Loading...
HomeMy WebLinkAboutCorrespondence TRANSMITTAL PROJECT: ADAMSON POOL BATH HOUSE Friday,June 6,2008 Jason Schubert City of College Station P.O.Box 9960 College Station,Texas 77842 Re Project:Adamson Pool Bath House Replacement ri Enclosed please find one copy each of the following: Site Plan Review Submittal: The Site Review Application Arkitex Drainage letter copy 14 copies site plan Studio, Inc 1 copy landscape plan 308 N.Bryan Ave. Bryan,TX 77803 P(979)821-2635 F(979)775-8222424 Non-Residential Architectural Standards Submittal: F www.arkitex.com Application 1 copy each: Elevations and floor plan and dimensioned floor plan Material sample copy ati C4f Page 1 of 1 Lauren Hovde - Re: Calling for CO for 1900 Anderson St- Adamson Lagoon Bath House irumnmi op.,,, rn m From: Lauren Hovde To: Boykin, James; Bridges, Erika; Caler, Julie; Carson, Mitchell; Cotte... Date: 7/6/2009 10:06 AM Subject: Re: Calling for CO for 1900 Anderson St- Adamson Lagoon Bath House This issue must be resolved prior to a Temp CO being issued. Thanks. v Lauren Amelia Hovde '06 Staff Planner Planning&Development Services Department 979-764-3570 >>> Donnie Willis 7/6/2009 10:02 AM >>> No for CO. 1. The area outside the fence between the bath house and the tennis court is eroding into the rear parking lot. There is not erosion control installed at the site to prevent silt from entering the parking lots then into the storm drain system. Donnie Willis, CFM Environmental Engineering Technician Certified Floodplain Manager Public Works Department 979-764-6375 office 979-229-7632 cell dwillis@cstx.gov >>> On 7/1/2009 at 4:21 PM, in message <4A4BD345.DE2 : 72 : 21330>, Christina Court wrote: bp# 08-3319 Please contact Wick Mckean with Jacody at 774-5613. They are looking for their CO on Thursday, 7/2. Christina Court CSR Planning &Development City Of College Station 979.764.3570 file://C:\Documents and Settings\lhovde\Local Settings\Temp\XP2rnwise\4A51CC8CCity ___ 7/15/2009 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 /—� Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM June 30, 2008 �p TO: Eva Read-Warden, AIA via fax: 979-775-8224 ►" FROM: Lauren Hovde and Matt Robinson, Staff Planners SUBJECT: COCS ADAMSON POOL BATH HOUSE (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Pete Vanecek via fax: 979-764-3737 V NP Case file #08-00500137 TRANSMISSION VERIFICATION REPORT TIME : 06/30/2008 16:04 NAME : FAX . TEL . SER.# : 000L5J596800 DATE,TIME 06/30 16:04 FAX NO./NAME 97643737 DURATION 00:00:25 PAGE(S) 02 RESULT OK MODE STANDARD ECM Grofe„,.--N 11O1 Texas Avenue,P.O_Box 9960 College Station,Texas 77842 Phone 979.764.3570/ Fax 979.784.349E CITY Or COLLEGE STATION MEMORANDUM June 30, 2008 TO: Eva Read-Warden, AIA via fax: 979-775-8224 FROM: Lauren Hovde and Matt Robinson, Staff Planners SUBJECT: COCS ADAMSON POOL BATH HOUSE (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. Please address the comments and submit the fallowing information for further staff review; One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Pete Vanecek via fax: 979-764-3737 Case file#08-00500137 TRANSMISSION VERIFICATION REPORT TIME : 06/30/2008 16:02 NAME : FAX . TEL . SERA : 000L5J596800 DATE,TIME 06/30 16:01 FAX NO./NAME 97758224 DURATION 00:00:40 PAGES) 02 RESULT OK MODE STANDARD ECM 1101 Texas Avenue,p.0.Box 9960 College Station,Texas 77842 4„,r, Phone 979.764.3570/ Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM June 30, 2008 TO: Eva Read-Warden, AIA via fax: 979-775-8224 FROM: Lauren Hovde and Matt Robinson, Staff Planners SUBJECT: COCS ADAMSON POOL BATH HOUSE (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Pete Vanecek via fax: 979-764-3737 Case file#08-00500137 f)-1 1101 Texas Avenue, P.O. Box 9960 CITY OF COLLEGE STATION College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM June 11, 2008 TO: The Arkitex Studio, Inc., Eva Read-Warden AIA via fax 979.775.8224 1 FROM: Bridgette George, Development Coordinator SUBJECT: COCS ADAMSON POOL BATH HOUSE (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan; If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Lauren Hovde or Matt Robinson at 979.764.3570. Attachments: Staff review comments pc: Pete Venecek, City of College Station via fax: 979.764.3/75 3737 ✓ Case file#08-00500137 Home of Texas A&M University TRANSMITTAL/71. PROJECT: PK 0701 ADAMSON POOL BATH HOUSE Wednesday, July 23, 2008 Lauren Hovde i"he Staff Planners, City of College Station, Tx. Arkitex Studio, inc. 308 N.Bryan Ave. Bryan,TX 77803 P(979)821-2635 Enclosed please find one copy each of the following: F(979)775-8224 www.arkitex.com 7 copies A1.1 Site Plan Should you have any question or need further information, please do not hesitate to contact me, Sincerely, i i �! • Mari Portela 0 1161 1.2-3. 08 1:30 300g /10;af_i bg+ 13l TRANSMITTAL It PROJECT: PK 0701 ADAMSON POOL BATH HOUSE Monday, June 30, 2008 Lauren Hovde and Matthew Robinson Staff Planners, the It City of College Station, Tx. Arkitex Studio, Inc. 308 N.Bryan Ave. Bryan,TX 77803 P(979)821-2635 Enclosed please find one copy each of the following: F(979)775-8224 www.arkitex.com A1.1 Site Plan A2.1 Floor Plan A2.2 Dimension Plan A3.3 Elevation Plan Should you have any question or need further information, please do not hesitate to contact me, Sincerely, 4 M ria Portela