Loading...
HomeMy WebLinkAboutStaff Review 0 .w STAFF REVIEW COMMENTS NO. 1 SCHOTZI'S (NG) —Review 08-00500176 PLANNING 1. Please indentify what colors are being used for each material on each facade, including the roof, awning, and canopy. 2. Please identify the material of the roof, awning, and canopy. 3. The square footage, color, and percentage of each material must be provided for the south façade. FYI...It also must have 25% stone, brick, or tile. 4. Staff understands that the stringcourse around all facades will be a different material to distinguish itself from the rest of the masonry portion. If this is the case, all facades meet minimum standards for architectural elements. Please indentify what material is being used for the stringcourse. 5. Please remove graphics 1,2,3,5 from the elevation sheet. 6. Please indentify what type of glass is being used to meet transparency on the north facade. Reviewed by: Lauren A. Hovde, Staff Planner Date: January 21, 2009 STAFF REVIEW COMMENTS NO. 1 SCHOTZI'S (NG) —Review 08-00500176 PLANNING 1. Please submit your materials and paint selection from the approved color palette. 2. Your materials should be provided in a table with the square footage, color, and percentage of each material on each façade. 3. On the revised elevations, please show and label where the two architectural elements per façade will be located. Using two of the same type of elements on one façade will not meet the requirement. The architectural elements must add visual interest to the first and second story of the structure. 4. FYI...lt is my understanding from conversations with the owners and project engineer that the second site plan submittal will have major alterations from the first submittal. The comments for the first submittal are therefore voided. If these comments are desired at a later time I will be happy to provide them. Reviewed by: Lauren A. Hovde, Staff Planner Date: August 11, 2008