HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: RIVER OAKS BLK 1 LOT 1 & 2 (FP) - 07-00500072 PLANNING 1. Please be aware that the preliminary plat is also under review and any comments for the preliminary plat may also affect the final plat. 2. The lot to be dedicated to the City as a part of Wolf Pen Creek does not need a lot number. 3. We understand that the Wolf Pen Creek park trails will be developed as a part of this project; however, staff is still looking into parkland dedication requirements. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 5. The construction documents and reports are still under review and may affect the plat. Reviewed by: Crissy Hartl Date: April 23, 2007 ENGINEERING COMMENTS NO. 1 1. Dedicate Proposed 20' Sanitary Sewer Easement as a PUE. 2. Please be aware that if sewer mains will be adjacent to building structures, additional PUE width may be required. In addition, construction documents may also show additional PUE is required. 3. Does the floodway lie outside the floodplain as depicted in the western corner? 4. Be aware that no fill is allowed within the floodway without flood study and possible variance. 5. How were the floodplain/floodway limits placed on the Plat? Was actual field survey data used? 6. Indicate BFEs. 7. Water line sizes will be verified with Water Design report provided with the Site Plan. 8. Add note to the Plat indicating who has the maintenance responsibility of the Private Drainage Easements. Reviewed by: Carol Cotter Date: April 23, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights if required). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for each riser pole. City installs riser. 4. Developer to intercept existing conduit at designated transformers or devices and extend as required. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 5. If conduit does not exist at designated transformer or device, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals if required as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: gmartinez@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 04/05/07 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: April 5, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3