Loading...
HomeMy WebLinkAboutStaff Review 07/28/2008 2:38:13 PM -0500 FAXCJM PAUL 3 Ur a STAFF REVIEW COMMENTS NO. 1 Project: UNIVERSITY SUMMIT PH. 1 (FP) -08-00500163 PLANNING ir1Please provide documentation that the person signing the plat as the owner's representative the authority to sign for the business/group. v271495 . Please change the Certificate cf Ownership and Dedication information to read "University Pummd Phase One subdivision lease note that any changes rr ade to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes co these plans that the City has not been made aware of will stitute a completely new reviEw. VeThrle construction documents and reports are still under review and may affect the plat. Reviewed by: Matt Robinson Date: 7/24/08 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION All easements on site are exisbngttElectric ed no addit additionalfacilities easements are ll be rne needed ned at this time.hin existing ^�ements. Based on drawing su v2 Developer may be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries. GEftERAL ELECTRICAL COMMEI'ITS eloper installs conduit per CSU specs and design. U will provide drawings for electrical installation. t. veloper provides 30' of rigid or IMC conduit for riser poles. CSU installs riser. eveloper .will intercept existing conduit at designated transformers or other existing devices If c extendduit ase noted. If conduit does not exist at desgnatd transformer or other existing devices, developer will Wish and install conduit as sh win on CSU electrical layout. ull boxes etc) per CSU L Developer pours electric device pads or footings (i.e. transformers, p ecs and design. u7APedestals per CSU specs and design (pull Developer installs pull boxes ;Ind secondary p oxes and secondary pedes provided by CSU). Developer provides digital AutoAD 2000 or later version of plat and/or site plan. Email to: Deido@cstx.gov. eveloper provides load data to CSU as soon as it is available to avoid construction delays. Delivery time for transformers not in stock is approximately 40 weeks. Lle'Fservice, e,site plan must show all box(es), swittcchgear(s),trical ilities necessary to provide electrical meter location and conduit routing as service, i.e.transformer(s), pull designed by CSU. at ,designed discuss any of the abovE electrical comments please contact Tim Sam Weido 979.764.6314. Reviewed by: Sam Weido Date: 7-22-08 S ATION ti,f. Sanitation is okay with this projiact. Reviewed by: Wally Urrutia Date: July 22, 2008 .adid aannas WJOIS ey}40 eu!peweo ay} o} 3nd al}}o e6pa ay} uaoa4 '14 9'9 s! away}}el}AlpeA aseald - tiL TaaLIS •£Z .pes!AeJ eq o} peau 9569+8L •eTS PUB 6Z•0 1.+9 a}s ueeNgeq sau!IMOIJ pa}sii ay} }el} saeedde 11 - t71. }aayS •ZZ .JeMes AJe}!ues pue wio}s ay}ssedwooUe o} peJ!nbeJ s! 3f1d 14-O£ Wnw!u!W a `au!I J9MOS AJe}IUes ay} }o l}dap ay} o} aria - Teld '8 '71, `£L }aayS •LZ 3fld T4-0Z e u! eq o} peJ!nbeJ s! pue aadaap ao deep }} g s! au!' J3M2s AJe3!ues pasodoad all-Teld '8 £L }aayS 'OZ .9£.99+17 'els }e ed!d et_}}o au!'aa}ueo ay} puoAeq }}-9.9 }seal }e anui}uoo }e osis }snug 3nd pasodoad all '3nd l-0£ a u! eq o} peJ!nbeJ aae pue aadaap JO deep •}} },L aae au!' ie es AJe3!ues pasodoad all 10 suo!}aod -Teld '8 Z L }aayS 6 L .sue'd ay} uo ep!M }aa} O£ se umols ;au s! 3nd pue AemmeM ueu}seped ep!M 4-O£ all - Z L TealS .8 L .o}u! 601 6u!sodoad aae noA aloluew ay} }e au!I JoMes AJe}!ues bu!}s!xa eq}jo ado's pue `ez!s `au!IMoI} ay} epnIou! aseald - Z L }aayS L L .mean Ja}eM u!-9 L 6u!}s!xa ay} o} u!-a!} pasodoad ay} }o uol}eool ay} Te amen AI}Ja}}nq u!-8L ue ppe aseald - 6 }aayS '9L .suo!}eo!}!oads pue Slle}ap paepue3s Apo Jed sedid JeMes WJO1S u!-9j all Jo} paa!nbaa s! 6u!ppaq puss pez!llige}s 3,Uewen - g }aayS .96 "asinai aseald •TS }!WWnS l611H uo salo1Uew uoeM}aq }} 00£ uey} eiow s! away} Tey} saeadde }I - L }aayS •jL .eS!AeJ aseald 'g Teals uo 9L £6Z pUe 9 }eels uo OL £6Z se pelage' s! au!1nnol4 all- 9 }aayS '£L .enua A}!sJan!un pue •}s 41WWns 146iH }e }janlno pasodoad al} Jo} suo!}elnoleo bulzls ep!noad aseald - soon uo!}o}a5s ue d Z L uo!}ona}suoo al} u! s1!eTap paepue}s 1paxl pue A}!a apnpu! aseald -. sooa uo!Tona}suoa •L L .podaa a6euleap all 01 lueweldldns a se sau!lap!nE u6!saa io4BMwJo}s pa}!un s38 al} }o a x!pueddy pwgns aseald - 9300 uo!}onJTsuoa '0L .suo!s!neJ paa!nbei al} }o }Insaa a se sa6uelo Ieua}ew }oaileJ o} a}ew!}se }soo as!naa aseald -- 9300 uo!}onJTsuoa .6 -aa}}!p sl!elep pep!noad al}Mol u!eldxa aseald `sl!e}ap paepue1s /(T!a bu!sn }ou }I •Vld T!wwns A}lsJeNun Jo}}uawebpaIMOU)1oe }o Ja Tal a }!wgns aseald - sooa uo!}ona}suoa .9 }s }!wwnS l6iH PUB "3 .aa A}!saan!un amp s)IIemap!s an Jo} s6u!nneap uo!}onJTSUoo Tiwgns aseald .suo!}elnbe uo!s!n!pgns O}!° al} }o `s)ilemap!s `1Nrg uo!}oaS qpm aoue!Idwoo u! paa!nbeJ a.ae smemap!s - }eld •L aoe} al} uo ABM-}0-}4!a antra A}!saan!un }o Sl1Wil al}MOTS aseald - }eld 9 .8# a}oN uaoa} „Aeon-10-1l6u„ anouaaa aseald -}eld 9 1enoadde ue'd Ieu!} o}aoud pa}T!uagns eq }snw }uewesee oes-ap-Ino AJeaodwa4 an Jo} }uewna}su! e3eaedes 0141 - leld b dde ueId o} aoud pe33,iWgns eq }snw Tuewasee 0141 ./(aepunoq }eId 011. 10 l}nos 6u!pua}xe ein}ona}sea}u! Ja3eM al} Jo} }uewna}su! eieaedes Aq 3nd }}-9 L e a}eo!pep aseald - Teld .£ .Ienoadde ueId o}aoud }s }!wwns l6!H }o saps UJO}SBM pue uaa}sea al} 6uoIe s3fld 14-0L al} Jo; pewwgns eq o} peau suo!}eolpap Tuawasee }uawna}su! a}eaedas - Teld .Z .pa}ou A}!I!q!suodseJ aoueua}u!ew pue „eaJv u0wwoo„ a se pelage' eq p1nols puod uo!}uelep all .L 1ld i!wwns A}!saan!un l}!nn 6uoIe pal}eld eq o} speeu puod uo!}ua}ap all - }eld •L I• 'ON SIN3WWO3 ONR133NION3 24. Sheet 16 — Sealed plans for the proposed retaining wall are required. FYI ... A building permit for the retaining wall is also required. 25. Drainage Report— Please submit hydraulic gradeline calculations for the 100-yr storm. 26. Drainage Report — Please provide a drainage report for University Summit Ph. 1 showing that post-development flows for that portion of the overall development are lower than pre- development flows. 27. Drainage Report — Table #4, Pg. 10 shows a runoff value of 12.33cfs for Area P2 and the data in Section 3.0 indicates that value should be 12.23cfs. Please rectify. 28. Drainage Report — It does not appear that the Runoff Values and Required Lengths listed in Table #7 match the values in Section 5.0. Please clarify. 29. Drainage Report — The "n" value of 0.012 listed under the Curb Inlet Notes does not match the "n" value of 0.014 listed in Section 5.0. Please revise. 30. Drainage Report — On Pg. 17 a roughness coefficient for ADS pipe should be listed under system criteria. Please revise calculations in Section 5.0 to utilize the correct coefficient. 31. Water & Sanitary Sewer Report — Please indicate how many units per acre were assumed for high-density and medium-density residential sanitary sewer flow calculations. 32. Water & Sanitary Sewer Report — Please provide a water and sanitary sewer report for University Summit Ph. 1. Reviewed by: Erika Bridges/ Carol Cotter Date: 8/6/08