HomeMy WebLinkAboutStaff CommentsAugust 25, 2006
TO: Stewart Ming, Kling Engineering via fax 979.846.8252
FROM: Lindsay Boyer, Staff Planner
SUBJECT: CRESCENT POINTE PH 2 (FP-REPLAT) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed.
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov; and
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: John Hamilton, Crescent Pointe Holdings via fax 979.846.0783
Jane Kee, IPS Group, via email jane@ipsgroup.us
Case file #06-00500165
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: CRESCENT POINTE PH 3 (FP) - 06-00500165
PLANNING/ ENGINEERING
1. This plat will be approved upon approval of the Preliminary Plat, otherwise no comment.
Reviewed by: Lindsay Boyer/Josh Norton Date: August 25, 2006
NOTE.- Airy charge.+ made to the plans, !hal have not been tagnesled by the City o% College Stalion, mnsl be expamed in your Mast trmr_smiltal leller and bubbled" on
yonrpats. Any additional changes on thesepla s that haF not been poinled onl to the City, will onslilnle a completely nem urges:
2f2
(*414"
C1'11'Or- COLLEGE S rarlori
Planning d, Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 14, 2006
TO: Stewart Kling, Kling Engineering & Surveying
FROM: Lindsay Boyer, Staff Planner
SUBJECT: CRESCENT POINTE PH 3 (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed.
Two (2) 24"06" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov.
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: John Hamilton, Crescent Pointe Holdings
Jane Kee, IPS Group
Case file #06-00500165
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained
in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review. 1
STAFF REVIEW COMMENTS NO. 1
Project: CRESCENT' POINTE PH 3 (FP) - 06-00500165
191KA0101111110[!'J
Provide zoning note.
2. This plat will not be approved by staff until the preliminary has been approved by the Planning
and Zoning Commission.
Reviewed by: Lindsay Boyer/Josh Norton
Date: August 14, 2006
GENERAL ELECTRICAL COMMENTS
1. No covvwnt
2. To discuss aiy of 'tbe above electizcal emmlents, please contact Sam lVeido at 979.764.6314.
Reviewed by: Sava li/eido Date: 8-9-06
Sanitation Comments
1. Sanitation is ok with this project..
Reviewed by: Wally Urrutia
Date: August 10, 2006
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained
in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not
been pointed out to the City, will constitute a completely new review.