norton Date: October 6, 2008 MITCHELL 511 University Drive East, Suite 204 Letter Of Transmittal College Station,TX 77840 I'/ 'lI (979)260-6963 Dat : Job: (979)260-3564 Fax 10 PO, MORGAN info@mitchellandmorgan.com www.mitchellandmorgan.com Attention: Q� To: MOO aft5aer-1- Re: PQ-1,Pe C COM-CO 1-6[13 10)6 - V We are sending you: Attached ❑ Under separate cover via the following: ❑ Drawings ❑ Plans ❑ Prints ❑ Samples ❑ Specifications ❑ Letter ❑ Order ❑ Other Item Date #of Copies Description ° (9 I TA'v6-Q et - i13 Transmitted as checked below: ❑ For approval ❑ Approved as noted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as submitted ❑ Submit copies for distribution EiAs requested ❑ Returned for corrections ❑ Return corrected copies For review ❑ Other Remarks: se ,.A-c, C c,,.vy3-eg, , C s . . -fUW-U Z-- Lk kS1" ViktA- . lQ` J_ Q, �. _-- Copy to: �/'Cl Signed: ti-giC 4x:50 E-mail Correspondence From: Jason Schubert To: v@mitchellandmorgan.com CC: james@mitchellandmorgan.com; Norton, Josh; Pillow, Kerry Date: 10/28/2008 11:37 AM Subject: Spring Creek Commons Lot 13 Veronica, I reviewed your revised plat for this lot. You have inquired as to whether or not it is ready for a mylar to be printed and submitted. It is except for 2 items: 1)the north arrow on the plat does not appear to point north,and 2)the 15 PUE going from Lot 9 to the creek needs to be 20'in width. Several Line segments will need to change as well. These changes should finalize this plat, which is assuming that all of the Lakeway related items and dedication will be with the Phase 3(the Lot 9) plat. Let me know if you have any questions. Thanks, Jason Jason Schubert,AICP Staff Planner Planning& Development Services City of College Station tel: 979.764.3570 fax: 979.764.3496 www.cstx.gov