Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: THE BARRACKS PH 1 (FP) - 08-00500164 PLANNING 1. The metes and bounds of the plat do not close. Please revise. 2. The bearing and/or distance to GPS Monument #117 is not correct. Please revise. 3. Remove zoning labels from all properties. 4. Please be aware that on future applications, the Minimum Submittal Requirements are to be accounted for in full without notes stating items were submitted under a different / prior application. Each application is to stand alone and continuing this practice will result in future applications being considered incomplete. 5. As requested, Staff has reviewed which parkland dedication requirements (fees) apply to this project. Though a Comprehensive Plan Amendment application for this property was submitted prior to the January 1, 2008 effective date of the current parkland dedication ordinance, our Legal Department has provided an opinion based on a review of state law and applicable case law that Comprehensive Plan Amendment applications (and Rezonings) do not "vest" a project. Therefore, the fees supplied from the Parks Department, based on the current ordinance, are correct. 6. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jason Schubert Date: July 28, 2008 ENGINEERING COMMENTS NO. 1 1. The final plat will need to go to P&Z after the abandonment's have gone to and been approved by Council. 2. Assuming the abandonment's are approved by Council, the subject easements labeled "to be abandoned" should be removed from the final plat prior to going to P&Z. 3. What is the intent of Common Area No. 1 (2.5' Strip of Land)? 4. The construction documents are still under review, these comments will be sent to you as soon as possible. Reviewed by: Josh Norton Date: August 5, 2008 ELECTRICAL COMMENTS 1. This plat is outside the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: July 22, 2008 FIRE 1. No combustibles will be allowed on site until all-weather roads and fire hydrants have been accepted by the City. 2. A site plan shall not show any part of a structure over one hundred and fifty feet (150') from an approved access road. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 3. If a fire lane extends more than one hundred feet (100'), an approved turn-a-round or"T" will be required. 4. No more than a six percent (6%) grade is allowed on any length of fire lanes. 5. Fire lanes and alley's used for Fire egress will be constructed using the "Fire Apparatus Turning Radius Template" and have a fire lane sign at the entrance. Curbs and road surface to be marked "Fire lane, No Parking, Tow Away Zone" with a minimum of four (4") letters. 6. Approach to approved access easements will be paved to meet road surface Reviewed by: Steve Smith Date: July 28, 2008 SANITATION 1. Need to give details on what type of garbage service will be requested for this location. Reviewed by: Wally Urrutia Date: July 22, 2008 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3