HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: TRADITIONS AT LUTHER (PP) - 08-00500012 PLANNING 1. The sidewalk on Luther is being extended from the Melrose property with the Novosad plat. Please show the extension of the sidewalk and provide the appropriate changes to the construction documents with the final plat. S si4EEr 61 .4 'Q 2. Please provide information that fee in lieu of land dedic tion has been approved by sPaS• the Parks and Recreation Department. APpRoVNL FN t oCEs5-- Reviewed by: Lindsay Boyer Date: January 28, 2008 ENGINEERING COMMENTS NO. 1 1. Please extend 10-ft PUE along front property line as done on adjacent tract. Reviewed by: Josh Norton Date: January 25, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: January 23, 2008 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides load data for project. 9. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 1-25-08 STAFF REVIEW COMMENTS NO. 1 Project: TRADITIONS AT LUTHER (PP) - 08-00500012 PLANNING 1. The sidewalk on Luther is being extended from the Melrose property with the Novosad plat. Please show the extension of the sidewalk and provide the appropriate changes to the construction documents with the final plat. 2. Please provide information that fee in lieu of land dedication has been approved by the Parks and Recreation Department. Reviewed by: Lindsay Boyer Date: January 28, 2008 ENGINEERING COMMENTS NO. 1 1. Please extend 10-ft PUE along front property line as done on adjacent tract. Reviewed by: Josh Norton Date: January 25, 2008 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: January 23, 2008 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides load data for project. 9. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 1-25-08