HomeMy WebLinkAboutCorrespondence MITCHELL
MM
MORGAN
April, 1, 2007
Bridgett George
City of College Station
PO Box 9960
College Station, TX 77840
Re: River Oaks Subdivision Submittal
Dear Bridgett,
Attached please find the following River Oaks Subdivision Submittal:
• Final Plat Application
• 14 folded copies of the plat.
• Property Tax Certificate
Please let us know if you have any questions.
Sincerely,
Shannon Newman
Administrative Assistant
Cc: Jim Stewart
Matt Brown
File
511 UNIVERSITY DRIVE EAST,SUITE 204• COLLEGE STATION,TX 77840• T. 979.260.6963• F 979.260.3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
info@mitchellandmorgan.com • www.mitchellandmorgan.com
(1,141141111
CITY OF COLLEGE STATION
Pima dig d Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
May 7, 2007
TO: Veronica Morgan,Mitchell&Morgan via fax#979.260.3564
FROM: Crissy Hartl, Staff Planner
SUBJECT: River Oaks Subdivision—Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been addressed
and the following information submitted by Wednesday, May 9, 5:00 p.m., your project will be
placed on the next available Planning and Zoning Commission meeting scheduled for, May 17, 7:00
p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov;and
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have not
been addressed your project will not be scheduled for Planningll hv&io Zoning
nis g e been made and the
ssion meeting.
Your project may be placed on a future agenda
appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and
staff report can be accessed at the following web site on Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Jim Stewart, Owner via fax #979.694.3774
Case file #07-00500072
Home of Texas A&M University
that we can resolve this issue. Is there a concern with referring to the dedication
area as a lot?
Question:
We understand that the Wolf Pen Creek park trails will be developed as a part of
this project; however, staff is still looking into parkland dedication requirements.
Answer:
We will be happy to work with the Parks staff and add amenities to the Wolf Pen
Creek trail system in lieu of our parkland dedication. It is not contemplated that
this development will construct the entire trail system behind this project as that
would be cost prohibitive.
Question:
Please note that any changes made to the plans that have not been requested
by the City of College Station, must be explained in your next transmittal letter
and "bubbled" on your plans. Any additional changes on these plans that the
City has not made aware of will constitute a completely new review.
Answer:
Because the sanitary sewer reroute needed to be realigned this PUE has been
rerouted on the plans to the same alignment. This was necessary to assure that
the buildings in Phase II could sewer to this line. The manhole located to the
east of the property has been confirmed that it is plugged and we cannot utilize it
without rehabilitating the line.
Question:
The construction documents and reports are still under review and may affect the
plat.
Answer:
Understood
ENGINEERING COMMENTS NO. 1
Question:
Dedicate Proposed 20' Sanitary Sewer Easement as a PUE.
Answer:
This has been changed to a PUE on the plat.
Question:
Please be aware that if sewer mains will be adjacent to building structures,
additional PUE width may be required. In addition, construction documents may
also show additional PUE is required.
Answer:
The sewer main will not be adjacent to building structures. Only service lines will
be close to the buildings. We understand that if upon review of the construction
documents additional easement is needed we will be required to provide the
extra width.
Question:
Does the floodway lie outside the floodplain as depicted in the western corner?
Answer:
The floodplain and floodway lines have been revised to reflect the current LOMR
pending with FEMA for this stretch of creek. This newer study fixes the problem
with the floodway vs. floodplain line.
Question:
Be aware that no fill is allowed within the floodway without flood study and
possible variance.
Answer:
Understood. We do NOT intend to fill any floodway
Question:
How were the floodplain/floodway limits placed on the Plat? Was actual field
survey data used?
Answer:
The floodplain/floodway limits were placed on the plat using the boundary and its
relationship to the Meridian Apartments LOMR (Case No. 07-06-0545P). The
floodplain limits shown were based upon aerial topography. If staff agrees that
this LOMR case should be the floodplain shown we will topo rectify it on this plat.
Question:
Indicate BFE's
Answer:
Base flood elevations have been added to the revised plat.
Question:
Water line sizes will be verified with Water Design report provided with the Site
Plan.
Answer:
Acknowledged
Question:
Add note to the Plat indicating who has the maintenance responsibility of the
Private Drainage Easements.
Answer:
This note has been added to the plat. See General Note No. 5.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
Question:
Developer provides temporary blanket easement for construction purposes.
Answer:
Acknowledged
Question:
Developer provides easements for electric infrastructure as installed for electric
lines (including street lights).
Answer:
Acknowledged
GENERAL ELECTRICAL COMMENTS
Question:
Developer installs all conduit per City specs and design.
Answer:
Acknowledged
Question:
City will provide drawings for conduit installation.
Answer:
Acknowledged
Question:
Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
Answer:
Acknowledged
Question:
Developer to intercept existing conduit at designated transformers or devices and
extend as required.
Answer:
Acknowledged
Question:
If conduit does not exist at designated transformer or device, developer to furnish
and install conduit as shown on electrical layout.
Answer:
Acknowledged
Question:
Developer pours transformer or device pad(s) per City specs and design.
Answer:
Acknowledged
Question:
Developer installs pull boxes and secondary pedestals as per City specs and
design (pull boxes and secondary pedestals provided by the City).
Answer:
Acknowledged
Question:
Developer provides digital AutoCAD 2000 or later version of plat and/or site plan.
Email to: gmartinezcstx.gov.
Answer:
The site plan has been sent to the City of College Station Electrical Department.
Question:
Developer provides load data for project as soon as it becomes available so that
transformers can be accurately sized and ordered.
Answer:
Load data has been provided to the City 's Electrical Department.
Question:
To discuss any of the above electrical comments please contact Gilbert Martinez
at 979.764.6255.
Answer:
Thank you!
SANITATION COMMENTS
Question:
Sanitation is ok with this project.
Answer:
OK
'lease let us know if you have any questions.
Y
ncerel ,
11
Veronica .n. Mrg�n, P.E., C.F.M.
Managing Partn�
Cc. File
Jim Stewart
Matt Brown
George LaBeau
1101 Texas Avenue, P.O. Box 9960
CITY OF COLLEGE STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
April 23, 2007
TO: Veronica Morgan, Mitchell & Morgan via 979.260.3564
FROM: Crissy Hartl, Staff Planner
SUBJECT: RIVER OAKS BLK 1 LOT 1 & 2 (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, April 30, 10:00 a.m., your project
will be placed on the next available Planning and Zoning Commission meeting scheduled for,
May 17, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2) 24"x36" copies of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Jim Stewart, Owner via fax # 979.694.3774
Case file #07-00500072
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 1 of 3
TRANSMISSION VERIFICATION REPORT
TIME : 04/24/2007 17: 08
NAME .
FAX .
TEL .
SER. # : 000L5J586800
DATE,TIME 04/24 17:08
FAX NO. /NAME 92603564
DURATION 00:00: 39
PAGE(S) 03
RESULT OK
MODE STANDARD
ECM
(*(0,4511114 1101 Texas Avenue, P.O. Box 9960
Caxx or COLLEGE'STATION College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
April 23, 2007
TO: Veronica Morgan, Mitchell & Morgan via 979.260.3564
FROM: Crissy Hartl, Staff Planner
SUBJECT: RIVER OAKS BLK 1 LOT 1 & 2 (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, April 30, 10:00 a.m., your project
will be placed on the next available Planning and Zoning Commission meeting scheduled for,
May 17, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2) 24"x36" copies of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh a?cstx_gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
c
TRANSMISSION VERIFICATION REPORT
TIME : 64/24/2687 17: 10
NAME :
FAX .
TEL .
SER. # : 000L5J596800
DATE,TIME 04/24 17: 09
FAX NO./NAME 96943774
DURATION 00:00: 30
PAGE(S) 03
RESULT OK
MODE STANDARD
ECM
CAkff" 1101 Texas Avenue, P.O. Box 9960
CITY OF Cox z sc STATION Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
April 23, 2007
TO: Veronica Morgan, Mitchell & Morgan via 979.260.3564
FROM: Crissy Hartl, Staff Planner
SUBJECT: RIVER OAKS RLK 1 LOT 1 & 2 (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Monday, April 30, 10:00 a.m., your project
will be placed on the next available Planning and Zoning Commission meeting scheduled for,
May 17, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue.
Two (2)24"x36" copies of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov and awelsh@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
(*rig- 11141
CITY OF COLLEGE STATION
Planning d Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
April 9, 2007
TO: Mitchell & Morgan, LLP via fax# 979.260.3564
FROM: Crissy Hartl, Staff Planner
SUBJECT: RIVER OAKS BLK 1 LOT 1 & 2 (FP) - Final Plat
Staff reviewed the above-mentioned final plat application and determined it to be incomplete.
The following is a preliminary list of items needed to complete the submittal and conduct a
thorough review. Please submit the following information in order to make this a complete
application:
Preliminary plat application and all required documents
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: Jim Stewart, Owner via fax # 979.694.3774
Case file # 07-500072
TRANSMISSION VERIFICATION REPORT
TIME : 04/09/2007 15: 42
NAME .
FAX .
TEL .
SER. # : 000L5J596800
DATE,TIME 04/09 15:42
FAX NO. /NAME 92603564
DURATION 00:00:15
PAGE(S) 01
RESULT OK
MODE STANDARD
ECM
T;fgAE �- CITY OF COLT TGESTATION i� ry l
Mousinga Developn:est S�� :.,f,r.EGt;?E
7;llS;tl76TtM�t;:yt�)i.^.ir��ii".
...:,-•:.w.m<...... n nntt•,,,_naI,RTIiR:
..,i.ria.......... t._.._._.__....................._.i......,,...._...tr„ee.r.t:Yt.Z 1.
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979-764,3570 / Fax 979.764.3496
MEMORANDUM
April 9. 2007
TO: Mitchell & Morgan, LLP via fax #979.260.3564
FROM: Crissy Hart!, Staff Planner
SUBJECT: RIVER OAKS BLK 1 LOT 1 & 2 (FP) - Final Plat
Staff reviewed the above-mentioned final plat application and determined it to be incomplete.
The following is a preliminary list of items needed to complete the submittal and conduct a
thorough review. Please submit the following information in order to make this a complete
application:
Preliminary plat application and all required documents
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
TRANSMISSION VERIFICATION REPORT
TIME : 04/09/2007 15: 43
NAME .
FAX .
TEL .
SER. # : 000L5J596800
DATE,TIME 04/09 15: 43
FAX NO. /NAME 96943774
DURATION 00: 00: 13
PAGE{S) 01
RESULT OK
MODE STANDARD
ECM
(*Ir111114
�r;. i":;•:rr.-
°i
�
C 7X F COLLEGE STATIO R:.
Minn' Fla a8U t Services
,q,9liria
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.35701 Fax 979-764.3496
MEMORANDUM
•
April 9, 2007
TO: Mitchell & Morgan, LLP via fax# 979-260.3564
FROM: Crissy Hartl, Staff Planner
SUBJECT: RIVER OAKS BLK 1 LOT 1 & 2 (FP) - Final Plat
Staff reviewed the above-mentioned final plat application and determined it to be incomplete_
The following is a preliminary list of items needed to complete the submittal and conduct a
thorough review. Please submit the following information in order to make this a complete
application:
Preliminary plat application and all required documents
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
01- 13
•
MITCHELL
IV��II
/-1 j r1
MORGAN 07-0
April 30, 2007
Carol Cotter
City of College Station
Development Services
PO Box 9960
College Station, TX 77842
Re: REVISED - River Oaks Sanitary Sewer Relocation Plans and Oversize
Participation
Dear Carol,
Attached please find two revised sets of construction plans for the River Oaks 15" Sanitary
Sewer Relocation Project. This project is located on the River Oaks Townhomes property.
This work is not plat related but site plan related, therefore it was not submitted with our
final plat. We would like to obtain approved plans in order to commence construction on
this sewer line prior to site plan approval. This is in order to complete construction prior to
asking for building permits for units to be constructed over the old sanitary sewer. The
revision on this line is that we moved the sewer line closer to the Phase 11 units up near
Holleman Drive. This was in order to achieve flowlines to sewer them. We had planned on
taking these units to an existing manhole to the east within Wolf Pen Creek Park but have
since found that this line is plugged.
In discussions with Spencer Thompson, he has requested that we replace all of the old 15"
clay tile line through our property and across Holleman. He has agreed to request oversize
participation for the work which would not have been required as part of our site plan
project. Because of this I have included an extra plan set as well as an oversize participation
cost estimate for Spencer as well. He and I are working on the necessary agreements to be
forwarded to City Council for approval of the oversize participation request prior to our
constructing this line.
ank you for your help with this project. If you have any questions please call.
cerely
414
eronica J.B. �org; , 7E., C.F.M.
Managing Partner
Attachment(s)
Cc. File
Jim Stewart
Matt Brown
George LaBeau
Spencer Thompson, City of College Station
511 UNIVERSITY DRIVE EAST,SUITE 204 • COLLEGE STATION,TX 77840• T 979.260.6963 • F 979.260.3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
info@mitchellandmorgan.com • www.mitchellandmorgan.com
C t)l.TA
MITCHELL s" '
MM ql
MORGAN qi
April 22, 2007
Carol Cotter
City of College Station
Development Services
PO Box 9960
College Station, TX 77842
Re: River Oaks Sanitary Sewer Relocation Plans and Oversize Participation
Dear Carol,
Attached please find two sets of construction plans for the River Oaks 15" Sanitary
Sewer Relocation Project. This project is located on the River Oaks Townhomes
property. This work is not plat related but site plan related, therefore it was not
submitted with our final plat. We would like to obtain approved plans in order to
commence construction on this sewer line prior to site plan approval. This is in
order to complete construction prior to asking for building permits for units to be
constructed over the old sanitary sewer.
In discussions with Spencer Thompson, he has requested that we replace all of the
old 15" clay tile line through our property and across Holleman. He has agreed to
request oversize participation for the work which would not have been required as
part of our site plan project. Because of this I have included an extra plan set as
well as an oversize participation cost estimate for Spencer as well. He and I are
working on the necessary agreements to be forwarded to City Council for approval
of the oversize participation request prior to our constructing this line.
'. ank you for your help with this project. If you have any questions please call.
Y cerely,
Veronica J.Br ore,:n, C.E., C.F.M.
Managing Partner
Attachment(s)
Cc. File
Jim Stewart
Matt Brown
George LaBeau
Spencer Thompson, City of College Station
511 UNIVERSITY DRIVE EAST,SUITE 204• COLLEGE STATION,TX 77840• T 979.260.6963• F 979.260.3564