April 17, 2007
Jason Schubert, Staff Planner
City of College Station, TX
Re: Doux Chene Apartments Bus Stop Shelters (PIP)
Case File#07-00500081
Mr. Schubert:
Regarding the list of items I received from you, please note the following:
1] Attached is a revised drawing of the location of the water main in relation to the PIP. Field
verification of the location places the main closer to the structure, but still not under it.
2] Gary Doucette of All Phase Construction(820-1870) is performing the construction.
3] Relocation costs are minimal. I estimate labor and materials to move the structure at $275.
4] Cash to cover removal costs: I await your determination of what this amount will be. I'll
be out of town the rest of the week, but will be able to have a check late next week.
Thank you for your time in considering this PIP application.
Regards,
/l
iiit i
Glenn A. Wyant
Business Director
Page 1 of 1
�1 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570/Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
April 16, 2007
TO: Glenn A. Wyant, via waycoolspamcop.net
FROM: Jason Schubert, Staff Planner
SUBJECT: DOUX CHENE BUS STOP SHELTERS (PIP)
Staff reviewed the above-mentioned private improvement in a public right-of-way (PIP)
application as requested. The following is a list of items that need to be submitted prior to
approval:
Location of water main must be field verified. Construction of the structural will
not be allowed over the water main;
Please identify the name and phone number of the contractor performing the
construction;
Provide an estimate of the future relocation of improvements; and
The permitee shall provide cash in a sum sufficient to cover the costs of removal
of its facilities or improvements by the City or any public utility up on terms and in
an amount which is approved by the City Engineer. The amount shall be
submitted to the City Engineer upon approval of the permit but prior to its
issuance and prior to the commencement of construction of any proposed
improvements.
Reviewed by: Josh Norton Date: April 12, 2007
If you have any questions or need additional information, please call me or Josh Norton at
979.764.3570.
pc: Doux Chene Apartments, via live(a7dcapts.com
Case file #07-00500081
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 1 of 2
0
2101 Harvey Mitchell Pkwy.S.
Doux gook College Station,TX 77840
0, . Telephone(979)693-1906
�/ Toll Free(800)375-8268
Che Ii C Fax(979)764-2740
live@dcapts.com
www.dcapts.com
AP AR 1 MEN 1 S
April 17, 2007
Jason Schubert, Staff Planner
City of College Station, TX
Re: Doux Chene Apartments Bus Stop Shelters (PIP)
Case File#07-00500081
•
Mr. Schubert:
Regarding the list of items I received from you,please note the following:
1] Attached is a revised drawing of the location of the water main in relation to the PIP. Field
verification of the location places the main closer to the structure, but still not under it.
2] Gary Doucette of All Phase Construction(820-1870) is performing the construction.
3] Relocation costs are minimal. I estimate labor and materials to move the structure at $275.
4] Cash to cover removal costs: I await your determination of what this amount will be. I'll
be out of town the rest of the week,but will be able to have a check late next week.
Thank you for your time in considering this PIP application.
Regards,
()le/ 4(
47, ;,.
r ,
Glenn A. Wyant
Business Director
Page 1 of 1
1 1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION
MEMORANDUM
April 26, 2007
TO: Glenn A. Wyant, via waycool(a�spamcop.net
FROM: Jason Schubert, Staff Planner
SUBJECT: DOUX CHENE BUS STOP SHELTERS (PIP)
Staff reviewed the revisions for the above-referenced private improvement in a public right-of-
way (PIP) application as requested. The following is a list of items that need to be submitted
prior to approval:
1. Please submit the check for $275.
2. The utility department is not comfortable with the proximity of this structure to the water
main. The proposed location would make it extremely difficult to do any maintenance on
that portion of the water main. Would it be possible to cantilever the structure, as to
avoid the columns closest to the water main?
Reviewed by: Josh Norton Date: April 25, 2007
If you have any questions, please call me or Josh Norton at 979.764.3570.
pc: Doux Chene Apartments, via livedcapts.com
Case file #07-00500081
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 1 of 1
Jason Schubert- Re: Doux Chene Bus St'--'s (PIP) 1
From: "Glenn A. Wyant" <waycool@spamcop.net>
To: "Jason Schubert" <Jschubert@cstx.gov>
Date: 4/27/2007 1:52 pm
Subject: Re: Doux Chene Bus Stops (PIP)
CC: "Josh Norton" <Jnorton@cstx.gov>, <live@dcapts....
Jason-
Please see the attached design modification. In this revision, the
columns nearest the main are set behind the ROW.
Regards,
Glenn Wyant
On Thu, 26 Apr 2007 09:04:20 -0500
"Jason Schubert" <Jschubert@cstx.gov>wrote:
Mr. Wyant,
I have attached the second round of review comments for the above-referenced private improvement in a
public right-of-way(PIP). Let me know if you have any questions.
Jason Schubert
Staff Planner
Planning & Development Services
City of College Station
Phone: 979.764.3570
Fax: 979.764.3496
College Station. Heart of the Research Valley.
Glenn A. Wyant waycool@spamcop.net
Fax (979)776-8482 Mobile (979) 218-7085
Freedom and fear, justice and cruelty, have always been at war.
And we know that God is not neutral between them.
-- George W. Bush --
Jason Schubert- Re: Doux Chene Bus St-ns (PIP) 1
From: Josh Norton
To: Wyant, Glenn A.
Date: 5/3/2007 11:37 am
Subject: Re: Doux Chene Bus Stops (PIP)
CC: Schubert, Jason
Glenn,
Sorry for the delayed response. Please find the below response from the utilities department and attached suggested adjustments
made in red:
Utilities Response:
It is necessary to retain clear area on both sides of buried water and wastewater lines for maintenance and operations purposes.
This clear area is to allow for equipment,tools,safety issues,etc. We are willing to sign the permit to allow the canopy of the bus
stop to encroach into this area. Please adjust your the design of the bus stop to accommodate.
I apologize for not being more specific in the required changes in my original comments. Please let me know if you have any
additional questions.
Thanks-Josh Norton
>>>"Glenn A.Wyant"<waycool(a�spamcop.net>04/27/07 2:49 PM>>>
Jason-
Please see the attached design modification. In this revision,the
columns nearest the main are set behind the ROW.
Regards,
Glenn Wyant
On Thu,26 Apr 2007 09:04:20-0500
"Jason Schubert"<JschubertAcstx.gov>wrote:
Mr.Wyant,
I have attached the second round of review comments for the above-referenced private improvement in a public right-of-way(PIP).
Let me know if you have any questions.
Jason Schubert
Staff Planner
Planning&Development Services
City of College Station
Phone:979.764.3570
Fax:979.764.3496
College Station. Heart of the Research Valley.
Glenn A.Wyant wavcool(a7spamcop.net
Fax(979)776-8482 Mobile(979)218-7085
Freedom and fear,justice and cruelty,have always been at war.
And we know that God is not neutral between them.
--George W. Bush--
Jason Schubert- Re: Doux Chene Bus St—ns (PIP) 1
From: "Glenn A. Wyant" <waycool@spamcop.net>
To: "Josh Norton" <Jnorton@cstx.gov>
Date: 5/4/2007 2:40 am
Subject: Re: Doux Chene Bus Stops (PIP)
CC: "Jason Schubert" <Jschubert@cstx.gov>
Josh:
While I'm not an engineer, it seems to me that putting the full weight
of the canopy onto one vertical support column offset that far from the
center will make the top-heavy structure prone to lean.
Attached is my proposed redesign which should stabilize the structure
while giving 48" clearance from the main. The post closest to the main
would support the weight of the canopy while the second post would
provide counterweight to keep the structure from pulling towards the
canopy load.
Thanks for your consideration. Hopefully this revision will meet the
utilities department's need for clearance while allowing for a stable
structure design.
Regards,
Glenn
On Thu, 03 May 2007 11:37:50 -0500
"Josh Norton" <Jnorton@cstx.gov>wrote:
'Glenn,
'Sorry for the delayed response. Please find the below response from the utilities department and
attached suggested adjustments made in red:
'Utilities Response:
'It is necessary to retain clear area on both sides of buried water and wastewater lines for maintenance
and operations purposes. This clear area is to allow for equipment, tools, safety issues, etc. We are
willing to sign the permit to allow the canopy of the bus stop to encroach into this area. Please adjust your
the design of the bus stop to accommodate.
I apologize for not being more specific in the required changes in my original comments. Please let me
know if you have any additional questions.
Thanks -Josh Norton
>>> "Glenn A. Wyant" <waycool@spamcop.net> 04/27/07 2:49 PM >>>
Jason-
Please see the attached design modification. In this revision, the
columns nearest the main are set behind the ROW.
Regards,
Glenn Wyant
Jason Schubert- Re: Doux Chene Bus S+-^s (PIP) 1
From: Josh Norton
To: Wyant, Glenn A.
Date: 5/8/2007 11:23 am
Subject: Re: Doux Chene Bus Stops (PIP)
CC: Schubert, Jason
Glenn,
I have attached the utility department's latest revision to the bus stop design. Utilities is trying to give you some suggestions of
options that may work for both parties. Ultimately since this bus stop is so close to a water main it is their call as far as allowing
this type of encroachment.
Sorry for the continued confusion on this permit. Let me know if you have any questions. The contact in the utilities department is
Spencer Thompson(764-3656). I probably should have put you in touch with utilities in the first place.
Thanks-Josh Norton
>>>"Glenn A.Wyant"<waycoolspamcop.net>05/04/07 3:37 AM>>>
Josh:
While I'm not an engineer, it seems to me that putting the full weight
of the canopy onto one vertical support column offset that far from the
center will make the top-heavy structure prone to lean.
Attached is my proposed redesign which should stabilize the structure
while giving 48"clearance from the main.The post closest to the main
would support the weight of the canopy while the second post would
provide counterweight to keep the structure from pulling towards the
canopy load.
Thanks for your consideration. Hopefully this revision will meet the
utilities department's need for clearance while allowing for a stable
structure design.
Regards,
Glenn
On Thu,03 May 2007 11:37:50-0500
"Josh Norton"<Jnortoncstx.qov>wrote:
(Glenn,
'Sorry for the delayed response. Please find the below response from the utilities department and attached suggested adjustments
made in red:
Utilities Response:
IIt is necessary to retain clear area on both sides of buried water and wastewater lines for maintenance and operations purposes.
This clear area is to allow for equipment,tools,safety issues,etc. We are willing to sign the permit to allow the canopy of the bus
stop to encroach into this area. Please adjust your the design of the bus stop to accommodate.
I apologize for not being more specific in the required changes in my original comments. Please let me know if you have any
additional questions.
Thanks-Josh Norton
>>>"Glenn A.Wyant"<waycool(cDspamcop.net>04/27/07 2:49 PM>>>
Jason-
Please see the attached design modification. In this revision,the
columns nearest the main are set behind the ROW.
Regards,
Glenn Wyant
Jason Schubert- Re: Doux Chene Bus Str (PIP) 1
4
From: Josh Norton
To: Wyant, Glenn A.
Date: 5/10/2007 5:05 pm
Subject: Re: Doux Chene Bus Stops (PIP)
CC: Schubert, Jason
Glenn,
I just got word from Spencer that the revised design that you faxed over is sufficient. Please submit the latest set of plan and
profile detail for the bus stop and the check as previously requested. If you e-mail me the plans, I can prepare the permit. I will call
you when the permit is ready and you can come by to submit the check and pick up the permit.
Thanks-Josh Norton
Glenn,
I have attached the utility department's latest revision to the bus stop design. Utilities is trying to give you some suggestions of
options that may work for both parties. Ultimately since this bus stop is so close to a water main it is their call as far as allowing
this type of encroachment.
Sorry for the continued confusion on this permit. Let me know if you have any questions. The contact in the utilities department is
Spencer Thompson(764-3656). I probably should have put you in touch with utilities in the first place.
Thanks-Josh Norton
>>>"Glenn A.Wyant"<waycool(c�spamcop.net>05/04/07 3:37 AM>>>
Josh:
While I'm not an engineer,it seems to me that putting the full weight
of the canopy onto one vertical support column offset that far from the
center will make the top-heavy structure prone to lean.
Attached is my proposed redesign which should stabilize the structure
while giving 48"clearance from the main.The post closest to the main
would support the weight of the canopy while the second post would
provide counterweight to keep the structure from pulling towards the
canopy load.
Thanks for your consideration. Hopefully this revision will meet the
utilities department's need for clearance while allowing for a stable
structure design.
Regards,
Glenn
On Thu,03 May 2007 11:37:50-0500
"Josh Norton"<Jnortoncstx.qov>wrote:
'Glenn,
'Sorry for the delayed response. Please find the below response from the utilities department and attached suggested adjustments
made in red:
'Utilities Response:
'It is necessary to retain clear area on both sides of buried water and wastewater lines for maintenance and operations purposes.
This clear area is to allow for equipment,tools,safety issues,etc. We are willing to sign the permit to allow the canopy of the bus
stop to encroach into this area. Please adjust your the design of the bus stop to accommodate.
I apologize for not being more specific in the required changes in my original comments. Please let me know if you have any
additional questions.
Thanks-Josh Norton
>>>"Glenn A.Wyant"<wavcoolspamcop.net>04/27/07 2:49 PM>>>
Jason-