Thanks. I received the review comment. Sorry our fax is down.
Please call to discuss the one comment as soon as you can.
Thank you,
Jason
Jason Kinnard, AIA
JSA
1711 Cavitt Avenue
Bryan, TX 77801
979.779.5757
Original Message
From: Mandi Alford [mailto:malford@cstx.gov]
Sent: Tuesday, May 20, 2008 9:47 AM
To: Jason Kinnard
Subject: Staff Review Comments
Good Morning Jason,since I am still unable to fax these comments to you
I thought I would just email them Please let me know by responding
to this email that you received them so I can put it on file....
Thanks and have a great day!!
Mandi Alford -Staff Assistant
City of College Station
Planning and Development Services www.cstx.gov malford@cstx.gov
979-764-3743
"Life is a book and you are its author. You determine its plot and pace
and you -only you -turn the pages."
- Beth Mende Conny
College Station. Heart of the Research Valley.
TRANSMISSION VERIFICATION REPORT
TIME : 05/20/2008 08:08
NAME :
FAX .
TEL .
SER. # : 000L5J596800
DATE,TIME 05/20 08:08
FAX NO./NAME 919725566981--439@5#
DURATION 00:00:21
PAGE(S) 01
RESULT OK
MODE STANDARD
ECM
176000900-90#Ow 9SeO
�Y-- 7 60L9-6LL-6L6 'Xed e!n sxc a igoay uola!6u1S w!!' `paeuulyl uosep :od :00
S UawWOO Malna,l;fie}S :s}uawyoe;lb
'0L9£-179L le aw 1120
aseaid 'uoqewaojui leuoll,ippe paau JO suollsenb /ue anew mit 41 'S elep ayZ 6u!u!eidxa Jane!
e yoepe seed 'ueid a4!s pes!nei aye y1!M 6u!ssaappe IOU aae nog( s>luawwo0 eae away;ji
ueid plum uo!soaa pue 6u!pea6 L I X 4 t• (6) 9UQ
ueid 6u!deospuei (t.) auo
sueid a is pas!naa (z) oMl
(las panoadde
auo ueyo eJOW lueM no/( }! se!d00 Ieuomppe l!wgns aseald 'noA pauanlea aq
II!M las auo) payoeue suejd 6u!deospuei pue ails pes!naa aye yip luewdo!anap
pesodoid eq ao} sluewnoop uogon4suoo sias alaldwoo (L) uanaS
:Ma!naa .els aaylanJ
J04 uo!leWJOJu! 6U!MOtlOJ 841 pwgns pue S}uawwoO 944 ssaappe aseald 'sMe!naa (s) eaayl
jo las luenbesgns ay}ao4 pemwgns eq of peau ii!M eel 6u!sseooad out aawoue 'lelpuigns lxeu
eq uo passe ippe ueeq fou aney swat! Ile II 'sMalnaa 4o puna aa}gels Aq mom.' leug pue
pm; eq II!M Iejpwgns;xeu ayl -pessaappe eq o; peau req swa;! 6u!l!e}ap s}uawwoo Ma!naa
TRANSMISSION VERIFICATION REPORT
TIME : 05/20/2008 08:11
NAME :
FAX .
TEL .
SER.# : O00L5J5968O0
DATE,TIME 05/20 08:11
FAX NO./NAME 919725566981--43905#
DURATION PAGE(S) 01 00
RESULT OK
MODE STANDARD
ECM
800Z `64 JeW :a}ea uoslor 31.13 :l(q pannamH
'swawwoo oN
3111d
,ae
t
JSA
Responses to Staff Review Comments No.1 JIM SINGLETON
Project: The Enclave Apartments—Recreational Area Remodel (SP) ARCHITECTS
08-00500094
\/ 1. ING (page 1)
1. Clearly define the existing improvements on site versus the proposed. There are several
lines all around the site that look like there are two layers(around the parking for example)
and there are too many lines to clearly see what is going on. Please call Lauren Hovde
when you receive these comments so we can clarify. We now show a bold line around
- I the borders of the affected area.
V 2. Remove all arrows that have no description.Ww th Laurenae removed all Hovde, we have provided
✓ traneous arrows.
3. Show trees to be removed. Per discussions
the list of removed trees on the site plan sheet.
J4. Provide legend on Sheet A100 stating how many trees to be removed, and their caliper
size, and what trees are being planted to replace those trees. We do not need the
additional details on the shrubs and non-canopy trees being planted. This is now on the
same site plan sheet rather than separate.
/5. Reduce size key map.The key map has been reduced.
✓6. Provide a north arrow.The north arrow is shown on the site plan.
/7. Is the key map to scale or not to scale?There is a scale, but the map states that it is not to
scale. The newly reduced key map is not to scale. It is for orientation purposes
only.
✓8. Provide the legal description of the lot, and please add the total area of the affected area
in the title block.The legal description now appears on the same site plan sheet.The
total area and affected were already shown on the site plan in the bottom right
corner of the sheet.
A. Provide ownership and current zoning of the parcel on sheet A100. There is no need to
put the adjacent property zoning on the site plan since these changes are completely
surrounded by the existing Enclave complex. Ownership and current zoning are now
/ shown on the site plan.Adjacent property zoning will be omitted as noted.
✓ 10. Provide the gross square footage of the new structure in a note on sheet A100. The
gross square footage of 1,624 was already shown on the building.
/
• Rename site plan as The Enclave Apartments — Recreational Area Remodel. The site
/ plan has now been renamed as noted.
✓ 12. We are a little confused as to the building layout of the existing apartment buildings on the
site plan. The aerial we are looking at shows one building to the west of the proposed
changes, not 3. The previous drawing showed the building footprints. The new
drawing shows the breezeways and the rooflines dashed in as well.
V13. What is the rectangle on the west side of the building that is only 12 feet from the
proposed fitness center? Building separation must be 15 feet, and I cannot what this is.
The offending rectangle is a condensing unit pad. It is now noted as such.The new
/ building is 16'-5"from the existing building.
`'14. Provide note with the confirming FEMA/FIRM flood panel as to existence of floodplain on
this tract on sheet A100. There is now a note on the site plan sheet stating that the
site is not in the Flood Plain.
✓15. On the upper left hand corner, what is TRAY? "TRAV" was an extraneous note from
the survey. It has now been removed.
116. What is the dashed line in the parking lot on the west? The dashed lines are Utility
Easement No. 2 2539/23. Noted on the site plan.
✓17. It looks like a corner of the building is in the easement, please clearly show the easement
and gray out the landscaping or use some other method to clearly see if that structure
extends into that easement. The corner of the building is not in electrical easement.
. a
• Page 2 May 7, 2008
Previously, the equipment screening fence was slightly into the easement. It has
now been adjusted to miss the easement.
v18. Please clearly show different utility lines. Electric lines should be—E--, sewer lines should
be—SS—, and water lines should be--W--.Different Utility lines are now designated in
the requested manner.
119. Provide volume and page number of utility easement.2539/23 is the utility easement
where the water main is located. 2539/18 is the Electrical Easement No. 2 noted on
the site plan.
1 20. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above
grade. Such screening shall be coordinated with the building architecture and scale to
maintain a unified appearance. This new building and its equipment are more than
150' from any adjacent properties. However, the ground-mounted equipment will
be screened by a fence and landscaping.This is now noted on the site plan.
LANDSCAPINGISTREETSCAPINGBUFFER(page 2)
✓1. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock (not loose), or a perennial grass is required in parking lot islands, swallesturbed s and drainage
ae
areas, the parking lot setback, rights-of-way, and adjacent property during
/ construction. Now noted on Landscaping Plan.
2. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced
Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as
/ per City Ordinance 2394. Now noted on Landscaping Plan.
/ 3. All BackFlow devices must be installed and tested upon installation as per City Ordinance
2394. Now noted on Landscaping Plan.
ENGINEERING COMMENTS NO. 1 (page 2)
1. Please provide erosion control plan. Now shown on site plan are perimeter and area
drain silt fencing, the construction entrance, and concrete wash-out area.
2. Please illustrate any changes in the existing grading pattern. There are no significant
changes to the grading pattern. Noted on site plan.
3. The site plan needs to clearly identify fire lanes. Now noted on the site plan.
4. Please label and dimension all easements. Existing easements are now noted on the
site plan. There are no new easements required.
5. Please show how the storm drain is being rerouted. One section of the existing storm
drain pipe would be moved south about 8 feet to miss the new building. This line
is shown on the site plan.
6. Please remove water and sewer lines from electrical easement. These lines have been
modified on the site plan.
7. Please show all existing and proposed water lines, sanitary sewer lines, fire hydrants,
and easements. Now noted on the site plan.
8. The site plan should show the full extent of the proposed water line from the point where
it ties into the public 8-inch water line to the point where it enters the building. Please
label the line with material and size. 1" schedule 40 PVC. Now noted on the site plan.
9. The site plan should show the full extent of the proposed sanitary sewer line from the
point where it ties into the sanitary sewer main to the point where it enters the building.
Please label the line with material, size, and slope. Now noted on the site plan. 4" PVC
7% slope.
10. Please verify that the water and sanitary sewer service lines conform to the current
plumbing code. Now noted on the site plan.
• Page 3 May 7, 2008
FIRE(page 2)
1. The dotted lines indicated on the site plan does not correctly show the lay of hose.The
building will now be fire sprinklered in accordance with the applicable Codes.
There is a remote FDC shown at the Fire Lane,due to distance requirements.
2. "The lay of hose"shown from the fire lane goes through the breeze way of another
building.We will not fight a fire through another building. See response to note 1.
3. The proposed building is more then 150'from the fire lane therefore the building is not
permitted to be constructed as shown in the current site plan. See response to note 1.
4. Site plan is denied as proposed. See response to note 1.This newly proposed
solution was discussed and approved with Eric Dotson.
ELECTRICAL COMMENTS(page 3)
1. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights). The existing Electrical easement will be used for new service.
There are no new streetlights or other electrical service requiring new easements.
GENERAL ELECTRICAL COMMENTS(page 3)
Note: the following electrical comments are addressed in the standard specifications issued as
part of construction documents.
1. Developer installs conduit per City specs and design.
a. Included in MEP specs in Construction Docs
2. City will provide drawings for conduit installation
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
a. Included in MEP specs in Construction Docs
4. Developer to intercept existing conduit at designated transformers or devices and extend
as required.
a. Included in MEP specs in Construction Docs
5. If conduit does not exist at designated transformer or device, developer will furnish and
install conduit as shown on electrical layout.
a. Included in MEP specs in Construction Docs
6. Developer pours transformer pad(s) per City specs and design.
a. Included in MEP specs in Construction Docs
7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull
boxes and secondary pedestals provided by the City).
a. Included in MEP specs in Construction Docs
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email
to: bread@cstx.gov
a. Upon approval,AutoCAD version of final site will be electronically mailed to
requested address
9. Developer will provide load data for project.
a. Included in MEP specs in Construction Docs
Re ectfully submitted,
Jason Kinnard, AIA
1711 CAVITT AVENUE
BRYAN,TX 77801
TEL: 979.779.5757
FAX: 979.779.5701
MOB: 979.492.4908
EMAIL: JASON@JSARCHITECTS.COM
1 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
May 19, 2008 101'5/
TO: Perry Miller via fax: 972-556-6952
FROM: Lauren Hovde, Staff Planner
SUBJECT: ENCLAVE APARTMENTS (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
Seven (7) complete sets of construction documents for the proposed
development with the revised site and landscaping plans attached (one set will
be returned to you, please submit additional copies if you want more than one
approved set)
Two (2) revised site plans
One (1) landscaping plan
One (1) 11x17 grading and erosion control plan
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: pc: Jason Kinnard, Jim Singleton Architects via fax: 979-779-57011-------
Case
79-779-5701 (—
Case file#08-00500094
1 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
.��
Phone 979.764.3570/Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
April 30, 2008
TO: Perry Miller via fax: 972-556- 9�2 v1'k�6,
FROM: Lauren Hovde, Staff Planenr
SUBJECT: ENCLAVE APARTMENTS (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Cover memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
addressing the comment);
One (1) revised site and landscaping plan;
Easement Dedication Sheet and required documents.
Please note that the Easement Dedication Sheet and necessary documents are required prior
to the issuance of a building permit. If there are comments that you are not addressing with the
revised site plan, please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 979.764.3570.
Attachments: Staff review comments
pc: Jason Kinnard, Jim Singleton Architects via fax: 979-779-5701
Case file #08-00500094
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will conPage f 4
completely new review.
TRANSMISSION VERIFICATION REPORT
TIME : 05/01/2008 10:25
NAME :
FAX .
TEL .
SER.# : 000L5J596800
DATE,TIME 05/01 1e:24
FAX NO./NAME 919725566981-63480
DURATION 00:01:07
PAGE(S) 04
RESULT OK
MODE STANDARD
ECM
Orff" 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/Fax 979.764.3496
Crry of COLLEGE STATION
MEMORANDUM
April 30, 2008
TO: Perry Miller via fax: 972-556C95 �_Q �61
FROM: Lauren Hovde, Staff Planenr
SUBJECT: ENCLAVE APARTMENTS (SP)-Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review:
Cover memo providing written responses to all of staff's comments (identify the
specific page that each comment was addressed on or the reason for not
addressing the comment);
One (1) revised site and landscaping plan;
Easement Dedication Sheet and required documents.
Please note that the Easement Dedication Sheet and necessary documents are required prior
to the issuance of a building permit. If there are comments that you are not addressing with the
revised site plan, please attach a letter explaining the details. if you have any questions or need
additional information, please call me at 979.764.3570.
Attachments: Staff review comments