HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 2 Project: NAVARRO WEST CENTER (SP) - 08-00500071 PLANNING 1. The curb detail provided is only permitted for temporary curbing. A monolithic curb is required. Please see the Site Design Standards. 2. The buffer wall is required to extend the length of the property line. Staff cannot allow a variation to this requirement. The Design Review Board may hear a waiver request, if you wish. 3. Please include the caliper (min. 1.25") for a single cane for non-canopy trees. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jennifer Prochazka Date: May 16, 2008 ENGINEERING COMMENTS NO. 2 1. Please provide the letter from TxDOT referenced in your response comments. 2. The proposed contours shown on the grading plan appear to be incorrect. 3. Please show a junction box at the proposed tie-in to the 60-inch storm sewer pipe. 4. Please adjust 18-inch storm sewer pipe to match soffits with 60-inch storm sewer pipe. 5. Please provide detail of detention pond sump pump. 6. Engineer's Cost Estimate needs to be specific about what sizes, materials, etc. are required for the project. Please revise. 7. The Engineer's Cost Estimate, Drainage Report, and Water/ Wastewater Report need to be signed and sealed by the engineer. 8. Water Report— It appears that the maximum velocity of"12.6 gallons per minute" is an error. Please revise. 9. Water Report — It appears that the "100 gpm" fire hydrant flow requirement is an error. Please revise. 10. Water Report — It appears from your fire flow calculations that you are exceeding the maximum velocity of 12 fps. Please verify. 11. Water Report — Please clarify how you obtained your "Q" values for the fire and domestic flow calculations. 12. Drainage Calcs — Please show the flow path for the emergency overflow. 13. Drainage Calcs — Please clarify where the "C" values used in pre- and post-development calculations came from. 14. Drainage Calcs— Please clarify how you got your final release rate. 15. Drainage Calcs — The values in the "Qe" formula that you are showing appear to be incorrect. 16. Drainage Calcs — Please provide water surface elevation information at the inflow points. Reviewed by: Erika Bridges/ Carol Cotter Date: 5/20/08 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 STAFF REVIEW COMMENTS NO. 1 Project: NAVARRO WEST CENTER (SP) —08-00500071 PLANNING ,i1/ The end island just south of the driveway from Wellborn Road states that it is 275 square feet in area, but is smaller than islands labeled 180 square feet. Please correct. v The minimum end island size is 180 square feet. X Are the number of breaks in the curb shown adjacent to the detention pond needed? „4 Parking spaces that are only 18' in length require a minimum clear space of 2' at the end of the space. The parking spaces adjacent to the detention pond will not have the minimum clear space because screening is required around the detention pond area. "Compact" parking spaces are not permitted. 18-foot spaces are permitted, but cannot have a wheel stop and must have 2' clear space at the end of the space. %,1 Interior parking islands are required in the interior parking rows. 180 sq ft. of area per 15 spaces. X Fire hydrant at the rear of the property does not appear to be accessible because it is located behind a dumpster enclosure. r.8Please provide the inside clear dimensions of the dumpster enclosure — minimum 12'X12'. The detail should be located on the site plan. I believe the detail currently -shows a bollard. Bollards must also be out of the clear area. 1.91 Dumpster material must match building. +1Q:The vicinity map is not readable. If Under "Code Analysis" it states "zoned C-2." Property is zoned C-1. ',1`L1The parking analysis states that you are providing parking for a "storage area." I believe that this area is a sales area. t1 he street name is spelled "Wellborn." 4lease include the proposed legal description (lot and block by new plat) in the title lock. '-15. P ase include zoning of this and all adjacent properties. Please show distances to opposite and adjacent driveways. ,4-7'Driveway width is measured at the property line. Please provide this dimension on the plan. W. Please include curb return radii. 46 Please include the curb and pavement detail on the site plan. Standard details can be found in the Site Design Standards. . Please include the bicycle rack detail on the site plan. Standard details can be found in the Site Design Standards. iyi1Please include utility information on the site plan; it is not necessary to provide the extra 1y/ sheet. Provide a general note that "all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance." 23. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 5 Reviewed by: Jennifer Prochazka Date: April 7, 2008 LANDSCAPING/STREETSCAPING/BUFFER "Mulch" is not an approved ground cover. It may be used within planting beds, but is not appropriate as a stand-alone ground cover, as is shown in the "mulch strips." VZ Please provide required detention pond screening (Section 7.9). 2iPlease show detention pond. cA!Please provide required detention pond screening information. It appears that the dgtention pond is in the required buffer area. Detention is not permitted 'n the buffer. S-t-wc.I-vre c-v(- loPer GI Buffer plantings should continue the entire length of the property line (north). Non-canopy tree size should be provided in caliper inches of a single cane (measured at 12" above grade). :. 'lease provide buffer wall detail. �:. ease remove sign from plan. .40. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock (not loose), or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Reviewed by: Jennifer Prochazka Date: April 7, 2008 MISCELLANEOUS ,t/Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2/All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. Please provide written response to all comments. 2. I am confused by your submittal. You seem to be basing your design with the widening of Wellborn Road being complete. I do not have start time for TxDOT's project. As proposed, you will need to wait until the widening project is complete, or design you site on existing conditions with allowance for their project. How are you coordinating this project with TxDOT's widening? Also, we need a total of four copies of plans for permit. Please submit an additional, or four revised to show culvert. 3. Access driveway to Wellborn shall be right-in, right-out only, due to a future raised median at this location. 4. Are you not proposing a culvert under the proposed driveway off Wellborn? As shown you will be blocking drainage in the roadside drainage ditch. 5. Provide sizing calculations for the culvert for you proposed driveway. 6. Driveway permit needs to include stormwater discharge and culvert sizing calculation information which was not provided. Your Driveway Permit will be forwarded to TxDOT once this information is provided and reviewed for completeness. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 3 of 5 7. Please show all existing and proposed public water mains and sanitary sewer lines in close proximity to this site. 8. The 6-inch waterline extending from Steeplechase Subdivision Ph.7 already serves one fire hydrant. We are concerned that an additional fire hydrant may produce excessive velocities. Please verify. 9. Please show existing and proposed contours on grading plan. 10. Please provide details on storm sewer tie-in in TxDOT ROW. Junction box will be required. 11. What is TxDOT's schedule for the storm sewer installation and your contingency plan since it appears that your site will be developing before the storm pipe gets there? 12. Please show all easements on utility plan. It's difficult to tell if all of the infrastructure is in appropriate easements. 13. Provide detail of sump. Structures are not allowed in a PUE. 14. Fire flow report must verify that the proposed fire hydrants will meet minimum flow, velocity, and pressure requirements as specified in the BCS Unified Design Guidelines. Please revise. 15. I am assuming there is a fire wall between Space A and Space B from the way the report provides the information. Please revise report to indicate the construction of fire wall that allows for the independent fire flow requirements. 16. Address discrepancy between wastewater flows provided in the report (125gpm) and the Site Plan (1.74gpm). 17. It appears that your pavement and curbing blocks the drainage flow path of the adjacent property. Please explain in your drainage report any negative impact on the adjacent property and any necessary mitigation. 18. Please provide drainage report. 19. Please submit erosion control plan. 20. Please provide Engineer's Cost Estimate for public infrastructure. 21. Please submit"Letter Acknowledging City Standards". 22. Include BCS Unified Details with Civil Construction Plans. 23. Additional comments may result from review of required documents not submitted with initial application. Reviewed by: Erika Bridges/ Carol Cotter Date: 4/17/08 FIRE 1. Fire Hydrant will be located within sight of Fire Lane. (IFC 2006 508.5.4) 2. #37 in notes shall read 75,000 PSI instead of 3500 PSI. (IFC 2006 503.2.3) 3. Knox Box needed for location ( IFC 2006 506.1) (see Steve Smith, 764-6273, for info) 4. Fire lane sign at both entrances ( Chapter 6 City Ordinance) (see construction guide) Reviewed by: Steve Smith Date: 04/01/2008 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 4 of 5 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to bread(a�cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: April 1, 2008 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 5 of 5