HomeMy WebLinkAboutCorrespondence 1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
August 19, 2008
TO: Robert Brabowski, via fax 693.1367
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: CEDAR LANE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
One (1) set of civil construction documents for the proposed development
Four (4) revised site plans
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Robert Forest, 1230 South College, College Station, TX, 77840
Chad Grauke, via e-mail infotransitiondesignservice.com
Chris Galindo, via e-mail chris(c�gepinc.net
Case file #08-00500159
i- 52- CO50
GV'VlW'.0/103 5 Lat incl
CEDAR LANE
303 COLLEGE MAIN
COLLEGE STATION, TX 77840
979-739-7717
TO: LINDSAY BOYER-PROJECT MANAGER
FROM: BOBBY GRABOWSKI
OWNER-CEDAR LANE
SUBJECT: SITE PLAN COMMENTS
DATE: JULY 30, 2008
STAFF REVIEW COMMENTS No. 1
PROJECT: CEDAR LANE (SP) — 08-00500159
PLANNING
1 . BUILDING PERMIT ISSUES ON BUILDING FACADE-
RESPONSE - (ELEVATIONS A-D), THE DRAWINGS THAT HAVE
FOUR DIFFERENT FACADES WERE INFORMATIONAL DRAWINGS
REPRESENTING IDEAS, WHERE I WAS CONSIDERING CHANGES
TO THE OUTSIDE FACADE OVER AN EXTENDED PERIOD OF TIME:
IN PHASES. ELEVATIONS A-D FROM TODD MCILHANEY, ARE
NOT PART OF OUR SITE PLAN, AND I HAD NO INTENTIONS OF
THOSE BEING PART OF OUR FIRST SITE PLAN. THE ONLY
CHANGE FOR EXISTING ELEVATION IS NOTED IN THE CURRENT
SITE PLAN, DRAWING, ATTACHED (A-1 ). MY APOLOGIES FOR
THE CONFUSION I WAS LETTING EVERYONE KNOW OUR GOALS
ARE IDENTICAL AS MY PLAN FOR THE PROPERTY IS TO
INCORPORATE THE ELEVATION INTO THE CURRENT
NORTHGATE FACADE BUT FUNDS FOR THIS SCOPE OF WORK
WILL LIMIT THESE CHANGES TO BE IMPLEMENTED AND
APPROVED AT A LATER DATE.
• THE STAIRCASE LOCATED ON THE BACK OF CEDAR LANE
PROPERTY (303 COLLEGE MAIN) IS A FUTURISTIC PROJECT
TO BE ADDRESSED AT A LATER TIME AS PART OF THE 301
COLLEGE MAIN PROJECT, (CHASE BANK BUILDING). 301
AND 303 ARE BOTH OWNED BY ROBERT FOREST.
• CEDAR LANE OUTSIDE PAINT COLOR HAS BEEN CHOSEN
FROM COLLEGE STATION OUTSIDE PAINT CHOICES: OAK
Moss 6180, SAMPLE IS MATCHED PERFECTLY TO THE
GREEN FONT ON THIS MEMO.
SITE PLAN ISSUES
1 . EXISTING LOT LINE AND SET BACKS- RESPONSE: NOTED ON
REQUESTED DRAWINGS, ATTACHED. A-1
2. BIKE RACK- RESPONSE: MODEL# 2175 SUPER CYCLOOPS
OR EQUAL, PLACEMENT NOTED ON REQUESTED DRAWINGS,
ATTACHED. A-1
2A. PAVERS- RESPONSE: I BELIEVE STAMPED DECORATIVE
CONCRETE FOR THE SIDEWALK, OFFERS THE MOST
AESTHETICALLY PLEASING CHOICE FOR THIS SITE. I HAVE
COME TO THIS CONCLUSION BASED ON THE SIDEWALK DETAIL
TO THE NORTH OF US, WHERE OUR SIDEWALK WOULD MEET
THE COLLEGE STATION PARKING GARAGE SIDEWALK. THE
CITY OF COLLEGE STATION PARKING GARAGE HAS STAMPED
DECORATIVE CONCRETE. To THE SOUTH OF CEDAR LANE
WHERE OUR SIDEWALK WOULD MEET, NORTHGATE PLAZA
ALSO HAS STAMPED DECORATIVE CONCRETE. USING PAVERS
IN BETWEEN THESE TWO SITES WOULD RESULT IN A NON-
FLOWING CONTINUITY OF THE SIDEWALK. REFERENCING, P.
29 FROM COLLEGE STATIONS' SITE DESIGN STANDARDS;
"ALL SIDEWALKS ON THE SAME BLOCK SHALL USE THE SAME
BRICK PATTERN". USING STAMPED DECORATIVE CONCRETE
WOULD ACCOMPLISH THIS GOAL, AND PROVIDE A UNIFORM
UNINTERRUPTED FLOW OF BRICK DETAIL TO THE SIDEWALK ON
COLLEGE MAIN, SERVICING THESE THREE SITES.
3. STREET TREE DETAIL- RESPONSE; NOTED ON REQUESTED
DRAWINGS, ATTACHED. A-1
4. TREE GRATE DETAIL- RESPONSE: PARKWAY COLLECTION
MODEL # R-8738-A1 BY NEENAH FOUNDRY CO. OR EQUAL:
LOCATION NOTED ON REQUESTED DRAWINGS, ATTACHED.
A-1
5. REQUIRED BENCH AREA - RESPONSE: NOTED ON
REQUESTED DRAWINGS ATTACHED. A-1
6. ARBOR PROPOSED DRAWINGS-- RESPONSE: NOTED ON
REQUESTED DRAWINGS ATTACHED. A-1
7. MOUNTED MECHANICAL EQUIPMENT— RESPONSE: NOTED ON
REQUESTED DRAWINGS, ATTACHED. A-1
8. PLAN CHANGES— RESPONSE; I HAVE READ, UNDERSTAND AND
AGREE TO THE TERMS OF #8 UNDER SITE PLAN ISSUES FROM
LETTER RECEIVED, TITLED: STAFF REVIEW COMMENTS NO. 1
LANDSCAPING/STREETSCAPING BUFFER
1 . GROUND COVER, ROCK, SWALES, AND DRAINAGE ETC. —
RESPONSE: NOTED ON REQUESTED DRAWINGS, ATTACHED.
A-1
MISCELLANEOUS
1 . TREE IRRIGATION— RESPONSE: TREE IRRIGATION TO BE
INSTALLED BY, A LICENSED IRRIGATION SPECIALIST.
2. BACKFLOW— RESPONSE: LICENSED IRRIGATION SPECIALIST
WILL FOLLOW, CITY ORDINANCE 2394.
ENGINEERING COMMENTS NO. 1
1 =U--UC /.vF,�`rs?TI[!ur _ _ — RESPONSE: AS WE ARE NOT
CHANGING THE STREET FOR THE WATER LINE BUT MERELY
REMOVING AND REPLACING WITH EQUAL MATERIAL, AND ALSO
ADDING A SIDEWALK FOR THE SAFETY OF PEDESTRIANS ALONG
THE CITY STREET, I WAS HOPING THE PUBLIC INFRASTRUCTURE
FEE COULD BE WAIVED FOR THE ABOVE REASONS AND
BECAUSE OUR PROJECT IS SMALL. YOUR CONSIDERATION
MEANS A GREAT DEAL.
Ps ctr/rcu 170e- d �= —
2. . . 4 _ -. - . - — RESPONSE: COMPLETE
3. FIRE FLOW LETTER— RESPONSE: UNSURE WHERE TO OBTAIN
THIS INFORMATION OTHER THAN THE CITY. THE HYDRANT WAS
ADEQUATE FOR NORTHGATE PARKING GARAGE AND
NORTHGATE PLAZA AND IS WITHIN THE CODES FOR DISTANCE.
YOUR ADVICE ON WHERE TO OBTAIN THIS INFORMATION
WOULD BE OF MUCH HELP.
4. RIGHT-OF-WAY— RESPONSE: NOTED ON REQUESTED
DRAWINGS, ATTACHED. A-1
5. EXISTING SEWER LINES - RESPONSE: NOTED ON
REQUESTED DRAWINGS, ATTACHED, A-1
6. SIDEWALK - RESPONSE: NOTED ON REQUESTED
DRAWINGS, ATTACHED, E-1
7. PUBLIC WATER MAIN- RESPONSE: NOTED ON REQUESTED
DRAWINGS, ATTACHED, E-1
8. ESTIMATE WATER MAIN- RESPONSE: NOTED ON
REQUESTED ESTIMATE, PAGE 1 OF 1
9. FIRE SUPPRESSION- RESPONSE: NOTED ON REQUESTED
DRAWINGS, ATTACHED. E-1
SANITATION
1 . SANITATION WAS APPROVED ON THE PROJECT() (WALLY
URRUTIA, JULY 16, 2008)
GENERAL ELECTRICAL COMMENTS
1 . SERVICE CONDUIT AND WIRE RESPONSIBILITY- RESPONSE: I
HAVE READ, UNDERSTAND AND AGREE TO THE TERMS OF # 1
UNDER GENERAL ELECTRICAL COMMENTS FROM LETTER
RECEIVED, TITLED: STAFF REVIEW COMMENTS NO. 1
2. QUESTIONS CONCERNING GENERAL ELECTRICAL,
ADDRESSED TO SAM WEIDO.
SINCERELY,
BOBBY GRABOWSKI
OWNER CEDAR LANE
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
isgio4
/—� Phone 979.764.3570/Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
July 22, 2008
TO: Robert Grabowski, via fax, 693.1367
FROM: Lindsay Boyer, Project Manager
SUBJECT: CEDAR LANE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Cover memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
addressing the comment);
One (1) complete set of civil construction documents for the proposed
development
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
contact Lindsay Boyer at 979.764.3570.
Attachments: Staff review comments
x
pc: Chad Grauke, 4323 Wellborn, Bryan, Texas 77801'
Robert Forest, 1230 South College, College Station, Texas 77840
Case file #08-00500159
o
01
Cillo v 11
NQS i
d'N r
N i
ill
N iA l4 N
N O P lYW� i
_
t till Z E
N O
`'d zQo C f
r o -
5��11Nf1 0 0
PI1.1- _
azo —
: + N }-11.41 t0
ti oto —
SSd 1J 1SalA
,ct) )' ; iii
odd
i c) D
4'
o
a
J �J h
1 .
rnA .
"., .
• _ 0
�1
D
1
,. (...J.
Wo , 01 �
ch
W
OE- v 3
z
o
i'-.-
:
C7
w
a
a
0
U
41( O
''' S
cip4,
ff„,44-.144 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
September 23, 2008
TO: Robert Grabowski, via fax 693-1367
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: CEDAR LANE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 979.764.3570.
Attachments: Staff review comments
cc: Robert Forest, via mail 1230 South College, CS, TX 77840
Chad Grauke, via mail 4323 Wellborn, Bryan, Texas 77801
Chris Galindo, via email chris(cr�gepinc.net
Case file #08-00500159
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
September 23, 2008
TO: Robert Grabowski, via fax 693-1367
FROM: Lindsay Boyer, AICP, Senior Planner
SUBJECT: CEDAR LANE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Four (4) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 979.764.3570.
Attachments: Staff review comments
cc: Robert Forest, via mail 1230 South College, CS, TX 77840
Chad Grauke, via mail 4323 Wellborn, Bryan, Texas 77801 V
Chris Galindo, via email chris cr.gepinc.net
Case file #08-00500159
1101 Texas Avenue,P.O. Box 9960
(irrCollege Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
September 9, 2008
TO: Robert Grabowski, via fax 693-1367/N?
FROM: LINDSAY BOYER, Staff Planner
SUBJECT: CEDAR LANE (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
$200 processing fee for the next round of three (3) staff reviews
Four (4) revised site and one (1) landscaping plan.
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 979.764.3570.
Attachments: Staff review comments
pc: Robert Forest, 1230 South College, College Station, TX, 77840\/WP
Chad Grauke, via e-mail info(cr�transitiondesignservice.com j�P
Chris Galindo, via e-mail chris(c�gepinc.net•,/J1f
Case file #08-00500159
Home of Texas A & M University
From: <"BiscomFax" BiscomFax>
To: "Npadilla@cstx.gov" <Npadilla@cstx.gov>
Date: 9/9/2008 9:30 AM
Subject: Fax: Tx'ok' Report
This message was sent via FAXCOM, a product from Biscom Inc. http://www.biscom.com/
Fax Transmission Report
To: Robert Grabowski at 6931367
Subject:
Result: The transmission was successful.
Explanation: All Pages Ok
Pages Sent: 3
Connect Time: 2 minutes, 10 seconds
Transmit Time: 09/09/2008 09:28
Transfer Rate: 14400
Status Code: 0000
Retry Count: 0
Job Id: 162
Unique Id: BISCOM_Queue02_0809091427530022
Fax Line: 2
Fax Server: biscom
City of College Station
1101 TEXAS AVENUE
COLLEGE STATION TX 77840
TEMPORARY CO
TEMPORARY
Issue Date 11/19/09
Expiration Date . . . 12/03/09
Parcel Number 144500-0006-0260
Property Address . . 303 COLLEGE MAIN
COLLEGE STATION TX 77840
Subdivision Name . . . BOYETT
Legal Description . . . BOYETT, BLOCK 6, 7 , LOT 26
Property Zoning . . . HISTORIC NORTHGATE
Owner FORREST, ROBERT J
Contractor OASIS POOLS
979 739-7717
Application number . . 08-00002278 000 000
Description of Work . . COMMERCIAL, REMODEL/RENOVATION
Construction type . . . COMBUSTIBLE (UNPROTECTED)
Occupancy type . . . ASSEMBLY (IBC)
Flood Zone
Special conditions .
1 . Rear of property needs to be free and clear of debris,
including plywood, orange construction cones, dirt piles,
etc . Grass needs to be re-established here .
2 .Bike race needs to be painted and installed.
3 .General site clean up needed, including construction
equipment and dead tree .
4 .Bench needs to be installed (9 weeks)
Approved
ding Official
VOID UNLESS SIGNED BY BUILDING OFFICIAL
Page 1 of 1
Lindsay Kramer - Re: Church/College Main Street Trees
From: John Logan
To: Kramer, Lindsay
Date: 11/9/2009 3:56 PM
Subject: Re: Church/College Main Street Trees
The trees on Church and on College Main were 4" high rise live oaks but they didn't live so we are replacing them w/ 2.5
to 3" caliper.The 4" won't live unless they are ball and bag and those are so large they won't fit in our 5' tree wells.
>>> Lindsay Kramer 11/9/2009 3:42 PM >>>
Hi Ed-
I'm trying to track down what size trees the City installed on these streets. We have a contractor that is having difficulty
with the requirements to put in the 4-inch caliper trees required by the UDO, and wanted to find out what we had done
on the City's recent projects, and I can't find anything we reviewed except the restroom project.
Thanks!
Lindsay
Lindsay B. Kramer, AICP
Senior Planner
City of College Station
1101 Texas Avenue S.
College Station,Texas 77840
(979) 764-3570/ (979) 764-3496 Fax
Ikramer@icstx.gov
www.cstx.gov
City of College Station
Home of Texas A&M University CD