Loading...
HomeMy WebLinkAboutStaff CommentsMEMORANDUM December 4, 2006 TO: Drew Congleton, Gateway Carwash Partners, Ltd. Via fax 936.597.8356 FROM: Jennifer Reeves, Project Manager SUBJECT: GATEWAY EXPRESS CAR WASH ADDITION (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site plan One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Veronica J. B. Morgan, P.E., C.F.M., via fax 979.260.3564 Case file #06-00500259 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P. STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY EXPRESS CAR WASH ADDITION (SP) — 06-00500259 PLANNING 1. Provide a general note that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. The proposed canopy over the existing vacuums is located in the building setback. This will not be permitted. 3. All paved areas are required to be curbed. The storm drain on the west side will need to be curbed. 4. The new addition will need one more architectural element on the west end of the building (See Section 7.9.2 for options). Reviewed by: Jennifer Reeves Date: November 27, 2006 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. GENERAL ELECTRICAL COMMENTS 1. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweidoc ,cstx.gov 2. Developer provides load data for project. 3. To discuss any of the above electrical comments, please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 11-29-06 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P. CITY OF COLLEGE STATION Planning e¢ Development Servicer 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 4, 2006 TO: Drew Congleton, Gateway Carwash Partners, Ltd. Via fax 936.597.8356 FROM: Jennifer Reeves, Project Manager SUBJECT: GATEWAY EXPRESS CAR WASH ADDITION (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site plan One (1) 11 x1 7 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Veronica J. B. Morgan, P.E., C.F.M., via fax 979.260.3564 Case file #06-00500259 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY EXPRESS CAR WASH ADDITION (SP) — 06-00500259 PLANNING 1. Provide a general note that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. The proposed canopy over the existing vacuums is located in the building setback. This will not be permitted. 3. All paved areas are required to be curbed. The storm drain on the west side will need to be curbed. 4. The new addition will need one more architectural element on the west end of the building (See Section 7.9.2 for options). Reviewed by: Jennifer Reeves Date: November 27, 2006 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. GENERAL ELECTRICAL COMMENTS 1. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweido&stx.gov 2. Developer provides load data for project. 3. To discuss any of the above electrical comments, please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 11-29-06 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P