HomeMy WebLinkAboutROWP12/87/2007 15:06 9798226063 C:J 88Q PAGE 01/01
'
`
Form loss
(Rev. 12196)
Pnge 2 of 2
Access Driveway Regulations
The Texas Transportation Commission, in recognition of its responsibility for the safety and utility of public highways under its
jurisdiction, has directed the adoption of rules and regulations to accomplish a coordinated development between highways and
abutting property. For this purpose, the booklet entitled `Regulations for Access Driveways to State Highways", was published
and adopted, setting out departmental policies to regulate construction and maintenance of access driveway facilities.
Sketch of Installation
SH 30
- C & J Barbeque -
4304 Harvey Road
Drainage Flume
- SEE ATTACHED -
IMPORTANT
December 20, 2007
RE: SH 30 (South ROW)
West (340') of FM 158
C & J Barbeque Restaurant
4304 Harvey Road (SH 30)
College Station, Texas
Access Driveway Permit - Drainage Flume
SPECIAL PROVISIONS (Permit — Drainage Flume)
1) Traffic Control plan is required per TMUTCD prior to start of construction work
in the SH 30 right-of-way. Lane closure, if required, shall only be between the
hours of 8:30 AM and 4:30 PM.
2) Areas within ROW disturbed by construction shall be restored to equal or better
conditions than existing prior to construction.
3) Contractor shall be responsible for locating all utilities within the right-of-way
construction site. Contacts with local utility companies and utility locators are
required.
4) No undercutting of existing asphalt pavement will be allowed.
5) Concrete flume shall be according to Plan Note Details & Specifications. see
attached
6) Ditches (upstream & downstream) @ flume shall be graded to drain.
7) Downstream ditch shall be sodded / rock rubble riprap up to adjacent drivewav
access structure.
8) Backfill shall be placed in 12" lifts, and compaction density shall be equal
to surrounding area.
9) Pavement surface shall be kept clear of mud, debris, etc. Erosion controls shall
be installed as required.
10) Contact Mr. Walt Norwood at TxDOT Brazos Maintenance (778-8054) 48 hours prior
to starting construction.
NOTE:
Bethel Baptist Church & C& J BBQ have executed a License
Agreement to place a Drainage Swale / Flume adjacent (east) to C& J
Property (on Church Property) as indicated in the Plans, etc.