HomeMy WebLinkAboutLOC LETTE R OF COMPLETION 0 Off - 1 p
CITY EN :: NEER DATE: Vto/C"
CITY OF f,;OLLEGE STATION
COLLEGE STATION, TEXAS
RE: COMPLETION OF -_
Dc ar Sir:
The purpose of our letter is to request that the following listed improvements be
ap:proved and aooepted as being constructed under City inspection and completed
ac:ording to plans and specifications as approved and required by the City of College
St;iI:ion, Texas. This approval and acceptance by the City is requested in order that we
mt i,r finalize arty subcontracts and to affirm their warranty on the work. This approval
an:I acceptance by the City of the improvements listed below does hereby void the letter
of ;guarantee for the listed improvements on the above referenced project, tt l
Th one-year warranty is hereby affirmed and agreed to byes= 4RU.Ukclo�+ tN t'
an :I by their subcontractors as indicated by signatures below.
WORK COMPLETED DATE
,te_'t s S i elstw 4 01{5. ! 5/? ?
4,1404 -\-env 4/s tal _.
40/479
Ou rner: W: CS- 0v j Contractor: 1 RAS os ,►;ns ,!M4.
M{ fling Address: ` Coo 1 Address: To - o& 7/4
5 �t /� �t `Tic. 77/574,
Sic•-nature:
Signature;
AC CEPTANC APPROVAL
e.77epre 3e'tative __PLAT FILED
►�; OFFSITE ESMTS FILED
<; TEMP BLANKET ESMT FILED
G. • OTHER ESMTS NEEDED
it Engin er