Loading...
HomeMy WebLinkAboutStaff Review 4109 STAFF REVIEW COMMENTS NO. 2 Project: EDELWEISS GARTENS PH 10, 11 &13 (PP) - 07-00500069 PLANNING 1. No comment. Reviewed by: Jennifer Reeves Date: April 18, 2007 ENGINEERING COMMENTS NO. 2 2. Please illustrate the 24-in water main adjacent to SH 40. Reviewed by: Josh Norton Date: April 23, 2007 STAFF REVIEW COMMENTS NO. 1 Project: EDELWEISS GARTENS PH 10, 11 &13 (PP) - 07-00500069 PLANNING 1. The metes and bounds do not close. (Per Adrian Welsh GIS Technician -764.3570) 2. If Phase 13-B is not platted with another phase, it may result in an unplatted remainder parcel less than the 5 acres, which is not permitted in the City of College Station. This also would not meet the City's requirement where each phase must be able to stand alone to meet ordinance requirements and infrastructure costs should be distributed evenly throughout the subdivision. 3. Dennis Herd is no longer the property owner of the abutting parcel of Phase 13-B. Please reflect the current property owner's information on the plat (Steven and Sharon Brock). 4. At the intersection of Hofburg Drive and Lambermont Drive the street needs to meet the minimum right-of-way and pavement widths without encumbering an off-site property owner or include the adjacent property as part of the preliminary plat. Reviewed by: Jennifer Reeves Date: April 9, 2007 ENGINEERING COMMENTS NO. 1 1. FYI — Additional easement may be required at time of Final Plat/Construction Documents in areas where multiple utilities are located. 2. FYI — Main termination points may need to be adjusted at time of construction documents to avoid connections under pavement and extra long services. 3. FYI — Depending on the phasing of the build out of this development, temporary emergency vehicle turn-around may be required in some locations. 4. Please allow for the extension of the sanitary sewer main to the undeveloped properties to the south and east? 5. Is additional ROW needed at any intersections to avoid fences being built in the site triangles? The City is in the process of transitioning from the existing 20-ft site triangle to AASHTO standards. Reviewed by: Josh Norton Date: April 9, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. If applicable, the following easements will be required: GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: gmartinez@cstx.gov / sweido@cstx.gov/ bread@cstx.gov /tmichals@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255, Sam Weido at 979.764.6314, Brent Read at 979.764.5026, or Tony Michalsky at 979.764.3438. Reviewed by: Gilbert Martinez / Sam Weido / Brent Read /Tony Michalsky Date: April 5, 2007 SANITATION 1. Need to show a temporary turn-around at the east end of Tenneville Dr. Reviewed by: Wally Urrutia Date: April 5, 2007 FIRE 1. No comments Reviewed by: Steve Smith Date: April 3, 2007