Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: CARTER'S CROSSING (PP) - 07-00500089 PLANNING 1. Please provide in the General Notes of the Preliminary Plat stating: "In order to comply with the Fire Code and not to exceed 30-lots without two access points the subdivision must be developed and final platted in the following order; Phase 3, Phase 4, Phase 2, and then Phase 1" Reviewed by: Jennifer Reeves Date: May 2, 2007 ENGINEERING COMMENTS NO. 2 2. Please adjust the location of the easement adjacent to North Forest Drive, so that the 20-ft PUE does not encroach the 15-ft Aquila Pipeline Easement. These lots include: Lots 1 thru 5 of Phase 3, Block 9; Lots 6 thru 12 of Phase 3, Block 10; Lots 1 thur 10 of Phase 1, Block 1. 3. It appears there are a few locations where public utilities cross private HOA designated area, please adjust. 4. Please label the easement that is supporting the off site sanitary sewer extension. Reviewed by: Josh Norton Date: May 3, 2007 STAFF REVIEW COMMENTS NO. 1 Project: CARTER'S CROSSING (PP) - 07-00500089 PLANNING 1. Where Appomattox dead ends in Phase two, there will need to be a temporary turn around. 2. (FYI) Phases 2, 3 & 4 exceed the 30-lot requirement for two access points to the subdivision. Please be aware that no more than 30 lots will be allowed without a secondary access. 3. Please label sidewalks on the plat. Sidewalks are required on both sides of the street. Sidewalks will be required on Carters Cove and Ironwood Drive cul-de-sac for pedestrian access. 4. Please provide the zoning for the Northrop Grumman property. 5. Phase 2, Block 5 is reflecting a 15-PUE . This needs to be a 20-foot PUE. 6. Please be aware that no block length can exceed 1200 feet. It appears that Chestnut Oak Circle exceeds this requirement. 7. Please be aware that depending on how this development is built out, emergency vehicle turn a rounds may be required, as no street stub may exceed 100 feet and cannot be adjacent to more than one lot. Reviewed by: Jennifer Reeves Date: April 19, 2007 ENGINEERING COMMENTS NO. 1 1. Please place a 20-ft PUE along all rear lot lines that do not back up to existing 20-ft PUE. This is to include the areas that back up to streets. 2. Please place a 10-ft PUE along the side lot lines of Lots 1 & 5 of Palm Court, as well as Lot 1 of Raintree Drive, adjacent to Appomattox. 3. The off site sanitary sewer extension appears to need additional easement. 4. Please label Aquila Pipeline easement on the eastern portion of the plat. 5. The proposed North Forest ROW dedication is not acceptable as it is encumbered by a gas pipeline and easement and therefore we need surety as city staff has previously discussed with the developer. Per the Subdivision Regulations, when a subdivision embraces a thoroughfare shown on the City's Master Plan the street must be platted. The land that the developer is proposing to dedicate to the City is encumbered by the gas line and easement which renders it unsuitable for the purpose of the thoroughfare extension. We have proposed the escrow as a means of addressing that encumbrance. As long as the roadway remains on the plan the right-of-way dedication is required. The terms are further defined such that if, within 5 years, North Forest Parkway is removed from the City's thoroughfare plan then the City will refund the escrow amount. If, at the end of 5 years, North Forest Parkway is still on the City's thoroughfare plan then the City will use the escrowed funds to re-locate the gas line. 6. The median located in Chestnut Oak Circle does not appear to meet our minimum standard (ie. ROW, pavement width, emergency vehicle turning radius, etc). 7. FYI — Additional easement may be required at time of Final Plat based on construction document detail. 8. FYI — Depending on the phasing of the build out of this development, temporary emergency vehicle turn-around may be required in some locations. 9. Is additional ROW needed at any intersections to avoid fences being built in the site triangles? The City is in the process of transitioning from the existing 20-ft site triangle to AASHTO standards. Reviewed by: Josh Norton Date: April 23, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. If applicable, the following easements will be required: 10' P.U.E along Southwest property line (Block 9, Lots 5-17, Phases 3 and 4) GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: bread@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: April 23, 2007 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: April 17, 2007 ADDRESSING 1. Cypress Lane needs to be renamed. Cypress already exist in College Station Reviewed by: Mandi Alford Date: 4/17/07