Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 2 Project: BREEZY HEIGHTS ADDITION (FP-REPLAT) - 08-00500213 PLANNING 1. Please remove the word "plat" from the survey title. This survey is not a plat. 2. Please label the proposed easement as "proposed". 3. Please show any structure on the property on the "Survey" only, the "Final Plat" is correct in that it shows no structures. In most cases, replats are submitted with a final plat which does not require structures to be shown. In this case, we are requesting to see the house and any other structure on the survey. If this request is unclear, please feel to call or email me. Thank you! Reviewed by: Lauren A. Hovde Date: October 24, 2008 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: BREEZY HEIGHTS ADDITION (FP-REPLAT) - 08-00500213 PLANNING ''V. Please show zoninforration for the subject property. Any existing or proposed_. asements should be shown and dimensioned on the plat, along with the volume and page number of such easements. Please re-title the "Original Plat" to be "Survey" ri 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Lauren A. Hovde, Staff Planner Date: October 6, 2008 ENGINEERING COMMENTS NO. 1 LI! Please show the limits of the Welsh Ave. right-of-way on the "Replat" portion of the drawing. 2--Please show all existing or proposed easements on the property. 3r-It is not necessary to show the limits of the existing pavement. 4,1 It is not necessary to show existing structures, setbacks, or utilities on the "Original Plat" or "Replat." Please include ownership and recordation information on Lot 1 which is being replatted. 6. Why are the "Original Plat" and "Replat" in the same configuration? Reviewed by: Erika Bridges Date: 10/6/08 SANITATION Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: September 30, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION A 5' PUE along the Welsh Avenue side to cover the existing overhead line. Z/A 5' PUE along the Thompson Street side to cover any future need for utiltilites. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2. CSU will provide drawings for electrical installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on CSU electrical layout. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull boxes and secondary pedestals provided by CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: tcrabb@cstx.gov / gmartinez@cstx.gov /sweido@cstx.gov / bread@cstx.gov. 9. Developer provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. 10. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as designed by CSU. 11. To discuss any of the above electrical comments please contact Tim Crabb at 979.764.3439, Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, Brent Read at 979.764.5026. Reviewed by: Weldon Davis Date: October 1, 2008 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 10/&/08 Final Plat Engineering Review Project: n ''l A ►► A d6-4-101,1 >12 EPLa"T' Approved Preliminary Plat (Approval Date: Q` Check to make sure it conforms to the approved plat 0-Check to make sure all changes, modifications, corrections, and conditions imposed by the Commission are addressed Construction plans and documents submitted Scale — make sure it's accurate and the plat is legible V Vicinity Map North Arrow Legend VOwnership information of abutting properties Metes & Bounds closure ❑ Check for location, dimensions, name, & legal descriptions of alll 1EXISTING: o Streets/Alleys--moi Dank v1Qkd 4.0 SAW Pik)°/"Itr /1444 +S o Easements "`� Q�Sf7 �,.'iIC.SU'►'% 4I%5 Oh I�f'? o Right-of-ways SHOW Ilrvr ,iV► PG' ' ftit jReservations Q` Check for location, dimensions, & name of all PROPOSED: Easements OQk Streets/Alleys/Right-of-ways/Lots/Blocks Drainage structures Reservations/Parks/Public Areas o Lot corners shown & tied to the City's horizontal control monuments o Certificates: +e Ownership and Dedication +/ Surveyor and/or Engineer City Engineer Commission County Clerk o Notes: VFEMA Flood Plain NO Brazos County Health Dept. OSSF * Dor - show eciei nrs -46,041,A5) :01124,51 �� UAi Orli,eg o✓1 Pint. � r -� ;,n e sa e etnfi M"\ r\io,( •,1.1ho rto A.4 '7