HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: HOPE SUBDIVISION (FP) - 08-00500187
PLANNING
1. Please remove the "Preliminary Plat" from this document.
2. The College Station monument must be added to the Final Plat.
3. FYI...please add a note to the plat that there will be a 50' building setback line
along any state highway.
Reviewed by: Lauren A. Hovde, Staff Planner Date: August 29, 2008
ENGINEERING COMMENTS NO. 1
1. Please show and label the limits of the Raymond Stotzer right-of-way.
2. Please add Brazos County Health Department notes regarding the On-Site Sewage
Facility.
3. The proposed Public Utility Easements should be labeled "P.U.E." Please include
volume and page number of all existing easements on-site.
4. The Metes & Bounds description should be revised to include the correct ROW width
of Raymond Stotzer.
5. An engineer sealed report must be submitted verifying that a fire flow test in
accordance with the National Fire Protection Association (NFPA) Standard No. 291,
Chapter 4 was conducted. Please include actual fire flow data, the building material
type, and the building size.
Reviewed by: Carol Cotter Date: 8/28/08
GENERAL ELECTRICAL COMMENTS
1. This plat is outside the College Station Utility electric service area. Customer will
have to get with their electric supplier for this area to determine electric service
specifications and requirements.
Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/02/08.
TXDOT
1. If no additional access is required, no comment.
2. Appropriate data, including drainage will be required for any future work/permits in
the ROW @ this development site.
Reviewed by: Karl Nelson, TxDOT Date: September 5, 2008
SANITATION
1. Sanitation is ok with this project.
STAFF REVIEW COMMENTS NO. 1
Project: HOPE SUBDIVISION (FP) - 08-00500187
PLANNING
1. Please remove the "Preliminary Plat" from this document.
2. The College Station monument must be added to the Final Plat.
Reviewed by: Lauren A. Hovde, Staff Planner Date: August 29, 2008
ENGINEERING COMMENTS NO. 1
1. Please show and label the limits of the Raymond Stotzer right-of-way.
2. Please add Brazos County Health Department notes regarding the On-Site Sewage Facility.
3. The proposed Public Utility Easements should be labeled "P.U.E." Please include volume
and page number of all existing easements on-site.
4. The Metes & Bounds description should be revised to include the correct ROW width of
Raymond Stotzer.
5. An engineer sealed report must be submitted verifying that a fire flow test in accordance
with the National Fire Protection Association (NFPA) Standard No. 291, Chapter 4 was
conducted. Please include actual fire flow data, the building material type, and the building
size.
Reviewed by: Carol Cotter Date: 8/28/08
GENERAL ELECTRICAL COMMENTS
1. This plat is outside the College Station Utility electric service area. Customer will have
to get with their electric supplier for this area to determine electric service specifications
and requirements.
Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 09/02/08.
STAFF REVIEW COMMENTS NO. 2
Project: HOPE SUBDIVISION (FP) - 08-00500187
PLANNING
1. Please provide the volume and page number of any PUE on the property.
Reviewed by: Lauren A. Hovde Date: September 30, 2008
ENGINEERING COMMENTS NO. 2
2. (Repeat Comment) Please submit an engineer sealed fire flow report verifying that a fire
flow test in accordance with the National Fire Protection Association (NFPA) Standard No.
291, Chapter 4 was conducted and meets our minimum standards. Please include of a
copy of the actual fire flow test data from Brushy/Wellborn SUD.
3. Are there any existing easements on site?
4. Please add the following Brazos County Health Department notes regarding the On-Site
Sewage Facility:
a) All lots served by an On-Site Sewage Facility (OSSF) must comply with county
and state regulations. No OSSF may be installed on any lot without the
issuance of an "Authorization To Construct" issued by the Brazos County Health
Department under the provisions of the Private Sewage Facility regulations
adopted by the Commissioners Court of Brazos County, pursuant to the
provisions of Section 21.084 of the Texas Water Code.
b) All lots will be required to have a site/soil evaluation on file with the Brazos
County Health Department before the OSSF may be constructed.
c) No OSSF drain field shall encroach on the 100-foot sanitary zone of private water
wells or 150-foot sanitary zone of public water wells.
Reviewed by: Erika Bridges Date: 10/1/08
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 3
Project: HOPE SUBDIVISION (FP) - 08-00500187
PLANNING
1. Please revise the title of the plat to state, "Final Plat of Hope Subdivision Lot 1, Block 1".
Thank you!
Reviewed by: Lauren A. Hovde, Staff Planner Date: November 9, 2008
ENGINEERING COMMENTS NO. 3
1. FYI ... "Existing" is misspelled in Notes #8 and #11.
2. Please remove Note #10 regarding relocating the PUE in the future.
3. For clarity, you may want to change the first portion of Note #13 to say, "No portion of the lot
lies within the 100-yr floodplain, as identified by..."
Reviewed by: Erika Bridges Date: 11/5/08