Loading...
HomeMy WebLinkAboutROWP12/87/2007 15:06 9798226063 C:J 88Q PAGE 01/01 ' ` Form loss (Rev. 12196) Pnge 2 of 2 Access Driveway Regulations The Texas Transportation Commission, in recognition of its responsibility for the safety and utility of public highways under its jurisdiction, has directed the adoption of rules and regulations to accomplish a coordinated development between highways and abutting property. For this purpose, the booklet entitled `Regulations for Access Driveways to State Highways", was published and adopted, setting out departmental policies to regulate construction and maintenance of access driveway facilities. Sketch of Installation SH 30 - C & J Barbeque - 4304 Harvey Road Drainage Flume - SEE ATTACHED - IMPORTANT December 20, 2007 RE: SH 30 (South ROW) West (340') of FM 158 C & J Barbeque Restaurant 4304 Harvey Road (SH 30) College Station, Texas Access Driveway Permit - Drainage Flume SPECIAL PROVISIONS (Permit — Drainage Flume) 1) Traffic Control plan is required per TMUTCD prior to start of construction work in the SH 30 right-of-way. Lane closure, if required, shall only be between the hours of 8:30 AM and 4:30 PM. 2) Areas within ROW disturbed by construction shall be restored to equal or better conditions than existing prior to construction. 3) Contractor shall be responsible for locating all utilities within the right-of-way construction site. Contacts with local utility companies and utility locators are required. 4) No undercutting of existing asphalt pavement will be allowed. 5) Concrete flume shall be according to Plan Note Details & Specifications. see attached 6) Ditches (upstream & downstream) @ flume shall be graded to drain. 7) Downstream ditch shall be sodded / rock rubble riprap up to adjacent drivewav access structure. 8) Backfill shall be placed in 12" lifts, and compaction density shall be equal to surrounding area. 9) Pavement surface shall be kept clear of mud, debris, etc. Erosion controls shall be installed as required. 10) Contact Mr. Walt Norwood at TxDOT Brazos Maintenance (778-8054) 48 hours prior to starting construction. NOTE: Bethel Baptist Church & C& J BBQ have executed a License Agreement to place a Drainage Swale / Flume adjacent (east) to C& J Property (on Church Property) as indicated in the Plans, etc.