STAFF REVIEW COMMENTS NO. 1
Project: UNIVERSITY SUMMIT PH. 1 (FP) -08-00500163
PLANNING
ir1Please provide documentation that the person signing the plat as the owner's representative
the authority to sign for the business/group.
v271495
. Please change the Certificate cf Ownership and Dedication information to read "University
Pummd Phase One subdivision
lease note that any changes rr ade to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes co these plans that the City has not been made aware of will
stitute a completely new reviEw.
VeThrle construction documents and reports are still under review and may affect the plat.
Reviewed by:
Matt Robinson Date: 7/24/08
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
All easements on site are exisbngttElectric
ed no addit additionalfacilities
easements are ll be rne needed ned at this time.hin existing
^�ements. Based on drawing su
v2 Developer may be responsible for locating easements on site to insure that electrical
infrastructure is installed within easement boundaries.
GEftERAL ELECTRICAL COMMEI'ITS
eloper installs conduit per CSU specs and design.
U will provide drawings for electrical installation.
t. veloper provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
eveloper .will intercept existing conduit at designated transformers or other existing devices
If c extendduit ase noted.
If conduit does not exist at desgnatd transformer or other existing devices, developer will
Wish and install conduit as sh win on CSU electrical layout. ull boxes etc) per CSU
L Developer pours electric device pads or footings (i.e. transformers, p
ecs and design.
u7APedestals per CSU specs and design (pull
Developer installs pull boxes ;Ind secondary p
oxes and secondary pedes provided by CSU).
Developer provides digital AutoAD 2000 or later version of plat and/or site plan. Email to:
Deido@cstx.gov.
eveloper provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
Lle'Fservice,
e,site plan must show all box(es), swittcchgear(s),trical ilities necessary to provide electrical
meter location and conduit routing as
service, i.e.transformer(s), pull
designed by CSU. at
,designed
discuss any of the abovE electrical comments please contact Tim Sam Weido
979.764.6314.
Reviewed by: Sam Weido
Date: 7-22-08
S ATION
ti,f. Sanitation is okay with this projiact.
Reviewed by: Wally Urrutia Date: July 22, 2008
.adid aannas WJOIS
ey}40 eu!peweo ay} o} 3nd al}}o e6pa ay} uaoa4 '14 9'9 s! away}}el}AlpeA aseald - tiL TaaLIS •£Z
.pes!AeJ eq o} peau
9569+8L •eTS PUB 6Z•0 1.+9 a}s ueeNgeq sau!IMOIJ pa}sii ay} }el} saeedde 11 - t71. }aayS •ZZ
.JeMes AJe}!ues pue wio}s ay}ssedwooUe o} peJ!nbeJ
s! 3f1d 14-O£ Wnw!u!W a `au!I J9MOS AJe}IUes ay} }o l}dap ay} o} aria - Teld '8 '71, `£L }aayS •LZ
3fld T4-0Z e u! eq
o} peJ!nbeJ s! pue aadaap ao deep }} g s! au!' J3M2s AJe3!ues pasodoad all-Teld '8 £L }aayS 'OZ
.9£.99+17 'els }e ed!d et_}}o au!'aa}ueo ay} puoAeq
}}-9.9 }seal }e anui}uoo }e osis }snug 3nd pasodoad all '3nd l-0£ a u! eq o} peJ!nbeJ aae
pue aadaap JO deep •}} },L aae au!' ie es AJe3!ues pasodoad all 10 suo!}aod -Teld '8 Z L }aayS 6 L
.sue'd ay}
uo ep!M }aa} O£ se umols ;au s! 3nd pue AemmeM ueu}seped ep!M 4-O£ all - Z L TealS .8 L
.o}u! 601 6u!sodoad aae noA aloluew ay}
}e au!I JoMes AJe}!ues bu!}s!xa eq}jo ado's pue `ez!s `au!IMoI} ay} epnIou! aseald - Z L }aayS L L
.mean Ja}eM u!-9 L 6u!}s!xa
ay} o} u!-a!} pasodoad ay} }o uol}eool ay} Te amen AI}Ja}}nq u!-8L ue ppe aseald - 6 }aayS '9L
.suo!}eo!}!oads pue Slle}ap paepue3s Apo Jed
sedid JeMes WJO1S u!-9j all Jo} paa!nbaa s! 6u!ppaq puss pez!llige}s 3,Uewen - g }aayS .96
"asinai aseald
•TS }!WWnS l611H uo salo1Uew uoeM}aq }} 00£ uey} eiow s! away} Tey} saeadde }I - L }aayS •jL
.eS!AeJ
aseald 'g Teals uo 9L £6Z pUe 9 }eels uo OL £6Z se pelage' s! au!1nnol4 all- 9 }aayS '£L
.enua A}!sJan!un pue •}s 41WWns
146iH }e }janlno pasodoad al} Jo} suo!}elnoleo bulzls ep!noad aseald - soon uo!}o}a5s ue d Z L
uo!}ona}suoo al} u! s1!eTap paepue}s 1paxl pue A}!a apnpu! aseald -. sooa uo!Tona}suoa •L L
.podaa a6euleap all 01 lueweldldns a se sau!lap!nE
u6!saa io4BMwJo}s pa}!un s38 al} }o a x!pueddy pwgns aseald - 9300 uo!}onJTsuoa '0L
.suo!s!neJ paa!nbei al}
}o }Insaa a se sa6uelo Ieua}ew }oaileJ o} a}ew!}se }soo as!naa aseald -- 9300 uo!}onJTsuoa .6
-aa}}!p sl!elep pep!noad al}Mol u!eldxa aseald `sl!e}ap paepue1s /(T!a bu!sn }ou }I
•Vld T!wwns A}lsJeNun Jo}}uawebpaIMOU)1oe }o Ja Tal a }!wgns aseald - sooa uo!}ona}suoa .9
}s }!wwnS l6iH PUB "3 .aa A}!saan!un
amp s)IIemap!s an Jo} s6u!nneap uo!}onJTSUoo Tiwgns aseald .suo!}elnbe uo!s!n!pgns
O}!° al} }o `s)ilemap!s `1Nrg uo!}oaS qpm aoue!Idwoo u! paa!nbeJ a.ae smemap!s - }eld •L
aoe} al} uo ABM-}0-}4!a antra A}!saan!un }o Sl1Wil al}MOTS aseald - }eld 9
.8# a}oN uaoa} „Aeon-10-1l6u„ anouaaa aseald -}eld 9
1enoadde ue'd Ieu!} o}aoud
pa}T!uagns eq }snw }uewesee oes-ap-Ino AJeaodwa4 an Jo} }uewna}su! e3eaedes 0141 - leld b
dde
ueId o} aoud pe33,iWgns eq }snw Tuewasee 0141 ./(aepunoq }eId 011. 10 l}nos 6u!pua}xe
ein}ona}sea}u! Ja3eM al} Jo} }uewna}su! eieaedes Aq 3nd }}-9 L e a}eo!pep aseald - Teld .£
.Ienoadde ueId o}aoud }s }!wwns l6!H }o saps UJO}SBM pue uaa}sea al} 6uoIe
s3fld 14-0L al} Jo; pewwgns eq o} peau suo!}eolpap Tuawasee }uawna}su! a}eaedas - Teld .Z
.pa}ou
A}!I!q!suodseJ aoueua}u!ew pue „eaJv u0wwoo„ a se pelage' eq p1nols puod uo!}uelep
all .L 1ld i!wwns A}!saan!un l}!nn 6uoIe pal}eld eq o} speeu puod uo!}ua}ap all - }eld •L
I• 'ON SIN3WWO3 ONR133NION3
24. Sheet 16 — Sealed plans for the proposed retaining wall are required. FYI ... A building
permit for the retaining wall is also required.
25. Drainage Report— Please submit hydraulic gradeline calculations for the 100-yr storm.
26. Drainage Report — Please provide a drainage report for University Summit Ph. 1 showing
that post-development flows for that portion of the overall development are lower than pre-
development flows.
27. Drainage Report — Table #4, Pg. 10 shows a runoff value of 12.33cfs for Area P2 and the
data in Section 3.0 indicates that value should be 12.23cfs. Please rectify.
28. Drainage Report — It does not appear that the Runoff Values and Required Lengths listed in
Table #7 match the values in Section 5.0. Please clarify.
29. Drainage Report — The "n" value of 0.012 listed under the Curb Inlet Notes does not match
the "n" value of 0.014 listed in Section 5.0. Please revise.
30. Drainage Report — On Pg. 17 a roughness coefficient for ADS pipe should be listed under
system criteria. Please revise calculations in Section 5.0 to utilize the correct coefficient.
31. Water & Sanitary Sewer Report — Please indicate how many units per acre were assumed
for high-density and medium-density residential sanitary sewer flow calculations.
32. Water & Sanitary Sewer Report — Please provide a water and sanitary sewer report for
University Summit Ph. 1.
Reviewed by: Erika Bridges/ Carol Cotter Date: 8/6/08