Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 2 Project: SADDLE CREEK PH. 2 (FP) - 08-00500073 PLANNING No comments Reviewed by: Lauren Hovde, Staff Planner Date: April 7, 2008 ENGINEERING COMMENTS NO. 1 1. The 20-ft PUE along the side of Lot 38 needs to maintain a constant 20-ft width as it wraps around the corner to the back of Lot 37. Please label accordingly. Reviewed by: Erika Bridges/ Josh Norton Date: 4/1/08 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION n/a GENERAL ELECTRICAL COMMENTS 1. This plat is in the College Station ETJ, but is out of the College Station Utility electric service area. Customer will have to get with their electric supplier for this area to determine electric service specifications and requirements. Plat reviewed by Timothy Crabb, CSU Electric, (979) 764-3439. Date: 04/01/08. Home of Texas A&M University