Loading...
HomeMy WebLinkAboutStaff Review 0 STAFF REVIEW COMMENTS NO. 1 Project: SOUTHWOOD VALLEY SECT. 23 (FP) - 08-00500068 PLANNING COMMENTS 1. Please relabel the name of the plat as follows, or similarly: FINAL PLAT of Lots 1-R & 2-R, Block 54 Southwood Valley Subdivision, Section 23 BEING A REPLAT of Lots 1A, 1B, 2A, & 2B, Block 54 Southwood Valley Subdivision, Section 23 2. Please submit paid tax certificates. The plat will not be filed before we receive paid tax certificates. 3. Please verify that the existing wood decks are not covered. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Crissy Hartl, AICP Date: April 4, 2008 ENGINEERING COMMENTS 1. No comments. Reviewed by: Erika Bridges Date: 3/31/08 GENERAL ELECTRICAL COMMENTS 1. No comments at this time. 2. To discuss any future issues regarding this property contact Sam Weido at 979.764.6314 prior to construction. Reviewed by: Sam Weido Date: 4-1-08 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2