HomeMy WebLinkAboutstaff review STAFF REVIEW COMMENTS NO. 1 Project: SPRING CREEK TERRACE (PP) - 08-00500132 PLANNING 1. Please increase the title of the document (PRELIMINARY PLAT) to be '/ " in height. 2. The subject property is currently zoned A-O, Agricultural Open. Without a rezoning request, we cannot further process this application as Lot 1 does not meet the minimum requirements of the A-O, Agricultural Open zoning district which requires a 5 acre minimum lot size. Please revise the lot size or turn in the appropriate rezoning application. 3. The Subdivision Regulations Section 8-G.5 prohibits dead-end streets. The projection of Whispering Creek Drive is required. Please revise or submit a variance request in compliance with Section 5 of the Subdivision Regulations, along with the associated $100 fee. 4. The Subdivision Regulations Section 8-G.2 requires the projection of streets into unplatted property. Please revise the plat to show projections into the unplatted KTH property along Decatur Drive, or submit a variance request. 5. Section 8-M of the Subdivision Regulations require sidewalks along all Rights-of-Way over 50-feet in width. Sidewalks should be provided along State Highway 6 in compliance with this regulation or a variance must be sought. 6. Please extend the 50-foot public access easement from the KTH property to the College Station Market Place property. 7. Please provide all volume and page number for existing easement. If an easement does not have a volume and page number please identify as proposed 8. The Overlay boundary shown on the plat is in the incorrect position. Attached is the limits of the overlay as approved in the ordinance. Please revise and show the correct boundary and correct note 4, although it does not appear to be in the vicinity of this plat at this scale. 9. Decatur is a major collector with a required ROW of 70-feet. A 5-foot dedication is required to meet the requirements of the thoroughfare plan. Please show the 5' right-of-way dedication along Decatur. 10. Clearly show zoning of all adjacent properties. 11. This property is within an impact fee area for sewer. 12. Staff was unable to locate a pipeline on the property as indicated on the checklist. Please clarify whether or not there is a pipeline on this property 13. Section 8-I of the Subdivision Regulations require a 10 foot Public Utility Easement at the rear of each lot for a total of a 20-foot easement. 14. Please tie the plat to a College Station monument. 15. Parkland dedication is required for the platting of all residential property. This plat must go through Parks & Recreation for a determination of dedication before it can be heard by the Planning and Zoning Commission. Reviewed by: Lindsay Boyer, Senior Planner, AICP and Lauren Hovde, Staff Planner Date: June 17, 2008 ENGINEERING COMMENTS NO. 1 1. ROW dedication is required along Decatur. ROW width for a Major Collector is 80 feet. You will need to dedicate half of the deficit. 2. Property is located in Sanitary Sewer Impact Fee Area 97-01 (Spring Creek). Impact Fees will be due at time of building permit. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 0 3. Provide volume and page of all existing easements. 4. Our records indicate a 50' access easement across the front of the property. Please verify. If not already existing, you will need to dedicate a cross access easement. 5. As configured, Lot 1 does not technically have public sanitary sewer. Reconfigure, or extend main to serve Lot 1. 6. The 24" water line can not be tapped with a private service. A public main will have to be extended. 7. Determine the limits of the floodplain. A LOMR is currently underway on this area of Spring Creek. I will see if I can get the BFE in this area for your use. 8. Dedicate appropriate drainage easement per the subdivision regulations. Most likely this will be a private drainage easement since public designation would require construction to public standard. Reviewed by: Carol Cotter Date: June 17, 2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: gmartinez@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 06/12/08 Electric WO# - WF1046109 SANITATION 1. Sanitation is okay with this project. Reviewed by: Wally Urrutia Date: June 11, 2008 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3