Loading...
HomeMy WebLinkAboutStaff CommentsDecember 10, 2007 Lindsay Boyer Senior Planner City of College Station 1101 Texas Avenue South College Station, TX 77842 RE: C&J BBQ Site Plan — Initial Submission Package RME No. 188-0334 Lindsay: P.O. Box 9253, College Station, TX 77842 Off/Fax: (979) 690-0329 email: civil@rmengineer.com Please find attached the following items for the above referenced project. ❖ 1 — Complete Site Plan Application with Fee; ❖ 14 — Site Plan (2406); ❖ 2 —Grading Plan (24x36); ❖ 4 — Completed TxDOT Permits; Please do not hesitate to call should you have any questions. Sincerely, a Adam J. rumbaugh, E. adaninr engineer.com CD1-188-0334-L01 Page I of I �1 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 /Fax 979.764.3496 CITY OF COLLECE S TION MEMORANDUM December 17, 2007 TO: Adam Brumbaugh, RME Consulting Engineers, via adam(o),rmengineer.com FROM: Jason Schubert, Staff Planner SUBJECT: C&XS BARBEQUE, 4304 HARVEY RD (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Cover memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Seven (7) complete sets of construction documents for the proposed development with the revised site plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set); Two (2) revised site plans; One (1) 11 x1 7 grading and erosion control plan; Easement Dedication Sheets and required documents as detailed in the comments (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Chip & Jo Manning, owners, via fax 822.6063 Case file #07-00500317 NOTE: Any charnges made to the plans, that have not been requested by the Cir of Coll gc Station, must be explained in your nest transmietal letter and "bubbled" on yout plans. Any additional changes on these plans that have not been pointed out to the Cin', will constitute a completely new review. Page 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: C&J'S BARBEQUE (SP) — 07-00500317 PLANNING 1. Please relabel the 25' building line along Nunn Jones Rd as 15'. 2. The proposed building expansion will require compliance with the Non -Residential Architecture (NRA) Standards found in Unified Development Ordinance (UDO) Section 7.9. The site plan can be approved without approved elevations but those elevations will be required prior to the issuance of building permits. 3. Provide a general note that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Jason Schubert Date: December 17, 2007 ENGINEERING COMMENTS NO. 1 1. For the off-site improvements, please submit an executed private drainage easement, which explains ownership and maintenance responsibilities. 2. The TxDOT permit has been forwarded to the state. Reviewed by: Josh Norton Date: December 12, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. The following easements will be required: 10' PUE along the road frontage of SH 30 and a 10' PUE along the south property line, this being the line in common with the Hall parcel. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: wdavis@cstx.gov. 9. Developer provides load data for project. NOTE: Any changes made to the plans, that have not been requested b'v the City of College Station, must be explained in tour nest transmittal letter and "bubbled" on your plans. Any additional changes on Huse plans that bare not been pointed out to the Cite, will con,titute a completely new review. page 2 of 3 10. To discuss any of the above electrical comments please contact Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: December 13, 2007 Date: December 11, 2007 NOTE: Any changes made to the plans, that have not been rcqucsecd by the CitV of College Station, must be explained in }'our nest transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new rcv°icw. Page 3 of 3 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 City of; Cot.t.r-.ce STnruw Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 17, 2007 TO: Adam Brumbaugh, RME Consulting Engineers, via adamCa)-rmengineer.com FROM: Jason Schubert, Staff Planner SUBJECT: C&J'S BARBEQUE, 4304 HARVEY RD (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: "over memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Seven (7) complete sets of construction documents for the proposed development with the revised site plans attached (one set will be returned to you, lease submit additional copies if you want more than one approved set); vzi Two (2) revised site plans; One (1) 11x17 grading and erosion control plan; Easement Dedication Sheets and required documents as detailed in the comments (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. if there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments PC: Chip & Jo Manning, owners, via fax 822.6063 Case file #07-00500317 C7_317 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your nest transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: C&J'S BARBEQUE (SP) - 07-00500317 PLANNING �!Tease relabel the 25' building line along Nunn Jones Rd as 15'. L...2' The proposed building expansion will require compliance with the Non -Residential Architecture (NRA) Standards found in Unified Development Ordinance (UDO) Section 7.9. The site plan can be approved without approved elevations but those elevations will be r,�quired prior to the issuance of building permits. -- ug > ff ` l - P1 I � 5/6in-K= L_V Provide a general note that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. a S,7E- A/0 -/E:, ? Reviewed by: Jason Schubert Date: December 17, 2007 ENGINEERING COMMENTS NO. 1 For the off-site improvements, please submit an executed private drainage easement, which explains ownership and maintenance responsibilities. — A -i c.r 2 The TxDOT permit has been forwarded to the state. Reviewed by: Josh Norton Date: December 12, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION U-1-1 - Developer provides temporary blanket easement for construction purposes. 2:"J Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. The following easements will be required: 10' PUE along the road frontage of SH 30 and a 10' PUE along the south property line, this being the line in common with the Hall parcel. (9 -/0 7 �GEN�RAL ELECTRICAL COMMENTS Developer installs conduit per City specs and design. .,City will provide drawings for conduit installation. eveloper provides 30' of rigid or IMC conduit for riser poles. City installs riser. eveloper to intercept existing conduit at designated transformers and extend as required. If conduit does not exist at designated transformer, developer to furnish and install conduit res shown on electrical layout. __Developer pours transformer pad(s) per City specs and design. Developer installs pull boxes and secondary pedestals as per City specs and design (pull .,boxes and secondary pedestals provided by the City). Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: �rdavis@cstx.gov. L-9. Developer provides load data for project. o�- 31'7 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your nest transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constituter completely new review. ]'age 2 of 3 f) f' U,110„fTo discuss any of the above electrical comments please contact Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis SANITATION C --,Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: December 13, 2007 Date: December 11, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled” on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 �1 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM March 10, 2008 TO: Adam Brumbaugh, RME Consulting Engineers, via adam(c)-rmengineer.com FROM: Jason Schubert, Staff Planner SUBJECT: C&J'S BARBEQUE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site plan attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) 11x17 grading and erosion control plan Easement Dedication Sheets and required documents as detailed in the comments. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Chip & Jo Manning, owners, via fax 979.774.1373 Case file #07-00500317 STAFF REVIEW COMMENTS NO. 2 Project: C&J'S BARBEQUE (SP) - 07-00500317 PLANNING 1. Staff has not received documentation that the TxDOT permit has been approved. The site plan cannot be approved until after that occurs. 2. Please provide the public utility easements (PUEs) on the site plan as requested in the previous Electrical Comments: "The following easements will be required: 10' PUE along the road frontage of SH 30 and a 10' PUE along the south property line, this being the line in common with the Hall parcel." These easements are required to cover existing utilities on the site. If you have questions regarding them, please contact Weldon Davis at 979.764.5027. Please note that at least a temporary blanket easement would need to be executed before the site plan could be approved. 3. Please provide the screening fence around the proposed walk-in cooler as discussed with the owner. 4. Please note that the site plan must be approved before the building permit can be issued. Please provide 4 copies of the revised building elevations (3 for the building permit, 1 for planning file). Reviewed by: Jason Schubert Date: March 7, 2008 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 crry or• coi xGr S1ni-ION MEMORANDUM March 10, 2008 TO: Adam Brumbaugh, RME Consulting Engineers, via adam@rmengineer.com FROM: Jason Schubert, Staff Planner SUBJECT: C&J'S BARBEQUE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site plan attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) 11x17 grading and erosion control plan X Easement Dedication Sheets and required documents as detailed in the comments. T r--�CofV I(..., R/).. TIPIS rEp If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Chip & Jo Manning, owners, via fax 979.774.1373 Case file #07-00500317 STAFF REVIEW COMMENTS NO. 2 Prnii-&- CASS BARBEQUE (SP) - 07-00500317 PLANNING LA1 Staff has not received documentation that the TxDOT permit has been approved. The site plan cannot be approved until after that occurs. r RD�&L Afo-rIFICADW 2. Please provide the public utility easements (PUEs) on the site plan as requested in the 7 previous Electrical Comments: "The following easements will be required: 10' PUE along the road frontage of SH 30 and a 10' PUE along the south property line, this being the line in common with the Hall parcel." These easements are required to cover existing utilities on the site. If you have questions regarding them, please contact Weldon Davis at 979.764.5027. Please note that at least a temporary blanket easement would need to be executed before the site plan could be approved. Please provide the screening fence around the proposed walk-in cooler as discussed with the owner. Please note that the site plan must be approved before the building permit can be issued. Please provide 4 copies of the revised building elevations (3 for the building permit, 1 for planning file). L t to ®€ e ay M-rtj bFe Reviewed by: Jason Schubert Date: March 7, 2008 P/An ,.- 566 COV OF-crpvvc,t t 1(47rA c t4E