HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: COCS MEMORIAL CEMETERY MC1 & IN1 (FP-AMEND) - 08-00500200
PLANNING/ENGINEERING
1. Please provide a second set of tax certificates (R304685 and R15373). We need certificates
for each plat.
2. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
Reviewed by: Lindsay Boyer and Josh Norton Date: August 28, 2008
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. All easements on site are existing. Electric facilities will be designed within existing
easements.
2. Developer provides temporary blanket easement for construction purposes or provides
descriptive easements for electric infrastructure as designed by CSU for electric lines (where
applicable, including street lights).
3. Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
4. If applicable, the following easements will be required: There are not any easements
required due to the City of College Station owns the property and under Texas law you can
not have an easement to an entity that is owned by that land owner.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull
boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
tcrabb@cstx.gov/gmartinez@cstx.gov/sweido@cstx.gov /bread@cstx.gov.
9. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
11. To discuss any of the above electrical comments please contact Weldon Davis 764.5027.
Reviewed by: Weldon Davis Date: August 26, 2008
SANITATION
1. This project is ok for sanitation.
Reviewed by: Wally Urrutia Date: August 26, 2008