Response to Staff Review Comments No. 2
Castle Rock Subdivision
Preliminary Plat(Revised)
PLANNING:
1. The title block zoning infonnation has been changed to PDD.
2. Note#3 has been changed back to PDD.
For informational purposes,please note that this plat has been submitted 8 times
now (Original 12/05,Rev 12/05, Rev #2 12/05, Rev 8/06, Rev#2 8/06, Rev 5/07,
Rev 6/07, and now Rev #2 6/07). In each of these submissions up to 5/07, Note#3
has stated the zoning as PDD, Planned Development District. Staff Review
Comments No. 1, which triggered the first 6/07 revision, requested that we change
it to PD, Planned Development. Now, Staff Review Comments No. 2 is asking us
to change it back to what we had. Why the confusion? Are previous Staff Review
Comments (and our responses) not referred back to when doing subsequent
reviews?
3. Note #13 has been added to the plat to address the reduction of cut-through traffic using
the 25' access road from Phase 1B. It is not the Developer's intent to completely eliminate
the cut-through traffic.
4. Street names have been changed as requested.
For informational purposes,please note that on all 7 previous versions of this
preliminary plat, street names were approved. For previous submissions of the
Castlegate Subdivision development(Section 11,for example), street names were
kept the same as they crossed other streets, and we were asked by staff to change
them to different names. Why the conflict in requirements?It appears there is a
lack of consistency in the street naming requirements.
✓5. Common Areas are not going to be renumbered,but a sentence noting the omission of
Common Area No. 4 has been added to Note#10.
t 6. A 10' PUE has not been added. It is not clear due to the hatch pattern originally used that
there is an existing 20' PUE adjacent to the back of these lots, making a total of 30' of
PUE available for utility placement. The hatch pattern has been changed to help clarify
this existing easement. We have also attached a sketch to this response showing this area.
OTHER CHANGES MADE:
- The phase line between Phases 1A and 2B was adjusted slightly where it crosses Rocky
Creek Trail near Lot 5, Block 10. This change was made so the phase line on this
preliminary plat matches the Final Plat for Phase 1 A.
- Additional survey data was obtained after the layout of Phase 1B was complete. Because
of this data, the 25' access driveway in Phase 1B has been shift-• • -r to miss an existing
utility pole (from between Lots 4 & 5, Block 11 to betwee / ots 5 & 6 :lock 11).
Adjustments were also made to the waterline, adjacent lo lines, and the access easement
lines. 0G4- sht '34if
- Additional public utility easements were added in various locations per the College Station
Utility's request, with a majority of them being 5' PUE's between lots.
0 Response to Staff Review CommeLlo. 1
Castle Rock Subdivision
Preliminary Plat(Revised)
PLANNING:
1. Metes &bounds has been adjusted to close.
2. The title block does not show a PDD zoning, as stated. It shows PD, and it has not been
changed.
3. Note#3 concerning the zoning has been revised. Note#4.B has been revised. For Parkland
Dedication, the plat shows 4.19 acres in one area, and then a 0.173 acre piece behind Lot 42,
Block 2, for a total of 4.363 acres of dedication for Phase 1A.
4. The Phase &Lot Summary has been corrected.
5. The number of lots on this plat less than 50' in width and 100' in depth has been reduced. The
Concept Plan for this project allows up to 12 lots. To meet this requirement, there are no
longer any lots less than 100' in depth. There are now 12 lots less than 50' in width. They are:
Block 2, Lots 8, 9, 10, 11,41, 42, 43 &44; Block 6,Lots 19, 20 &21; and Block 10, Lot 14.
6. Lot widths for Block 2, Lots 43 &44 have been clarified.
7. The access easement is proposed as a 25' wide driveway to provide emergency access for
Phase 1C of the residential development and access to the commercial lots as they develop.
The driveway is designed to reduce speed, therefore it will discourage "cut-through" traffic,
which may try to use it as a right-of-way.
8. A temporary turnaround has been shown.
9. A temporary turnaround has been shown.
10. Street names have previously been approved with previous versions of this preliminary plat.
No changes have been made.
11. Greenbelt/Buffer No. 4 was removed with the addition of the commercial lots.
12. The pool and parking area has been turned into a Common Area(Amenity Center).
13. The parkland dedication changed slightly when the Rocky Retreat Cove cul-de-sac and
associated lots (Block 2, Lots 53, 54 & 55)were removed. Since Phase 1A had already been
platted, the boundary line along the park where the cul-de-sac was originally located could not
be changed. Since there is no longer a need for the circular area for a cul-de-sac, that small
area(0.162 acres) is being added to the park.
14. 10' PUE's have been added in the greenbelt/buffer areas in the back of the following lots:
Blcok 9, Lots 1 thru 8; and Block 10, Lots 1 thru 5.
ENGINEERING:
1. An 8"waterline has been added to serve Lots 1 thru 3,Block 11.
2. Noted.
3. Noted.
4. Noted.
5. Noted.
FIRE:
1. According to the ordinance, since there are only 30 lots proposed for Phase 1A, emergency
access is not required.
SANITATION:
1. Temporary turnarounds have been shown in the 2 locations requested.
ELECTRICAL:
1. Noted.
2. Noted.
3. Notes on plat have been revised as r quested.
General Electrical f,omineiais 113‘k' bk' ii i te�l.
STAFF REVIEW COMMENTS NO. 1
Project: CASTLE ROCK (PP-REVISED) - 07-00500132
PLANNING
1 . Plat does not close. Please revise metes and bounds.
2. In the title block, the zoning is PDD (the Comp Plan Land Use designation is PD).
3. In the plat notes:
■ The whole subdivision is referenced as PDD. Please update to include the A-P
information.
■ There is no longer a Lot 22 in Block 10.
■ The amount of parkland to be dedicated with Phase 1A is described as 4.363 acres,
but the plat shows 4.19.
4. The Phase and Lot Summary has a number of discrepancies. Please double check the
number of lots in each phase.
5. The number of lots less than 50 ft. in width and 100 ft. in depth exceeds that allowed by
the DRB.
6. The lots widths of Lots 43 and 44 Block 2 in Phase 4 are not clearly defined.
7. Please identify how the access easement between the commercial and residential
areas will be utilitzed or constructed—it should be clear that this will not function as a
right-of-way.
8. Phase 2A will need a temporary turnaround on Hollow Stone Drive.
9. Phase 6 will need a temporary turnaround on Rolling Stone Drive.
10.Streets that are aligned across Castle Rock Parkway should have the same street
name.
11. Is there a buffer or greenbelt numbered 4?
12.The pool and parking area will need to be identified as some type of HOA lot.
13.The amount of parkland dedication has changed between the previous preliminary plat
and the current one. Please clarify.
14.PUE dedications will be needed in greenbelts and buffer areas when necessary to
complete the 20-ft easement along rear of all lots.
Reviewed by: Molly Hitchcock/Jeffrey Missal Date: June 6, 2007
ENGINEERING COMMENTS NO. 1
1. Show how you are providing water to Lots 1-3 Block 11 Phase 1B. Services are not
allowed off water lines 18" in diameter and larger. You will have to extend a public
main.
2. TxDOT permits will be required at Final Plat for driveway and utility connections in
ROW.
3. During construction, extra caution will need to be used in areas near Conservation
Easement and Deed Restricted Areas to not negatively impact the vegetation and
drainage pathways.
4. A perimeter fence shall be installed to protect Conservation Easement from off-site
threats during construction.
5. Modifications to drainage discharge outfalls may be required to protect Conserval:ion
Easement and Deed Restricted Areas. This will be determined at Final Plat stage with
review of construction documents.
Reviewed by: Carol Cotter Date: June 13, 2007
FIRE
1. Emergency access will need to be provided with Phase 1A. A temporary. All-weather
surface will be acceptable. Please contact Steve Smith if you have questions or would
like to discuss alternatives.
Reviewed by: Steve Smith, Deputy Fire Marshal Date: June 11, 2007
SANITATION
1 . Need temporary turnarounds at end of Hollow Stone Dr. and Rolling Stone Dr.
Reviewed by: Wally Urrutia Date: June 7, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
3. The following construction notes need revision:
9. Subdivision Electrical Service:
B. Contractor to furnish rigid or IMC conduit (30' per riser pole). Contact city
prior to placement of stub ups at base of pole. Improperly placed stub ups
will be corrected at the expense of the contractor. College Station Utilities
will install all riser conduit.
C. Contractor shall install transformer pad in accordance with city specifications.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as
required.
5. If conduit does not exist at designated transformer, developer to furnish and install
conduit as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes and secondary pedestals as per City specs and design
(pull boxes and secondary pedestals provided by the City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email
to: bread@cstx.gov.
9. Developer provides load data for project.
10.To discuss any of the above electrical comments please contact Brent Read at
979.764.5026.
Reviewed by: Brent Read Date: June 6, 2007
L
0 0
STAFF REVIEW COMMENTS NO. 2
Project: CASTLE ROCK(PP-REVISED) -07-00500132
PLANNING
1. In the tide block, the Land Use Plan designation(PD) is referenced. Instead, the zoning(PDD) should
be identified.
2. In Plat note#3,please reference the zoning as Planned Development District (PDD).
3. To prevent commercial cut-through traffic in the residential area,please identify what barrier will be used
to prevent the vehicular use of the access easement for non-emergency purposes. Bollards may allow for
pedestrian and bicycle traffic while restricting vehicular access and/or parking.
4. The previous preliminary plat should have had the street names consistent across Castle Rock Parkway.
As a new preliminary has been submitted,please make this correction.
5. It is not necessary,but you may renumber the common areas if you wish.
6. Please add a 10-ft. PUE behind lots 6-14 Block 10.
Reviewed by: Molly Hitchcock/Jeffrey Missal Date: June 25,2007
0
STAFF REVIEW COMMENTS NO. 3
Project: CASTLE ROCK (PP-REVISED) -07-00500132
PLANNING
1. In reference to the PD vs. PDD comments, I apologize for not making the note more clear in
the first round of review comments. We had stated that"In the title block, the zoning is PDD
(the Comp Plan Land Use designation is PD)." We are only concerned with the zoning in the
title block,not the Comp Plan Land Use Designation,which was being shown. We tried to
clarify this in the second round of comments. Thank you for making the change to reflect the
PDD zoning.
2. In reference to the street names, we are aware that the street naming issue was missed on the
first Castle Rock preliminary plat and we appreciate you working with us on the new plat. The
street naming issues are usually at the request of groups involved with addressing (e.g., land
management,911).
3. Our recommendation is that a driveway should not be allowed between the A-P and the
residential as it will encourage cut-through vehicular traffic. Please let us know how you would
like to proceed on this issue.
Reviewed by: Molly Hitchcock/Jeffrey Missal Date: July 6,2007
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your
next transmittal letter and"bubbled" on your plans.Any additional changes on these plans that have not been pointed out to the
City,will constitute a completely new review. 2 of 2