HomeMy WebLinkAboutLetter of Completion LETTER OF COMPLETION
CITY ENGINEER DATE: /(/-1°/) 7
CITY OF COLLEGE STATION
COLLEGE STATION,TEXAS 4,tier..c.X
RE: COMPLETION OF Z 0/1/ PNS
?/_45t /0
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station,Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to byErde� y $„5 &;91sSJ�YQ
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WAR- •NTY D•TE
7),AA [,7/15.t... // C'7
(A/1 a — _ (i 2 d7
/
s.W 11 1E. - 6 7
OwneEEc4 4145.5 j y4 Contractor. 205 6a4 1,,,,, s
Phone Number:/7/4 5-2,3.L Phone Number:F7 9 A-573--7'7-7
Address;5)J � 44Cbe Address:67- 2.- . e- ��sre.
C S ? ) g'S(J /2/C Ca../-4`-
c /left J f.Q71/c•-__ 7d-- 77p K
Signature:,.1�4jf,.., //d Signaturre: _ cc2—�/��
i
ACCE'1'ANCE&APPROVAL
es120
City Repr entative
• ity ngineer
A2. 1/1/41/1.----'
C)--V\(-
Revised 1/31107
LETTER OF COMPLETION •
CITY ENGINEER DATE: /1-.-- (1/7
CITY OF COLLEGE STATION
COLLEGE STATION,TEXAS Le RE: COMPLETION OF er.1 S (744 Au S'
I (1.4.5 —___/0
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station,Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to bz g s5 ( T' , i
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WAR' •NTY D•TE
tti/15- _ /7Ar° 7
(„J-4,-(.a rt ,2 Ve 7
s--„,,,,it- _ _it/z o7 -
OwnerE 44.4 5./� c449 yrQcontractor: ?os' V� -JPf't/!f
Phone Number:/7J•. ..7. .5 Phone Number: F?9 A57-3---.T2'7"7 /
Address,3lj (pc,/l/ .dc' Address:(/r / � ,fry*e-wfDrf/Te•t
G .S ? 7gx5 /X12CCV-4ti
C^_// X- f A49//vim ta-- 77J-9 KJ .
Signature:9 .40E-A2.# ,ili�—� � Signature: / c %4)\-_,
ACC_ 1'ANCE&APPROVAL
City Repr-:entative
,
/&4741/4 ‘
ity ngineer