HomeMy WebLinkAboutCorrespondence fArri1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
June 13, 2008
TO: Steve Duncan, Jones & Carter via fax: 979-846-2893
FROM: Lindsay Boyer, Senior Planner, AICP and Lauren Hovde, Staff Planner
SUBJECT: PARKWAY BAPTIST CHURCH BLDG C2 (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following is a list of
staff review comments detailing items that need to be addressed
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Parkway Baptist Church via fax: 979-693-1328
Case file#08-00500116
STAFF REVIEW COMMENTS NO. 2
Project: PARKWAY BAPTIST CHURCH BLDG C2 (SP) - 08-00500116
PLANNING
1. The lay of hose, which is indicated on site plan, is not currently striped in the existing
parking lot. The fire lane must be striped on the site plan to show where the intended
fire lane will be located. Additional copies do not need to be submitted to resolve this
issue. Please feel free to come to the Planning and Development Services office to
amend the plans that were already submitted to us. Please contact Lauren Hovde at
979-764-3570 to set up a time.
Reviewed by: Lindsay Boyer, Senior Planner, AICP and Lauren Hovde, Staff Planner
Date: June 13, 2008
Home of Texas A & M University
TRANSMISSION VERIFICATION REPORT
TIME : 06/13/2008 14:00
NAME :
FAX .
TEL .
SER.# : 000L53596800
DATE,TIME 06/13 13:59
FAX NO./NAME 98462893
DURATION 00:00:20
PAGE(S) 01
RESULT OK
MODE STANDARD
ECM
Vir" 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
Cm?OP COLLAGE STATION
MEMORANDUM
June 13, 2008
TO: Steve Duncan, Jones & Carter via fax: 979-846-2893
FROM: Lindsay Boyer, Senior Planner, AICP and Lauren Hovde, Staff Planner
SUBJECT: PARKWAY BAPTIST CHURCH BLDG C2 (SP) -Site Plan
Staff reviewed the above-mentioned site plan as requested. The following is a list of
staff review comments detailing items that need to be addressed
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Parkway Baptist Church via fax: 979-693-1328
Case file#08-00500116
STAFF REVIEW COMMENTS NO. 2
Project: PARKWAY BAPTIST CHURCH BLDG C2 (SP) - 08-00500116
PLANNING
TRANSMISSION VERIFICATION REPORT
TIME : 06/13/2008 14:01
NAME :
FAX .
TEL .
SER.# : 000L5J596800
DATE,TIME 06/13 14:00
FAX NO./NAME 96931328
DURATION 00:00:29
PAGE(S) 01
RESULT OK
MODE STANDARD
ECM
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 I Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
June 13, 2008
TO: Steve Duncan, Jones &Carter via fax: 979-846-2893
FROM: Lindsay Boyer, Senior Planner, AICP and Lauren Hovde, Staff Planner
SUBJECT: PARKWAY BAPTIST CHURCH BLDG C2 (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following is a list of
staff review comments detailing items that need to be addressed
If you have any questions or need additional information, please call me at 764-3570.
Attachments: Staff review comments
cc: Parkway Baptist Church via fax: 979-693-1328
Case file 408-00500116
STAFF REVIEW COMMENTS NO. 2
Project: PARKWAY BAPTIST CHURCH BLDG 02 (SP) - 08-00500116
PLANNING
- .�_
JON ES & CARTER 700 University Dr.East,Suite 110C TEL 979 731 8000
rCollege Station,Texas 77840-1848 FAX 979 846 2893
ENGINEERS• PLANNERS•SURVEYORS
AUSTIN DALLAS
HOUSTON BRENHAM
SAN ANTONIO RC)SENBERG
COLLEGE STATION THE WOODLANDS
June 9, 2008
Ms. Lindsay Boyer
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Site Plan 2
Parkway Baptist Church, Bldg C2
JC Job No. C0016-001-00
Dear Ms. Boyer,
Enclosed please find the following:
• Seven (7) complete sets of construction documents for your use.
• One (1) original and two (2) copies to be stamped and returned.
• Two (2) revised site plans.
• One (1) 11x17 site and erosion control plan.
Note that the easement dedication sheet and required documents are not attached and will be
submitted separately prior to obtaining a building permit.
The following items are addressed:
PLANNING (Lindsay Boyer)
1. Note added to stripe loading dock as loading/unloading area only.
2. Added.
3. Bubble was removed(Represented old brush line).
4. Added.
5. Note added referencing College Station case file#02-00500176 to show current fire
lane striping for property.
6. Added.
7. Added. 0g,'
(00
[a1
°
ot `9)0
ftC"
Smart Enaineerinct.Smart Solutions TM www.jonescarter.com
ENGINEERING COMMENTS NO. 1 (Erika Bridges)
1. Attached
2. Attached
3. Note was added to place pea gravel bags at site discharge point.
ELECTRICAL—GENERAL (Sam Weido)
1. —3. OK
SANITATION (Wally Urrutia)
1. OK
Very T ly Yours,
teve E. Duncan, P.E.
sduncan@jonescarter.com
SED/cls
Smart Engineering.Smart Solutions TM www.jonescarter.com
1 1101 Texas Avenue, P.O. Box 9960
Ck.ff
College Station, Texas 77842
Phone 979.764.3570/Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
May 23, 2008
TO: Steve Duncan, Jones & Carter Inc. via fax: 979-846-2893
FROM: Lindsay Boyer, Senior Planner, ACIP and Lauren Hovde, Staff Planner
SUBJECT: PARKWAY BAPTIST CHURCH BLDG C2 (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Cover memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
addressing the comment);
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set);
Two (2) revised site plans;
One (1) landscaping plan;
One (1) 11x17 grading and erosion control plan;
Please note that the Easement Dedication Sheet and necessary documents are required prior
to the issuance of a building permit. If there are comments that you are not addressing with the
revised site plan, please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 979.764.3570.
Attachments: Staff review comments
40111
pc: Parkway Baptist Church via fax: 979-693-1328
Case file#08-00500116
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will
I aged toof 3
completely new review.