HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: PARKWAY BAPTIST CHURCH BLDG C2 (SP) —08-00500116
PLANNING
1. Please submit a NRA application for the proposed addition.
2. Please provide more detail what is being placed in the corner area on the west corner of the
addition. If the curb is removed, that area needs to shown as being striped "no parking".
3. Provide curb detail on the site plan.
4. Please identify the purpose of the wavy line.
5. Show zoning for adjacent properties.
6. Show appropriate area as being striped for fire lane.
7. Please provide the exact square footage of the proposed addition (C2 building).
8. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
Such screening shall be coordinated with the building architecture and scale to maintain a
unified appearance.
9. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not be made of aware of will
constitute a completely new review.
Reviewed by: Lindsay Boyer, Senior Planner, ACIP and Lauren Hovde, Staff Planner
Date: May 23, 2008
ENGINEERING COMMENTS NO. 1
1. Please submit development permit application. We will waive the development permit fee.
2. Although you noted that drainage impacts from the addition are insignificant, we would
prefer that a signed and sealed drainage letter stating such be submitted for our files.
3. Please provide an erosion control plan.
Reviewed by: Erika Bridges Date: 5/27/08
GENERAL ELECTRICAL COMMENTS
1. Electrical service to new addition will come from existing system.
2. No comments required.
3. To discuss please contact Sam Weido at 979.764.6314
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 2 of 3
Reviewed by: Sam Weido Date: 5-21-08
SANITATION
1. Sanitation is okay with this project.
Reviewed by: Wally Urrutia Date: May 21, 2008
TXDOT
No comments.
Reviewed by: Karl Nelson Date: May 19, 2008
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute
toof 3
completely new review. Page