HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: GRAHAM RD INDUSTRIAL PARK (PP) - 08-00500150
PLANNING
1. The access easement will be required to be filed before the final plat is submitted.
2. The driveway width exceeds the maximum allowable of thirty-six feet (36'). Please revise.
3. For sign purposes, an off-premise sign will not be allowed. In order to utilize a freestanding
sign along Graham Rd. the properties in front will need to be platted as these tracts together
are considered one building plot.
Reviewed by: Matt Robinson Date: 7/14/08
ENGINEERING COMMENTS NO. 1
1. In order to meet the City's looping requirement, as well as the City's master utility plan, the
proposed water main adjacent to Schaffer Road will need to be extended/connected to the
6-in main which is located further down Schaffer Road. Please provide all appropriate utility
easements for this extension.
2. Upon submittal of final plat/construction documents, please provide a fire flow report to
verify that the appropriate commercial fire flows are being provided to this lot.
3. What is the existing ownership of the abandoned Schaffer Road, please illustrate existing lot
lines and all needed utility easements.
4. Please provide a 20-ft rear PUE for all lots.
5. The subject tracts are located within a Graham Sewer Impact Fees Area ($232.04/ LUE).
Reviewed by: Josh Norton Date: July 10, 2008
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings (i.e. transformers, pull boxes etc) per CSU
specs and design.
7. Developer installs pull boxes and secondary pedestals per CSU specs and design (pull
boxes and secondary pedestals provided by CSU).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
sweido@cstx.gov.
9. Developer provides load data to CSU as soon as it is available to avoid construction delays.
Delivery time for transformers not in stock is approximately 40 weeks.
10. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformer(s), pull box(es), switchgear(s), meter location and conduit routing as
designed by CSU.
11. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 7-9-08
SANITATION
1. Sanitation is okay with this project.
Reviewed by: Wally Urrutia Date: July 9, 2008