HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: FRANK VISOSKI (FP-REPLAT) - 08-00500091
PLANNING
1. Please title the plat as follows: "Final Plat of Lot 14R, Block _, Frank Visoski Subdivision,
being a replat of Lots 13, 14, and a portion of Lots 4, 5 and 15, Block _, Frank Visoski
Subdivision."
2. Is there a Block number on the original plat?
3. Please continue the Cross Access Easement that located on the adjacent property through
the subject property.
4. Please put the approximate right-of-way width on this portion of University Drive on the plat.
5. Updated tax certificates are required. The certificates provided state that taxes are owed
and will be past due after April 30, 2008.
6. Please correct the Certificate of Ownership and Dedication, which states "Lot 14R 1". I am
not sure what the "1" is.
7. Please note that any changes made to the plans, that have not been requested by the City
of College Station, must be explained in your next transmittal letter and "bubbled" on your
plans. Any additional changes on these plans that the City has not been made aware of will
constitute a completely new review.
Reviewed by: Jennifer Prochazka Date: April 28, 2008
ENGINEERING COMMENTS NO. 1
1. Is the 15-ft PUE along the rear of the property adjacent to Poplar St. existing or proposed?
If not existing, we will only require a 10-ft PUE.
Reviewed by: Erika Bridges Date: 4/28/08
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer to intercept existing conduit at designated transformers and extend as required.
4. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
5. Developer pours transformer pad(s) per City specs and design.
6. Developer installs pull boxes per City specs and design (pull boxes provided by the City).
7. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
sweidocstx.qov.
8. Developer provides load data for project.
9