HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: HOPE SUBDIVISION (FP) - 08-00500187 PLANNING 1. Please remove the "Preliminary Plat" from this document. 2. The College Station monument must be added to the Final Plat. 3. FYI...please add a note to the plat that there will be a 50' building setback line along any state highway. Reviewed by: Lauren A. Hovde, Staff Planner Date: August 29, 2008 ENGINEERING COMMENTS NO. 1 1. Please show and label the limits of the Raymond Stotzer right-of-way. 2. Please add Brazos County Health Department notes regarding the On-Site Sewage Facility. 3. The proposed Public Utility Easements should be labeled "P.U.E." Please include volume and page number of all existing easements on-site. 4. The Metes & Bounds description should be revised to include the correct ROW width of Raymond Stotzer. 5. An engineer sealed report must be submitted verifying that a fire flow test in accordance with the National Fire Protection Association (NFPA) Standard No. 291, Chapter 4 was conducted. Please include actual fire flow data, the building material type, and the building size. Reviewed by: Carol Cotter Date: 8/28/08 GENERAL ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/02/08. TXDOT 1. If no additional access is required, no comment. 2. Appropriate data, including drainage will be required for any future work/permits in the ROW @ this development site. Reviewed by: Karl Nelson, TxDOT Date: September 5, 2008 SANITATION 1. Sanitation is ok with this project. STAFF REVIEW COMMENTS NO. 1 Project: HOPE SUBDIVISION (FP) - 08-00500187 PLANNING 1. Please remove the "Preliminary Plat" from this document. 2. The College Station monument must be added to the Final Plat. Reviewed by: Lauren A. Hovde, Staff Planner Date: August 29, 2008 ENGINEERING COMMENTS NO. 1 1. Please show and label the limits of the Raymond Stotzer right-of-way. 2. Please add Brazos County Health Department notes regarding the On-Site Sewage Facility. 3. The proposed Public Utility Easements should be labeled "P.U.E." Please include volume and page number of all existing easements on-site. 4. The Metes & Bounds description should be revised to include the correct ROW width of Raymond Stotzer. 5. An engineer sealed report must be submitted verifying that a fire flow test in accordance with the National Fire Protection Association (NFPA) Standard No. 291, Chapter 4 was conducted. Please include actual fire flow data, the building material type, and the building size. Reviewed by: Carol Cotter Date: 8/28/08 GENERAL ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/02/08. STAFF REVIEW COMMENTS NO. 2 Project: HOPE SUBDIVISION (FP) - 08-00500187 PLANNING 1. Please provide the volume and page number of any PUE on the property. Reviewed by: Lauren A. Hovde Date: September 30, 2008 ENGINEERING COMMENTS NO. 2 2. (Repeat Comment) Please submit an engineer sealed fire flow report verifying that a fire flow test in accordance with the National Fire Protection Association (NFPA) Standard No. 291, Chapter 4 was conducted and meets our minimum standards. Please include of a copy of the actual fire flow test data from Brushy/Wellborn SUD. 3. Are there any existing easements on site? 4. Please add the following Brazos County Health Department notes regarding the On-Site Sewage Facility: a) All lots served by an On-Site Sewage Facility (OSSF) must comply with county and state regulations. No OSSF may be installed on any lot without the issuance of an "Authorization To Construct" issued by the Brazos County Health Department under the provisions of the Private Sewage Facility regulations adopted by the Commissioners Court of Brazos County, pursuant to the provisions of Section 21.084 of the Texas Water Code. b) All lots will be required to have a site/soil evaluation on file with the Brazos County Health Department before the OSSF may be constructed. c) No OSSF drain field shall encroach on the 100-foot sanitary zone of private water wells or 150-foot sanitary zone of public water wells. Reviewed by: Erika Bridges Date: 10/1/08 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 3 Project: HOPE SUBDIVISION (FP) - 08-00500187 PLANNING 1. Please revise the title of the plat to state, "Final Plat of Hope Subdivision Lot 1, Block 1". Thank you! Reviewed by: Lauren A. Hovde, Staff Planner Date: November 9, 2008 ENGINEERING COMMENTS NO. 3 1. FYI ... "Existing" is misspelled in Notes #8 and #11. 2. Please remove Note #10 regarding relocating the PUE in the future. 3. For clarity, you may want to change the first portion of Note #13 to say, "No portion of the lot lies within the 100-yr floodplain, as identified by..." Reviewed by: Erika Bridges Date: 11/5/08