HomeMy WebLinkAboutCorrespondence IPI
ENGINEERS&SURVEYING
7400 Blanco, Suite 260
San Antonio, TX 78216
Phone: (210) 979-8444
Fax: (210) 979-8441
ww.kfwengineers.corn
TRA NSMIT � #
To: City of College Station Planning Department From: Craig Fletcher
Attn: Jennifer Prochazka Date: 7/24/2008
Address: 1101 Texas Avenue cc: file
Re: Rezoning Application KFW Job#:
0 For Review&Comment 0 For Your Records 0 Preliminary 0 Please Respond
Comments:
Jennifer,
Attached is a completez re-zoning application, a check for the$500 re-zoning fee,and supporting documents.
Please review my application and let me know if you need anything else.
Thanks for your help,
CITY OF COLLEGE STATION
Planning d'Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 30, 2008 J ,,
TO: Glenn Deadman, via fax 210.472.3901 " uL- Z I tat W44 Mt.*
FROM: Molly Hitchcock, AICP
Planning Administrator
SUBJECT: 108 POPLAR ST., 104 & 106 POPLAR ST.
I reviewed the above-mentioned rezoning application and determined it to be incomplete. The
following is a preliminary list of items needed to complete the submittal so that staff may
conduct a thorough review. The rezoning request will not be scheduled for the Sept. 4 Planning
& Zoning Commission meeting. Please submit the following information by the next available
deadline date to be scheduled for a future Planning & Zoning Commission meeting:
The Power of Attorney statement for the person signing the application on behalf
of the owner, or if the person is the representative of South New Braunfels 47, Ltd., a
statement of authority for the person to sign for the company
Two (2) copies of a rezoning map with calls and easements shown on the map
If you have any questions or need additional information, please call me at 979.764.3570.
cc:
Case file #08-00500169
T _�T
(12/23/2008) Jennifer Prochazka - Fwd: r Updated College Station Office Building I 'out age
From: Wally Urrutia
To: Jennifer Prochazka
Date: 6/20/2008 10:08 AM
Subject: Fwd: RE: Updated College Station Office Building Layout
I would like to know what type of garbage collection service they may be requesting. Our vehicle would not block the street
during collection services.
For that size of building, it seems they can utilize 90 gal.containers that they would roll-out to the curb. If that is their
intention,then this will work.
Thanks,
Wally
Wally Urrutia
Sanitation Superintendent
(979)764-3841
Fax(979)764-3822
>>>Jennifer Prochazka 6/20/2008 8:37 am >>>
Wally,
Please see the attached pdf of a proposed site(they had a PAC a few weeks ago). This is the old Adult Video site. They have
proposed the dumpster access from Poplar. I haven't yet checked to see how the site would function as a whole,but I was curious
of your thoughts on this...
>>> "Steven Krauskopf' <skrauskopf((kfwengineers.com> 6/18/2008 5:37 PM >>>
Jennifer,
Per our conversation, please find the latest site plan with the dumpster moved to the street.
Thank you,
Steven Krauskopf,P.E.
KFW Engineers&Surveying
7400 Blanco Road,Suite 260
San Antonio, Texas 78216
Phone:(210)979-8444 ext. 12
Mobile:(512)784-4029
Fax:(210)979-8441
From:Steven Krauskopf
Sent:Friday,June 13,2008 5:02 PM
To:'Jennifer Prochazka';James Allen
Cc:Craig Fletcher
Subject: RE:Updated College Station Office Building Layout
Jennifer,
Thank you for meeting with James yesterday and reviewing our revised layout with him. I have read the UDO in relation to
driveway location and separation distances and I understand that we will only be allowed one driveway for the properties that
James currently has under contract. Please find the attached revised layout showing a single driveway entrance and then a 20 foot
fire lane going behind the building to the parking lot in the rear. We are not seeking official college station approval for the site plan
but I would like your input and see if there is anything else that raises a flag to you. James will probably still try to do something
different but he needs to know if this will work to make his decision on closing on Mrs.Chen's property.
I hope you have a great weekend.
(12/23/2008) Jennifer Prochazka - Fwd: rUpdated College Station Office Building I •out Page 2
Thank you very much for you assistance.
Steven Krauskopf,P.E.
KFW Engineers&Surveying
7400 Blanco Road.Suite 260
San Antonio, Texas 78216
Phone:(210)979-8444 ext. 12
Mobile:(512)784-4029
Fax:(210)979-8441
From:Steven Krauskopf
Sent:Thursday,June 12,2008 10:33 AM
To:Jennifer Prochazka;James Allen
Cc: Craig Fletcher
Subject: Updated College Station Office Building Layout
Jennifer&James,
I have attached the revised conceptual site plan. All the following dimensions are based on lines traced from the appraisal districts
GIS system and not an actual survey.
The building is 71 feet from the property line. The building envelope is approximately 4,150 SF based on a 25'front setback and
15'rear setback. A two story building would be approximately 8,300 sf or maybe a little larger if the second floor overhangs on the
sides.
The parking is shown with 20'by 9'stalls and a 23'drive isle. Curve radii are drawn at 18'.
Please reply to this email or call me if you have any questions or comments.
Thank you,
Steven Krauskopf,P.E.
KFW Engineers&Surveying
7400 Blanco Road,Suite 260
San Antonio, Texas 78216
Phone:(210)979-8444 ext. 12
Mobile:(512)784-4029
Fax:(210)979-8441