July 3, 2007
TO: Harriet Elliot, F&H Contractors, Inc., via fax: 979-822-6826
FROM: Jennifer Prochazka, AICP, Senior Planner
SUBJECT: Verizon - Mechanical / Utility Equipment Screening
Staff reviewed the above-mentioned landscape plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed.
One (1) copy of the revised landscape plan
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
STAFF REVIEW COMMENTS NO. 1
PLANNING
1. Please indicate how the landscape will be irrigated.
2. Plantings may be placed no further than 3 feet apart when used for screening purposes.
3. Screening is required on all sides.
4. When this site further develops, this area will need to be included in the overall site area for
point calculations and the existing plantings will earn landscape points.
Reviewed by: Jennifer Prochazka Date: June 29, 2007
07/16/2007 15:25 9798226826 F?H CONTRACTORS
7/3/2007 11:10 AM GWFAX -> 9798226826
44r""
('IIY OF ('0LLE(;E STATION
Manning e+ L/ramlopwmr & 7wictx
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77B42
Phone 979.764.3570 / Fax 979.764.3496
IflEILORArID111.r
July 3, 2007
TO: Harriet Elliot, F&H Contractors, Inc., via fax: 979-822-6826
FROM: Jennifer Prochazka, AICP, Senior Planner
SUBJECT: Verizon - Mechanical / Utility Equipment Screening
PAGE 03
Page 1 of 2
Staff, reviewed the above-mentioned landscape plan as requested. The following page is a list
of staff review comments detailing items that need to be addressed.
One (1) copy of the revised landscape plan
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
07/16/2067
15:25
9798226826
F&H CONTRACTORS
PAGE 04
7/3/2007 11:10
AM
GWFAX -> 5798226826
page 2 of 2
STAFF REVIEW COMMENTS NO. 1
PLANNING
1. Please indicate how the landscape will be irrigated.
2. Plantings may be placed no further than 3 feet apart when used for screening purposes.
3. Screening is required on all sides,
4, When this site further develops, this area will need to be included in the overall site area for
point calculations and the existing plantings will earn landscape points.
Reviewed by: Jennifer Prochazka Date: June 29, 2007
9/26/ 007 4:21 PM GWFAX -> 9798468252
_1__' -1-k� 0, 14
(*41""
CITY OF COLLEGE STATION
Planning Z� neve&vpntent Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
September 26, 2007
TO: Kling Engineering, via fax 979-846-8252
FROM: Lindsay Boyer, Senior Planner
SUBJECT: CRESCENT POINTE PH. 4 (FP-REPLAT) - Final Plat
Page 1 of 2
10•``U-1
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, October 1st, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, October 4th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat; )
L,,'Z Nineteen (19) 11"x17" copies of the revised final plat; Db
/
✓ One (1) Mylar original of the revised final plat; and t f
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Crescent Pointe Holdings, Emanuel Glockzin, via fax
Case file #07-00500205
Home of Texas A&M University
(*- 00F�
CITY OF COLLEGE STATION
September 10, 2007
Planning & Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
TO: Kling Engineering, via fax 979-846-8252
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: CRESCENT POINTE PH. 4 (FP-REPLAT) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, September 17th, 10:00 a.m.,
your project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, October 4th , 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat;
Nineteen (19) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Crescent Pointe Holdings, Emanuel Glockzin, via fax
Case file #07-00500205
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 1 of 3
STAFF REVIEW COMMENTS NO. 1
Project: CRESCENT POINTE PH. 4 (FP-REPLAT) - 07-00500205
PLANNING
1. Metes and bounds do not close.
2. How is the access easement shown on Common Area E -R being built and maintained? I am
assuming it will be constructed and maintained by the POA. The POA for the entire
subdivision will be responsible for the upkeep of an easement that is primarily for the use of
the Texas A&M property.
3. How are the pedestrian walkways located on Lot 3, Block 3 and Lot 4, Block 2 being
constructed? These connections were required as part of the Master Plan.
4. Why is Lot 4, Block 3 and Lot 4, Block 2 not included in the final plat of phase 4? If they are
not going to be included, the phasing of the preliminary plat should be revised. Otherwise,
include them in the plat of phase 4.
5. Plat title should be a Final Plat being a replat of...
6. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
Reviewed by: Lindsay Boyer, AICP, Senior Planner Date: September 10, 2007
ENGINEERING COMMENTS NO. 1
1. Please define ownership and maintenance responsibilities of the Private Access
Easements.
2. Please define ownership and maintenance responsibilities of the Common Areas and
Private Drainage Facilities.
3. Please provide rear PUE for Lot 2 and 3, Block 3, Phase 4.
4. What is the status of the proposed sanitary sewer extension to serve Lot 2A, Block 2,
Phase 4 and Lot 1 R-1, Block 2, Phase 2.
5. Please verify that the Lot, Block and Phase numbers are labeled on each lot throughout
the plans.
Reviewed by: Josh Norton
Date: September 4, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 2 of 3
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes as per City specs and design (pull boxes provided by the City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
sweido@cstx.gov.
9. Developer provides load data for project.
10. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido
Date: 8-29-07
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City, will constitute a completely new review. 3 of 3
9/10/2007 3:33 PM GWFAX -> 9798468252 Page 1 of 2
n
1 }/
CITY OF COLLrGL STNNON
Planning e ' Development Se 4nu
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 10, 2007
TO: Kling Engineering, via fax 979-846-8252
FROM: Lindsay Boyer, AICP, Senior Planner A �('u
SUBJECT: CRESCENT POINTE PH. 2-5 (PP) - Preliminary Plat /I- (�
Staff reviewed the above-mentioned Preliminary Plat as requested. The fomme
page is a list
of staff review comments detailing items that need to be addressed. If allis have been
addressed and the following information submitted by Monday, Septem 10:00 a.myour project will be placed on the next available Planning and Zoningsion meeting
scheduled for
October 4th, 7:00 p.m. in the City HAII Council Chambers, 1101 Texas Avenue.
ne 1 24" x 36" co of he rePse' d Prelir�inar Plat; annd~
() pY rY
Nineteen (19) 11' x 17" copies of the revised Preliminary Plat.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed, your project will be pulled from the scheduled Planning & Zoning
Commission agenda. Your project may be placed on a future agenda once all the revisions
have been made and the appropriate fees paid. Once your item has been scheduled for the
P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday
the week of the P&Z meeting,
http://www.cstx.gov/home/index.asp?page=2481 .
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Crescent Pointe Holdings, Emanuel Glockzin, via fax
Case file #07-00500206
CITY OF COLLEGE STATION
Planning d- Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 26, 2007
TO: Kling Engineering, via fax 979-846-8252
FROM: Lindsay Boyer, Senior Planner
SUBJECT: CRESCENT POINTE PH. 4 (FP-REPLAT) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, October 1st, 10:00 a.m., your
project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, October 4th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat;
Nineteen (19) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Crescent Pointe Holdings, Emanuel Glockzin, via fax
Case file #07-00500205
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: CRESCENT POINTE PH. 4 (FP-REPLAT) - 07-00500205
PLANNING
1. As per my email on 9/21, the plat still does not close according to mapping. As an FYI,
this plat has been placed on the October 4t" P&Z meeting for your convenience since
there is only one meeting in October. If the revised plat does not close, the item will be
withdrawn from the meeting. If you have any questions about how the metes and bounds
are checked, please contact Sven Griffin sgriffin(a).cstx.gov or 764-3570.
2. Construction of the sidewalk through the pedestrian access in Phase 4 is required with
the plat. Please submit construction documents for a 4 -foot wide sidewalk in compliance
with the B/CS Unified Design Guidelines. Ken Fogle is looking into the connection issue
with Phase 5 to the TAMU property, however since those properties have been removed
from the phase, construction is not required at this time.
3. The question of the access easement being in the common area was asked since it was
my understanding after the PAC that the lot line would be moved so there would not be
joint ownershipi/maintenance issues between the POA and the neighboring property.
Because the easement straddles the property line, it may be required that the Common
Area must be included in the site plan of the neighboring development since
improvements must be site planned.
Reviewed by: Lindsay Boyer Date: September 26, 2007
ENGINEERING COMMENTS NO. 2
1. Please provide note defining ownership and maintenance responsibilities of the
Common Areas and Private Drainage Facilities.
2. Please provide note defining ownership and maintenance responsibilities of the Private
Access Easements, specifically for Block 2, Lot 2A of Phase 4 which encroaches a
Common Area.
Reviewed by: Josh Norton Date: September 26, 2007