Loading...
HomeMy WebLinkAboutCorrespondence CIVIL DEVELOPMENT, Ltd. CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: April 11, 2008 To: Lauren Hovde Development Services City of College Station From: Joe Schultz, P.E. Civil Development, Ltd. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Subiect: Revised Final Plat Saddle Creek Subdivision,Phase 2 Brazos County, Texas 5 Remarks: Attached are 19-11x1T copies a drone full-sized copy of the revised Final Plat for the above-referenced project. The mylar and digital file of the Final Plat will be submitted upon final approval. Revisions have been made as requested on the Staff Review Comments No. 2. The 20' PUE along the side of Lot 38 and the back of Lot 37 has been modified and labeled per your request. Let me know if you need anything else or have any questions. + 14-O ? 1DOO Ac CITY OE COLLEGE STATION Planning d Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 7, 2008 TO: M.L. Schehin, Developer via fax: 979-690-2793' FROM: Lauren Hovde, Staff Planner SUBJECT: SADDLE CREEK PH. 2 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 14, 2008, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, May 15, 2008, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to mtrevino@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Joe Schultz, Civil Development Ltd. via fax: 979-764-77591 Case file #08-00500073 Home of Texas A&M University TRANSMISSION VERIFICATION REPORT TIME : 04/07/2008 11:35 NAME : FAX . TEL . SER. # : 000L5J596800 DATE,TIME 04/07 11: 34 FAX NO. /NAME 97647759 DURATION 00:00: 24 PAGE(S) 02 RESULT OK MODE STANDARD ECM (1114,111111 �� s�U1iF':'!i�r�Olp'" � 0n!{ildgt,«r. CITY OF COLLEGE STATION d l6P`-i tui„ Planning dr Develvinneaas Service,,ro0�.:�s#0,,,,„,,wpags RIrIhN,lasn'7^rwe.. .rmxit:aAnaia,.e,,+na—x.r »».�. <e —, ,....,,,. .....,,...,w w — ....yew ra»•arne 1101 Texas Avenue,„P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 7, 2008 TO: M.L. Schehin, Developer via fax: 979-690-2793 FROM: Lauren Hovde, Staff Planner SUBJECT: SADDLE CREEK PH. 2 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 14, 2008, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, May 15, 2008, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to mtrevinogcstx.gov. I ra,,ainf of this rPauired documents for the Planning & Zoning meeting, your project will be TRANSMISSION VERIFICATION REPORT TIME : 04107/2008 11: 34 NAME . FAX . TEL . SER. # : 000L5J596800 DATE,TIME 04107 11:33 FAX NO./NAME 96902793 DURATION 00:00: 25 PAGE(S) 02 RESULT OK MODE STANDARD ECM ....Ahtifiv CITY OF COLLEGE STATION C s4R" r .r.3:i4•,st_SI!t[iireL`;+YI:I} Planning Ci'Devel p7Anit Service[ r,,o,Fsr:x giorfo �£ YiYvssr:. n.[ ..>wmo m«u n„,,,,,,«.::n•..r.unr 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 97!3.764.35701 Fax 979.764.3496 MEMORANDUM April 7, 2008 TO: M.L.. Sohehin, Developer via fax: 979-690-2793 FROM: Lauren Houde, Staff Planner SUBJECT: SADDLE CREEK PH. 2 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, April 14, 2008, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, May 15, 2008, Too pin. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; One (1) copy of the digital file of the final plat on diskette or e-mail to mtrevino@cstx.gov_ Upon receipt of the required documents for the Planning & Zoning meeting, your project will be CIVIL DEVELOPMENT, Ltd.* CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: April 22, 2008 To: Lauren Hovde Development Services City of College Station From: Ginger Urso, P.E. Civil Development, Ltd. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Subject: Variance Request Information on CD Saddle Creek Subdivision, Phase 2 Brazos County, Texas Remarks: Attached is a CD containing the exhibits for the Variance Request submitted for this project. Let me know if you need anything else or have any questions. t)8 . ;3 og 2-:c * VELOPMENT Ltd.CIVIL DE , CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: March 10, 2008 To: Crissy Hartl Development Services City of College Station [� From: Joe Schultz, P.E. \�C�` Civil Developmen. td. ^ , , ) ;1 7 P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Subject: Draft of Revised Final Plat :; (t C1r_ey &elk-Hampton Subdivision—Phase 2 College Station, Texas Remarks: Attached is a"draft"version of the revised Final Plat for the above- referenced project. Revisions include the following: - Due to septic sprinkling needs, it was necessary to reconfigure the lot layout in a portion of this phase. This resulted in a slight change to the boundary at the rear of Lots 35 & 36 (revised lot numbers). It also resulted in the elimination of a lot. Lot numbers have been revised. - Due to the available buildable area, it was necessary to move the private drainage easement over to the adjacent lot. It was previously on Lot 38 (revised lot number), but now is located on Lot 37 (revised lot number. Since this drainage channel has not been constructed yet, this change was possible at this time. Is it possible to reflect these changes when the signed mylar is submitted, or will we need to make another official submittal. Let me know if you have any questions or need anything else in order to make this decision. } -cie a j 3� 0513 T)EVELOPMENT, Ltd.*' JEERING&DESIGN-BUILD SERVICES ,vANSMITTAL May 8, 2008 To: Josh Norton Development Services City of College taton From: Joe Schultz, P.E. Civil Developme t, d. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Subject: Water Line Plans Saddle Creek Subdivision, Phase 2 Brazos County, Texas Remarks: Attached is copy of the revised water line drawings for this project. The plans were revised to show the new lot layout. Let me know if you need anything else or have any questions. 7 .Og 3:00 03- 13 (Fh2) ,A953- 5? (Ph ) CIVIL DEVELOPMENT, Ltd. CIVIL ENGINEERING&DESIGN-BUILD SERVICES TRANSMITTAL Date: August 7, 2008 To: Josh Norton Development Services City of College Station From: Joe Schultz, P.E. Civil Developme , Ltd. P.O. Box 11929 College Station, Texas 77842 Phone: (979) 764-7743 Subject: Fire Hydrant Reports Saddle Creek Subdivision, Phases 2 & 7A Brazos County, Texas Remarks: Attached for your files are copies of the two fire hydrant flow tests conducted this morning. One test was conducted in each of the two phases. Let me know if you need anything else or have any questions.