HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: ENCLAVE APARTMENTS (SP) — 07-00500066 PLANNING 1. As shown, due to the removal of parking, this site is now deficient in the number of required spaces. Because the deficiency is less than 10% of the required number, a variance may be considered through an Administrative Adjustment. Please submit an Administrative Adjustment application for review. 2. It appears that a number of the dumpster screens will be located in existing utility easements. As per UDO Section 7.7.C.1, if so located, the property owners are warned that they are responsible for the replacement of the screens if they are removed for utility construction and/or maintenance. Provide a note on the site plan acknowledging this responsibility. 3. As per UDO Section 7.2.D, end islands must be at least 180 square feet in area. Most of the islands provided are not more than 9' x 18' and are therefore deficient. In most instances, it appears the new island can be expanded since they are only covering part of an existing space. 4. Full end islands are required at each end of the dumpster screen for Location D as well as the end of parking row just north of the location. 5. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Reviewed by: Jason Schubert Date: April 2, 2007 ENGINEERING COMMENTS NO. 1 1. Show all PUEs and public utility lines on the Site Plan. Reviewed by: Carol Cotter Date: April 2, 2007 SANITATION 1. Most proposed dumpster enclosure angles will not work for sanitation collection vehicles. 2. Contractor can contact Rodney Harris or Wally Urrutia for further information. Reviewed by: Wally Urrutia / Rodney Harris Date: April 2, 2007 FIRE 1. No comments at this time Reviewed by: Eric Dotson Date: March 27, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. If applicable, the following easements will be required: 4. If any CSU underground or overhead facility needs to be relocated to accommodate any future addition or building, CSU will relocate those facilities at the expense of the owner/agent requesting the relocation. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: wdaviscstx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Weldon Davis at 979.764.5027. Reviewed by: Weldon Davis Date: March 27, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 STAFF REVIEW COMMENTS NO. 2 Project: ENCLAVE APARTMENTS DUMPSTER ADDITION (SP) - 07-00500066 PLANNING 1. No further comments. 2. FYI, please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of, will constitute a completely new review. Reviewed by: Jason Schubert Date: April 20, 2007 ENGINEERING COMMENTS NO. 2 1. Shift dumpsters and enclosures as far away from water lines as possible. This effects Locations B, D, G and I. Reviewed by: Carol Cotter Date: April 23, 2007