Loading...
HomeMy WebLinkAboutCorrespondence okm - -(,)1 RABON M ETCALF ENGINEERING 1979)640-0329 - Home 4 O POST OFFICE BOX 9253 (979)690-0329 - FAX 3q COLLEGE STATION,TEXAS 77842 (979)219-4174 - CELL___ 1,, 11.1 EMAIL: rmen6ineer(�Inao.com T---3 --_______- oi-qq May 2, 2007 Carol Cotter,E.I.T. Graduate Engineer City of College Station 1101 Texas Avenue South College Station,TX 77842 RE: A&M Super Storage,College Station-Initial Submission 17309 S.H. No.6 South,College Station,TX RME No. 213-0308 Mrs. Carol Cotter: Please find attached the following sets of construction plans for the above referenced project. These plans are ready for your review. 2—Complete Sets of Construction Drawings; 11 —Civil Site Plan; 1 —Landscape Plan; 1 —Site Plan application&fees; 2—Drainage Letter; 2—Utility Letter; 1 —SWPP Plan(11x17 size); 1 —TCEQ NOI; 4—TxDOT Driveway Permit; 2—Engineer's Cost Estimates(Water Line) Please do not hesitate to call if you have any questions. Sincerely, Rabon A. Metcalf,P. rabon@rmengineer.com' CD1-213-0308-L02 Page- 1 of 1 roll% 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM August 8, 2007 TO: Rabon Metcalf, via email rabon@rmengineer.com FROM: LINDSAY BOYER, Senior Planner SUBJECT: A&M SUPER STORAGE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 processing fee for the next round of three (3) staff reviews Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan Easement Dedication Sheet and required documents If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: E. Hubbard Kennady III, Ltd. via email ehkthr1@msn.com Case file #07-00500099 • 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM June 22, 2007 TO: Rabon Metcalf, via email rabon@rmengineer.com FROM: Lindsay Boyer, Staff Planner SUBJECT: A&M SUPER STORAGE (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents One (1) revised site plans One (1) landscaping plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: E. Hubbard Kennady III, Ltd. via email ehkthr1@msn.com Case file #07-00500099 ff,„„1-4,414 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM May 14, 2007 TO: Rabon Metcalf, via email rabon@rmengineer.com FROM: Lindsay Boyer, AICP SUBJECT: A&M SUPER STORAGE (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan. Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Hubbard Kennedy, via fax 979.846.7880 Case file #07-00500099 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 1 of 6 ..„ _____ P.O.Box 9253,College Station,TX 77842 1EOff/Fax:(979)690-0329 /�/ Engineers email: civil@rmengineer.com ignsu September 17,2007 , 6\ Josh Norton,E.I.T. �- y‘,0 (A Graduate Engineer �'p and �����`� Lindsay Boyer o�ll" Staff'Planner 1 City of College Station 1101 Texas Avenue South College Station,TX 77842 RE: A&M Super Storage,College Station—4th Submission Set& Permit Package 17333 S.H.No.6 South,College Station,TX RME No.213-0308 Josh and Lindsay: Please find attached the following information and construction drawings for the above referenced project. These plans are ready for your review and approval. 10 — Complete Sets of revised Construction Drawings w/BCS & TxDOT standard detail sheets (please return the extra four(4) copies to RME); 'PP 2—Civil Site Plan w/Staff Review Comments No. 3 responses;5? 1 -Landscape Plan;IiP 1 —(11x17)Erosion Control Plan&Grading Plan;V2 1 —$200 Processing Fee; 2—Utility Letter—Revision No. 1;2P 2—NRA Color Sheet(submitted per the request of Hubbard Kennedy);)\, 1 —Executed Drainage Easement Agreement;'bP 1 —Letter Acknowledging City Standards; U) 1 —Copy of TCEQ Exception Letter(Water Line Improvements);PP 1 —Revised Engineer's Cost Estimate; Please note the following changes have been made to the Civil Site Plan and relevant Construction Drawings that were not requested by CoCS. 1. Minor adjustments and realignment to the property boundary to reflect McClure & Browne's(MB)bearing system; 2. Deleted permitting of portable storage unit area along north property line; 3. An actual on-the-ground survey was received by RME and this survey revealed that the north-south driveway had to be adjusted to accommodate the existing placement of the ETC gas risers. Also, a new power line was recently install (in the last month) along the north boundary line. Medians were added to accommodate the pole locations. Page 1 of 2 CD 1-213-0308-L09 A&M Super Storage,College Station,TX ME4th Resubmital&Permit Package C.onsulttn blyineerS September 17,2007 4. Perimeter wrought iron fence, around gas risers, was removed; 5. Addition of 5' walk along west property line adjacent to East Frontage Road. It is the Developer's intent to NOT install this if the requested variance is approved; 6. Adjust proposed PUE's to reflect MB Final Plat; 7. Adjust proposed sanitary sewer manhole and service line to match proposed improvements reflected on MB construction drawings; 8. Extension of private 36" storm drainage line to extend approximately 38' further south and across the existing sanitary sewer line; 9. Adjustments to landscape along frontage road to accommodate new sidewalk and minor driveway/parking modifications, and also the addition of three (3) canopy trees along south property line; 10. Adjust tie in of this project's 12" water line connection to MB proposed 12" water line extension; 11. Updated Bicycle Rack detail to reflect current standards shown on Site Design manual; 12. Added optional gates to Dumpster Pad detail. Please do not hesitate to call if you have any questions. Sincerely, / Rab e' A. Metcalf, P.E. rabon@rmengineer.com Page 2 of 2 CD 1-213-0308-L09 1 1101 Texas Avenue,P.O. Box 9960 4-ffCollege Station,Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 Gin of Col.1.EGE STATION MEMORANDUM August 8, 2007 TO: Rabon Metcalf, via email rabon@rmengineer.com FROM: LINDSAY BOYER, Senior Planner SUBJECT: A&M SUPER STORAGE (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: V$200$200 processing fee for the next round of three (3) staff reviews '' vrSeven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one ,.approved set) 2 0r-Gtol4 1U SW.d1S Two (2) revised site plans VOne (1) landscaping plan 1/7.One (1) 11x17 grading and erosion control plan Easement Dedication Sheet and required documents If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: E. Hubbard Kennady III, Ltd. via email ehkthr1@msn.com Case file#07-00500099 /001 (: 93 ()kffCollege 1101 Texas Avenue,P.O. Box 9960 L�Station,Texas 77842 Phone 979.764.3570/Fax 979.7643496 0") •g� MEMORANDUM June 22, 2007 TO: Rabon Metcalf, via email rabon@rmengineer.com FROM: Lindsay Boyer, Staff Planner SUBJECT: A&M SUPER STORAGE (SP)-Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another$200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: 1/:One(1)complete set of construction documents V One (1) revised site plans ZOne (1) landscaping plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: E. Hubbard Kennady III, Ltd. via email ehkthrl@msn.com Case file#07-00500099 1101 Texas Avenue, P.O. Box 9960 fAr- College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM May 14, 2007 TO: Rabon Metcalf, via email rabon@rmengineer.com FROM: Lindsay Boyer, AICP SUBJECT: A&M SUPER STORAGE (SP)-Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: 1/ One (1) revised site and landscaping plan. 1\3/16s- Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Hubbard Kennedy, via fax 979.846.7880 Case file#07-00500099 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and`bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 1 of 6 ..A)) Dfxi qro/ t Rabon A. Metcalf, P.E. /1,'� 01 From: Rabon A. Metcalf, P.E. [rabon@rmengineer.com] Sent: Tuesday, March 11, 2008 2:56 PM • To: 'Hubbard kennady'; 'Fred Patterson'; 'Andy Harris' Cc: 'Lindsay Boyer; 'Adam J. Brumbaugh' Subject: A&M Super Storage- Udated Drawings Attachments: C1.1-Civil Site Plan-031108.pdf; C1.5-Landscape Plan-031108.pdf Gentlemen, Please find attached the revised Civil Site Plan and Landscape Plan which reflect on the various changes that have been requested over the past several weeks. The Landscape Plan also reflects these changes, but also include modifications that Hub worked out with Lindsay. These two drawing will be turned into CoCS for their records. Rabon A. Metcalf, P.E. RME Consulting Engineers 1391 Seamist Lane <77845> P.O. Box 9253 College Station,TX 77842 drosiwe� PH: (979) 690-0329 FX: (979) 690-0329 _Gonsuitin E rnr� ees MB: (979) 219-4174 9 THE ELECTRONIC DATA,CONTENT, INFORMATION,AND/OR DRAWINGS GENERATED,BY RME CONSULTING ENGINEERS(RME), ATTACHED OR CONTAINED IN THIS ELECTRONIC TRANSMITTAL IS CONSIDERED BY RME TO BE CONFIDENTIAL. WHEN ISSUED, IT'S USE IS INTEND SOLELY FOR THE INDIVIDUAL OR ENTITY TO WHICH IT IS ADDRESSED. THIS MATERIAL IS INTENDED FOR USE BY THE RECIPIENT NAMED,ONLY,AND PERMISSION IS NOT GRANTED TO THE RECIPIENT FOR DISTRIBUTION OF THESE DOCUMENTS IN ANY FORM OR FASHION. THE RECIPIENT UNDERSTANDS THAT THIS DATA IS AUTHORIZED"AS IS"WITHOUT ANY WARRANTY AS TO ITS PERFORMANCE,ACCURACY, FREEDOM FROM ERROR,OR AS TO ANY RESULTS GENERATED THROUGH ITS USE. THE RECIPIENT ALSO UNDERSTANDS AND AGREES THAT RME,UPON RELEASE OF SUCH DATA, IS NO LONGER RESPONSIBLE FOR THEIR USE OR MODIFICATION. THE USER AND RECIPIENT OF THE ELECTRONIC DATA ACCEPTS FULL RESPONSIBILITY AND LIABILITY FOR ANY