CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Date Sampled: June 29,2009
No.of Sets Cast: 1 of I
Sample Represents: Curb&Gutter along Victoria Avenue at Station 4+50,Right of Centerline
Required Compressive Strength at 28 Days,(psi): 3,500
LABORATORY TEST DATA
Sample Date Age Cross-sectional Maximum Compressive
Identification No. Tested (Days) Area(in2.) Load(lbf.) Strength(psi.)
VAIE 01 07/06/09 7 12.57 64,845 5,160
VALE 02 07/27/09 28 12.57 79,915 6,360
VAIE 03 07/27/09 28 12.57 77,955 6,200
VAIE 04 ---- Reserve 12.57
Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance
with the following applicable ASTM methods: C 31,C 39,C 138,C 143,C 231,&C 1064.
FIELD TEST DATA
Supplier: Brazos Valley Services Time Batched: 1:56 PM Air Content,(%): 4.3
Truck No.: 36 Time Sampled: 2:43 PM Unit Weight,(pcf): ND
Ticket No.: 1457 Concrete Temp,(°F): 88 Sample Type: Cylinder
Mix No.: 3/8 Gravel Ambient Temp,(°F): 93 Sample Size: 4 in.dia.
Accumulated Yards: 10 Slump(in.): 1.25 Water Added on Site,(gal): 10
Weather: Partly Cloudy
Field Contact: Mr. Keith Tinker(City of College Station)was informed of field test results.
Remarks: ND—Not Determined;NP—Not Provided;NA—Not Applicable
Copies To: Mr.Josh Norton,City of College Station
Mr.Ricky Palasota, Sr.,Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering,Inc.
CME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.KeithTinker Report Date: 8/6/09
City of College Station Project No.: 29073
P.O.Box 9960 Report No.: 7
College Station,Texas 77842
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION;REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
CRUSHED LIMESTONE BASE SAMPLE
Date: 8/4/09 Arrival Time: 7:50 AM Requested By: Mr.Keith Tinker,City of College Station
Sample Obtained By: Kyle Rosenbaum Time Charge: 1.0 Hour No.of Samples Collected: 1
Sample No.: 1 of 1 Lab No.: 676
Location Sample was Obtained from: Victoria Avenue at Station 3+50,4'Right of Centerline(Windrow)
Gradation Results of Flexible Base Material
COMMENT
(U.SSStA Standard Size) PERCENT RETAINED,(%)EVE SIZE ' B/CS Unified Specification No.320 t OR REMARK
13�" 0 0 Meets Requirements.
7/8" 25 10-35 Meets Requirements.
3/8" 49 30-50 Meets Requirements.
No.4 62 45-65 Meets Requirements.
No.40 80 70-85 Meets Requirements.
Summary of Classification Tests for Flexible Base Material
Classification or TXDOT Measured B/CS Unified Specification No.320 COMMENT
P
Material Test Test Results Result OR REMARK
Liquid Limit: TEX-104-E 21 Maximum 35 Meets Requirements.
Plastic Limit: TEX-105-E 15 N/A ----
Plasticity Index: TEX-106-E 6 Maximum 10 Meets Requirements.
Sample meets project specifications.
Comments: (See Report No.7-A for Proctor Curve)
Note;
1. Test method used conformed to Texas Deptuiment of Trnnspoitation,Test Method Ter-I/0-E
CME TESTING AND ENGINEERING INC.
Victoria Avenue&Infrastructure Extension;Reatta Meadows,Section 1,Phase 2;College Station,Texas
Report No.7—Laboratory Test Results
August 6,2009
Copies To: Mr.Josh Norton,City of College Station
Mr.Ricky Palasota,Sr.,Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering,Inc.
2
COMPACTION TEST REPORT
132.0
129.5
1 - - II Vilik
27.0 -
Q —
c
a;
124.5
I ilL
�_ ..._... ■ 1
Will
122.0
-- ---- _. _._ - ZAV for
Sp.G. _
119.5 1 2.75
4 6 8 10 12 14 16
Water content, %
Test specification: ASTM D 1557-07 Method C Modified
Eiev/ Classification Nat. %> %<
Depth USCS AASHTO Moist. Sp.G. LL PI 3/4 in. No.200
Windrow 21 6
TEST RESULTS MATERIAL DESCRIPTION
Maximum dry density= 129.8 pcf
Tan Crushed Limestone
Optimum moisture= 10.3 %
Project No. 29073 Client: JLM DEVELOPMENT GROUP II,LLC Remarks:
Project: VICTORIA AVENUE&INFRASTRUCTURE EXTENSION;REATTA Date Sampled:08/04/09
MEADOWS,SECT. 1,PM-COLLEGE STATION,TEXAS
• Location: Victoria Avenue at Station 3+50,4'Right of Centerline Lab No.676
CME Testing and Engineering, Inc.
College Station, Texas Report No. 7-A
CME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr. KeithTinker Report Date: 8/4/09
City of College Station Project No.: 29073
P.O.Box 9960 Report No.: 8
College Station,Texas 77842
PROJECT: VICTORIA AVENUE &INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION I,PHASE 2; COLLEGE STATION,TEXAS
FIELD DENSITY TESTS & BACKFILL SOIL SAMPLE REPORT
Date: 8/4/09 Arrival Time: 10:30 AM Time Charge: 2.0 Hours Technician: Anthony Muzny
Requested By: Mr.Alfonso Guillen,Brazos Valley Services
FIELD DENSITY TESTS
Proctor Maximum Dry Optimum Material Moisture Compaction
Reference Density,pef Moisture,% Test Method Description Specification Specification
1 104.6 18.9 ASTM D 698 Method A Gray Sandy Lean Clay Opt. to+4% 98%
2 93.5 24.9 ASTM D 698 Method A Brown&Tan Clayey Sand Opt. to+4% 98%
FIELD MOISTURE&DENSITY TEST RESULTS
Location of Proctor Test Thy Moisture Moisture Comp- Pass/
In-Place Test Reference Depth, in. Density,pcf Content,% Difference ' action,% Fail
BACKFILL FOR WATER LINE'WA-1'
Station 1+00, At Existing 2 6 90.7 23.5 -1.4 97 Fail
Ground Surface
Station 1+05, 1'Below 2 6 91.1 22.7 -2.2 97 Fail
Existing Gound Surface
Station 2+00,At Existing 2 6 79.4 23.3 -1.6 85 Fail
Ground Surface
Station 2+05, I'Below 2 6 62.6 31.5 6.6 67 Fail
Existing Gound Surface
Station 3+00,At Existing 2 6 87.8 24.6 -0.3 94 Fail
Ground Surface
Station 3+05, I'Below 2 6 73.8 28.5 3.6 79 Fail
Existing Gound Surface
Station 4+00,At Existing 1 6 84.0 17.9 -1.0 80 Fail
Ground Surface
Station 4+05, 1'Below 1 6 90.6 19.9 1.0 87 Fail
Existing Gound Surface
CME TESTING AND ENGINEERING INC.
Victoria Avenue&Infrastructure Extension;
Reatta Meadows,Section I,Phase 2;College Station,Texas
Report No.8—Field Moisture-Densities and Laboratory Test Results
August 4,2009
FIELD MOISTURE&DENSITY TEST RESULTS(CONTINUED)
Location of Proctor Test Dry Moisture Moisture Comp- Pass/
In-Place Test Reference Depth, in. Density,pcf Content,% Difference' action,% Fail
BACKFILL FOR WATER LINE'WA-1'
Station 5+00,At Existing 2 6 83.2 23.0 -1.9 89 Fail
Ground Surface
Station 5+05, 1'Below 2 6 68.0 31.1 6.2 73 Fail
Existing Gound Surface
Notes: 1.Difference with respect to the optimum moisture content.
General Notes: Some information on this test report provided by others. Testing and reporting was conducted in general
accordance with the following applicable ASTM methods: D 2922 and D 3017.
Remarks: Mr.Alfonso Guillen(Brazos Valley Services)was informed of field test results.
•
•
2
CME TESTING AND ENGINEERING INC.
Victoria Avenue&Infrastructure Extension;Reatta Meadows,Section 1,Phase 2;College Station,Texas
Report No.8—Field Moisture-Densities and Laboratory Test Results
August 4,2009
BACKFILL SOIL SAMPLE
Sample No.: 1 of 1 Lab No.: 678
Water Line"WA-1"at Station 2+05.The sample represents soils excavated from the
Location Sample was Obtained from: existing ground surface.to a depth of approximately 1 ft.below the existing ground
surface at this location.
ounnents' „ See Report No.8-A for Proctor Curve.
Copies To, Mr.Josh Norton,City of College Station
Mr.Ricky Palasota,Sr.,Brazos Valley Services
Mr.Joe Gattis, P.E.,Gattis Engineering
CME Testing and Engineering,Inc.
3
COMPACTION TEST REPORT
97
95
93
U)
ZAV for
Sp.G.
2.70
91
89
87
19 21 23 25 27 29 31
Water content, %
Test specification: ASTM D 698-07eI Method A Standard
Elev/ Classification Nat. %> %<
Depth USCS AASHTO Moist. Sp.G. LL PI No.4 No.200
0 to 12" CH 60 40 73.0
13.E.G.S.
TEST RESULTS MATERIAL DESCRIPTION
Maximum thy density=94.9 pef Brown&Gray Fat Clay with Sand
Optimum moisture=25.7%
Project No. 29073 Client: JLM DEVELOPMENT GROUP II,LLC Remarks:
Project: VICTORIA AVENUE&INFRASTRUCTURE EXTENSION;REATTA Date Sampled:8/4/09
MEADOWS,SECT. I,PH.2-COLLEGE STATION,TEXAS
• Location: Water Line'WA-1'at Station 2+05 Lab No.678
CME Testing and Engineering, Inc.
College Station, Texas Report No. 8-A
CME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.KeithTinker Report Date: 8/7/09
City of College Station Project No.: 29073
P.O.Box 9960 Report No.: 9
College Station,Texas 77842
PROJECT: VICTORIA AVENUE& INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
FIELD DENSITY TESTS REPORT
Date: 8/7/09 Arrival Time: 4:25 PM Time Charge: 1.0 Hour Technician: Jerry Ellis
Requested By: Mr.Alfonso Guillen,Brazos Valley Services
Proctor Maximum Dry Optimum Material Moisture Compaction
Reference Density,pcf Moisture,% Test Method Description Specification Specification ,
1 129.8 10.3 ASTMD 1557 Method C Tan Crushed Limestone Opt. to+4% 95%
FIELD MOISTURE&DENSITY TEST RESULTS
Location of Proctor Test Dry Moisture Moisture Comp- Pass/
In-Place Test Reference Depth,in. Density,pcf Content,% Difference 1 action,% Fail
BASE FOR VICTORIA AVENUE
Station 0+50,12'Right of 1 6 126.2 10.6 0.3 97 Pass
Centerline
Station 2+50,10'Left of 1 6 125.0 9.5 -0.8 96 Fail
Centerline
Station 4+50,8'Right of 1 6 126.1 10.4 0.1 97 Pass
Centerline
Notes: 1.Difference with respect to the optimum moisture content.
General Notes: Some information on this test report provided by others. Testing and reporting was conducted in general
accordance with the following applicable ASTM methods: D 2922 and D 3017.
Remarks: Mr.Francisco Herrera(Brazos Valley Services)was informed of field test results.
Copies To: Mr.Josh Norton,City of College Station
Mr. Ricky Palasota,Sr.,Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering,Inc.
CME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.KeithTinker Report Date: 8/8/09
City of College Station Project No.: 29073
P.O.Box 9960 Report No.: 10
College Station,Texas 77842
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
FIELD DENSITY TESTS REPORT
Date: 8/8/09 Arrival Time: 11:30 AM Time Charge: 1.0 Hour Technician: Jeny Ellis
Requested By: Mr.Alfonso Guillen,Brazos Valley Services
Proctor Maximum Dry Optimum Material Moisture Compaction
Reference Density,pcf Moisture,% Test Method Description Specification Specification
1 129.8 10.3 ASTM D 1557 Method C Tan Crushed Limestone Opt. to+4% 95%
FIELD MOISTURE&DENSITY TEST RESULTS
Location of Proctor Test Dry Moisture Moisture Comp- Pass/
In-Place Test Reference Depth,in. Density,pcf Content,% Difference I action,% Fail
BASE FOR VICTORIA AVENUE
Station 2+50, 10'Left of 1 6 129.1 10.5 0.2 99 Pass
Centerline (Retest)
Notes: 1.Difference with respect to the optimum moisture content.
General Notes: Some information on this test report provided by others. Testing and reporting was conducted in general
accordance with the following applicable ASTM methods: D 2922 and D 3017.
Remarks: Mr.Daniel Bareto(Brazos Valley Services)was informed of field test results.
Copies To: Mr.Josh Norton,City of College Station
Mr.Ricky Palasota,Sr.,Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering,Inc.
CME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.KeithTinker Report Date: 8/11/09
City of College Station Project No.: 29073
P.O.Box 9960 Report No.: 1 I
College Station,Texas 77842
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
•
FIELD DENSITY TESTS REPORT
Date: 8/11/09 Arrival Time: 11:00 AM Time Charge: 1.5 Hours Technician: Jerry Ellis
Requested By: Mr.Alfonso Guillen,Brazos Valley Services
Proctor Maximum Dry Optimum Material Moisture Compaction
Reference Density,pcf Moisture,% Test Method Description Specification Specification
1 104.6 18.9 ASTM D 698 Method A Gray Sandy Lean Clay Opt. to+4% 98%
2 93.5 24.9 ASTM D 698 Method A Brown&Tan Clayey Sand Opt. to+4% 98%
FIELD MOISTURE&DENSITY TEST RESULTS
Location of Proctor Test Dry Moisture Moisture Comp- Pass/
In-Place Test Reference Depth,in. Density,pcf Content,% Difference r action,% Fail
BACKFILL FOR WATER LINE'WA-1'
Station 1+00,At Existing 2 6 95.6 25.1 0.2 102 Pass
Ground Surface(Retest)
Station 2+00,At Existing 2 6 85.6 25.9 1.0 92 Fail
Ground Surface(Retest)
Station 3+00,At Existing 2 6 85.9 27.4 2.5 92 Fail
Ground Surface(Retest)
Station 4+00,At Existing 1 6 102.7 19.1 0.2 98 Pass
Ground Surface(Retest)
Station 5+00,At Existing 2 6 93.5 25.0 0.1 100 Pass
Ground Surface(Retest)
Notes: 1.Difference with respect to the optimum moisture content.
General Notes: Some information on this test report provided by others. Testing and reporting was conducted in general
accordance with the following applicable ASTM methods: D 2922 and D 3017.
GME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr. KeithTinker Report Date: 8/11/09
City of College Station Project No.: 29073
P.O.Box 9960 Report No.: 12
College Station,Texas 77842
PROJECT: VICTORIA AVENUE &INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
FIELD DENSITY TESTS REPORT
Date: 8/11/09 Arrival Time: 4:20 PM Time Charge: 1.0 Hour Technician: Jerry Ellis
Requested By: Mr,Alfonso Guillen,Brazos Valley Services
Proctor Maximum Dry Optimum Material Moisture Compaction
Reference Density,pcf Moisture,% Test Method Description Specification Specification
1 93.5 24.9 ASTM D 698 Method A Brown&Tan Clayey Sand Opt. to+4% 98%
FIELD MOISTURE&DENSITY TEST RESULTS
Location of Proctor Test Dry Moisture Moisture Comp- Pass/
In-Place Test Reference Depth, in. Density,pcf Content,% Difference ' action,% Fail
BACKFILL FOR WATER LINE'WA-I'
Station 2+00, At Existing I 6 91.8 25.1 0.2 98 Pass
G round Surface(Retest)
Station 3+00,At Existing 1 6 93.7 25.5 0.6 100 Pass
Ground Surface(Retest)
Notes: 1.Difference with respect to the optimum moisture content.
General Notes: Some information on this test report provided by others. Testing and reporting was conducted in general
accordance with the following applicable ASTM methods: D 2922 and D 3017.
Remarks: Mr.Alfonso Guillen(Brazos Valley Services)was informed of field test results.
Copies To: Mr.Josh Norton,City of College Station
Mr.Ricky Palasota, Sr.,Brazos Valley Services
Mr.Joe Gattis, P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
CME Testing and Engineering, Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr. KeithTinker Report Date: 8/12/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 13
College Station,Texas 77842
PROJECT: VICTORIA AVENUE& INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
BASE DEPTH CHECKS REPORT
Date: 8/12/09 Arrival Time: 2:45 PM Time Charge: 1.0 Hour Technician: Anthony Muzny
Requested By: Mr.Alfonso Guillen,Brazos Valley Services
VICTORIA AVENUE BASE DEPTH,(IN.)
Station 0+50, 12' Right of Centerline 7
Station 2+50, 10'Left of Centerline 8 '/2
Station 4+50,8'Right of Centerline 8
Remarks: Mr.Alfonso Guillen(Brazos Valley Services)was informed of field test results.
Copies To: Mr.Josh Norton,City of College Station
Mr.Ricky Palasota, Sr.,Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering,Inc.
CME Testing aml Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax (979)690-3668
Client: Mr. KeithTinker Report Date: 8/24/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 14
College Station,Texas 77842
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1, PHASE 2; COLLEGE STATION,TEXAS
Thursday,August 20,2009
At the request of Mr. Keith Tinker of the City of College Station, Mr, Kyle Rosenbaum of CME Testing and Engineering, Inc.
(CME) traveled to the project site referred to as "Victoria Avenue & Infrastructure Extension; Reatta Meadows, Section 1,
Phase 2" in College Station, Texas. Mr. Rosenbaum arrived on site at 10:30 a.m. on Thursday, August 20, 2009 to obtain a
bulk sample of hot mix asphaltic concrete (HMAC) for laboratory analysis. The sample obtained by Mr. Rosenbaum
represents the Type "D" IIMAC placed for Victoria Avenue at Station 5+00, 10' right of centerline. The results of the
laboratory analysis are presented in Table I and in the attached Table H.
Time Charge: Kyle Rosenbaum- 1.5 1-lours
HOT MIX ASPHALTIC CONCRETE TEST REPORT
Represents: Victoria Avenue at Station 5+00, 10' Right of Centerline
Date Sampled: 7/20/09
Time Sampled: 11:20 AM
Supplier: Brazos Valley Services
Sample Location: Hopper of Laydown Machine
Field Temp.of Sample (°F): 320
TABLE I. SIEVE ANALYSIS (GRADATION) OF HMAC AGGREGATE
Lab No. 727 Job-Mix Formula B/CS Unified Specification No. 330
Individual Total L►dividual Total Ind. Tolerances for Individual
Sieve Size %Retained %Passing %Retained %Passing Diff. %Retained
1/2" 0.3 99.7 0.1 99.9 0.2 Plus or Minus 5
3/8" 10.0 89.7 8.9 91.0 1.1 Plus or Minus 5
No.4 26.5 63.2 28.0 63.0 -1.5 Plus or Minus 5
No. 10 24.6 38.6 26.0 37.0 -1.4 Plus or Minus 5
No.40 21.4 17.2 21.0 16.0 0.4 Plus or Minus 3
No. 80 7.9 9.3 9.0 7.0 -1.1 Plus or Minus 3
No. 200 3.7 5.6 4.0 3.0 -0.3 Plus or Minus 3
r—
CME TESTING ANb ENGINEERING INC.
Victoria Avenue&Infrastructure Extension;Reatta Meadows,Section I,Phase 2;College Station,Texas
Report No. 14—L.aboratoiy Test Results
August 24,2009
TABLE II. HMAC MATERIAL PROPERTIES RESULTS
Lab No. 598 Job-Mix Formula B/CS Unified Specification
No. 330
Percent Asphalt
(TEX-236-F): 5.9 5.7 Plus or Minus 0.5%
Average Specimen
Density(%): 97.4 96.0
Avg. HVEEM Stability HVEEM Stability Not Less
(TEX-208-F): 36 Than 35
Avg. Bulk Specific
Gravity(TEX-207-F): 2.324
Theoretical Maximum
Specific Gravity
(TEX-227-F): 2.385
Copies To: Mr.Josh Norton,City of College Station
Mr. Ricky Palasota,Sr., Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
2
CMB besting and Engineering, The.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr. KcithTinker Report Date: 8/24/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 15
College Station,Texas 77842
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1, PHASE 2; COLLEGE STATION,TEXAS
Thursday,August 20,2009
At the request of Mr. Keith Tinker of the City of College Station, Mr. Kyle Rosenbaum of CME Testing and Engineering, Inc.
(CME) traveled to the project site referred to as "Victoria Avenue & Infrastructure Extension; Reatta Meadows, Section I,
Phase 2" in College Station,Texas. Mr. Rosenbaum arrived on site at 1:30 p.m. on Thursday, August 20, 2009 to obtain a bulk
sample of hot mix asphaltic concrete(I-LMAC) for laboratory analysis. The sample obtained by Mr. Rosenbaum represents the
'Type"D" HMAC placed for Victoria Avenue at Station 4+25, 4' lef} of centerline. The results of the laboratory analysis are
presented in Table I and in the attached Table II.
Time Charge: Kyle Rosenbaum- 1.5 Hours
HOT MIX ASPHALTIC CONCRETE TEST REPORT
Represents: Victoria Avenue at Station 4+25,4' Left of Centerline
Date Sampled: 7/20/09
Time Sampled: 2:30 PM
Supplier: Brazos Valley Services
Sample Location: Hopper of Laydown Machine
Field Temp. of Sample(°F): 335
TABLE I. SIEVE ANALYSIS (GRADATION) OF HMAC AGGREGATE
Lab No. 730 Job-Mix Formula B/CS Unified Specification No, 330
Individual Total Individual Total Ind. Tolerances for Individual
Sieve Size %Retained %Passing %Retained %Passing Diff. %Retained
1/2" 1.8 98.2 0.1 99.9 1.7 Plus or Minus 5
3/8" 8.6 89.6 8.9 91.0 -0.3 Plus or Minus 5
No.4 28.5 61.1 28.0 63.0 0.5 Plus or Minus 5
No. 10 22.1 39.0 26.0 37.0 -3.9 Plus or Minus 5
No. 40 20.2 18.8 21.0 16.0 -0.8 Plus or Minus 3
No. 80 8.4 10.4 9.0 7.0 -0.6 Plus or Minus 3
No. 200 6.4 4.0 4.0 3.0 2.4 Plus or Minus 3
CME TESTING ANb ENGINEERING INC.
Victoria Avenue&htti'astntct ure Extension; Reatta Meadows,Section 1,Phase 2;College Station,Texas
Report No. 15—Laboratory Test Results
August 24,2009
TABLE II. HMAC MATERIAL PROPERTIES RESULTS
Lab No. 730 Job-Mix Formula BRCS Unified Specification
No. 330
Percent Asphalt
(TEX-236-F): 6.2 5.7 Plus or Minus 0.5%
Average Specimen
Density(%): 97.3 96.0
Avg. I-IVEEM Stability HVEEM Stability Not Less
(TEX-208-F): 46 Than 35
Avg.Bulk Specific
Gravity(TEX-207-F): 2.304
Theoretical Maximum
Specific Gravity
(TEX-227-F): 2.367
Copies To: Mr. Josh Norton,City of College Station
Mr. Ricky Palasota, Sr.,Brazos Valley Services
Mr. Joe Gattis, P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
2
CMB Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr. KeithTinker Report Date: 8/27/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 16
College Station,Texas 77842
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1, PHASE 2; COLLEGE STATION,TEXAS
Tuesday,August 25,2009
At the request of Mr. Keith Tinker of the City of College Station, Mr. David Requena and Mr. Craig Moore of CME Testing
and Engineering, Inc. (CME) traveled to the project site referred to as "Victoria Avenue & Infrastructure Extension; Reatta
Meadows, Section 1, Phase 2" in College Station, Texas. Messrs. Requena and Moore arrived on site at 10:00 a.m. on
Tuesday,August 25, 2009 to obtain four(4)HMAC pavement cores from the constructed pavement sections of the roadway.
All four core locations were selected by Mr. Tinker and are described in the attached Table 11. The HMAC cores were
collected in accordance with ASTM D 5361. Each core sample was measured for thickness in accordance with ASTM D 3549
and tested to determine the percent air voids in accordance with ASTM D 3203. Percent air voids were computed based on the
theoretical maximum density of the bulk samples collected on August 20, 2009 (Table I). The results of the laboratory analysis
are presented in the attached Table I and Table II.
Time Charge: David Requena— 1.0 Hour
Craig Moore— 1.0 Hour
Copies To: Mr.Josh Norton,City of College Station
Mr. Ricky Palasota, Sr., Brazos Valley Services
Mr.Joe Gattis, P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
CME TESTING AND ENGINEERING INC.
Victoria Avenue&infrastructure Extension;Reatta Meadows,Section I,Phase 2
Report No. 16—HMAC Core Testing
August 27,2009
TABLE I. SUMMARY OF LABORATORY TEST RESULTS CONDUCTED ON BULK
I-IMAC SAMPLE
Material Theoretical Max Theoretical Max
Reference Date Paved Specific Gravity Density(ND Material Type
A August 20, 2009 2.385 148.8 Type "D"(Fine-Graded Surface Course)
B August 20, 2009 2.367 147.7 Type"D"(Fine-Graded Surface Course)
TABLE IL SUMMARY OF LABORATORY TEST RESULTS FOR HMAC CORES
OBTAINED FROM CONSTRUCTED PAVEMENT SECTIONS
Date Specimen Locations Avg. Specimen Material Density
•Cored Street Station Location Thickness(in.) 2,4 Reference (pet) Air Voids(%) 'i
8/25/09 Victoria Avenue 0+70 8'Right of Centerline 2.20 A 138.9 6.7
8/25/09 Victoria Avenue 2+50 18'Left of Centerline 2.55 B 137.2 7.1
8/25/09 Victoria Avenue 4+30 5' Right of Centerline 2.20 A 141.6 4.8
8/25/09 Victoria Avenue 5+60 10'Left of Centerline 2.35 B 138.1 6.5
Notes:
1. Percent air voids based on theoretical maximum density of bulk samples collected on August 20,2009
2. Average specimen thickness was determined using calipers as specified in ASTM D 3549.
3. Per B/CS Unified Specification No. 330 compacted HMAC pavement should have between two percent (2%) and ten
percent(10%)air voids.
4. Per project plans and specifications minimum of 2 inches of HMAC.
2
CME Testing and Engineering, Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.KeithTinker Report Date: 8/27/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 17
College Station,Texas 77842 Technician: Kyle Rosenbaum
Arrival Time: 9:00 AM
Time Charge: 1.5 Hours
Requested By: Alfonso Guillen
(Brazos Valley Serviecs)
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1, PHASE 2; COLLEGE STATION,TEXAS
CONCRETE OBSERVATION & SAMPLING REPORT
Date Sampled: August 26, 2009
No. of Sets Cast: I of 1
Sample Represents: Sidewalk along Victoria Avenue at Station 3+03, Right of Centerline
Required Compressive Strength at 28 Days, (psi): 3,000
LABORATORY TEST DATA
Sample Date Age Cross-sectional Maximum Compressive
Identification No. Tested (Days) Area (in2.) Load(lbf.) Strength (psi.)
VAIE 05 09/02/09 7 12.57
VAIE 06 09/23/09 28 12.57
VAIE 07 09/23/09 28 12.57
VAIE 08 Reserve 12.57
Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance
with the following applicable ASTM methods: C 31,C 39,C 138,C 143,C 231,&C 1064.
FIELD TEST DATA
Supplier: Brazos Valley Services Time Batched: 8:48 AM Air Content, (%): 4.2
Thick No.: 73 Time Sampled: 9:40 AM Unit Weight,(pct): ND
Ticket No.: 3871 Concrete Temp,(°F): 86 Sample Type: Cylinder
Mix No.: I"3000 Ambient Temp,(°F): 94 Sample Size: 4 in. dia.
Accumulated Yards: 10 Slump(in.): 5.0 Water Added on Site, (gal): 0
Weather: Partly Cloudy
Field Contact: Mr. Alfonso Guillen(Brazos Valley Services)was informed of field test results.
Remarks: ND—Not Determined; NP—Not Provided; NA—Not Applicable
Copies To: Mr.Josh Norton,City of College Station
Mr. Ricky Palasota, Sr., Brazos Valley Services
Mr.Joe Gattis, P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
Aggirmommok
CME besting and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr. KeithTinker Report Date: 9/1/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 18
College Station,Texas 77842 Technician: Jimmy Ledford
Arrival Time: 10:55 AM
Time Charge: 1.0 Hour
Requested By: Alfonso Guillen
(Brazos Valley Serviecs)
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1, PHASE 2; COLLEGE STATION,TEXAS
CONCRETE OBSERVATION & SAMPLING REPORT
Date Sampled: August 31, 2009
No. of Sets Cast: 1 of 1
Sample Represents: Sidewalk along Victoria Avenue at Station 2+50, Left of Centerline
Required Compressive Strength at 28 Days, (psi): 3,000
LABORATORY TEST DATA
Sample Date Age Cross-sectional Maximum Compressive
Identification No. Tested (Days) Arca (in2.) Load(Ibf.) Strength (psi.)
VALE 09 09/07/09 7 12.57
VAIE 10 09/28/09 28 12.57
VAIE 11 09/28/09 28 12.57
VAIE 12 Reserve 12.57
Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance
with the following applicable ASTM methods: C 31,C 39,C 138,C 143,C 231,R.C 1064.
FIELD TEST DATA
Supplier: Brazos Valley Services Time Batched: 10:28 AM Air Content, (%): 2.7
Truck No.: 72 Time Sampled: 11:10 AM Unit Weight,(pct): ND
Ticket No.: 3927 Concrete Temp,(°F): 84 Sample Type: Cylinder
Mix No.: 1"3000 Ambient Temp, (°F): 82 Sample Size: 4 in. dia.
Accumulated Yards: 10 Slump(in.): 4.5 Water Added on Site, (gal): 0
Weather: Mostly Cloudy
Field Contact: Mr. Alfonso Guillen(Brazos Valley Services) was informed of field test results.
Remarks: ND—Not Determined; NP—Not Provided; NA—Not Applicable
Copies To: Mr.Josh Norton,City of College Station
Mr. Ricky Palasota, Sr.,Brazos Valley Services
Mr.Joe Gattis, P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
CME Testing and Engineering, Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax (979)690-3668
Client: Mr.KeithTinker Report Date: 9/2/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 19
College Station,Texas 77842 Technician: Kyle Rosenbaum
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1, PHASE 2; COLLEGE STATION,TEXAS
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Date Sampled: August 26, 2009
No. of Sets Cast: 1 of 1
Sample Represents: Sidewalk along Victoria Avenue at Station 3+03, Right of Centerline
Required Compressive Strength at 28 Days, (psi): 3,000
LABORATORY TEST DATA
Sample Date Age Cross-sectional Maximum Compressive
Identification No. Tested (Days) Area(in2.) Load(lbf.) Strength (psi.)
VAIE 05 09/02/09 7 12.57 31,755 2,530
VAIE 06 09/23/09 28 12.57
VAIE 07 09/23/09 28 12.57
VAIE 08 Reserve 12.57
Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance
with the following applicable ASTM methods: C 31,C 39,C 138,C 143,C 231,&C 1064.
FIELD TEST DATA
Supplier: Brazos Valley Services Time Batched: 8:48 AM Air Content,(%): 4.2
Truck No.: 73 Time Sampled: 9:40 AM Unit Weight,(pct): ND
Ticket No.: 3871 Concrete Temp, (°F): 86 Sample Type: Cylinder
Mix No.: 1"3000 Ambient Temp, (°F): 94 Sample Size: 4 in. dia.
Accumulated Yards: 10 Slump(in.): 5.0 Water Added on Site, (gal): 0
Weather: Partly Cloudy
Field Contact: Mr. Alfonso Guillen(Brazos Valley Services)was informed of field test results.
Remarks: ND—Not Determined;NP—Not Provided; NA—Not Applicable
Copies To: Ms. Carol Cotter,P.E.,City of College Station
Mr. Ricky Palasota, Sr., Brazos Valley Services
Mr.Joe Gattis, P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
CMB Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.Keitlifinker Report Date: 9/7/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 20
College Station,Texas 77842 Technician: Jimmy Ledford
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1, PHASE 2; COLLEGE STATION,TEXAS
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Date Sampled: August 31, 2009
No. of Sets Cast: 1 of 1
Sample Represents: Sidewalk along Victoria Avenue at Station 2+50, Left of Centerline
Required Compressive Strength at 28 Days, (psi): 3,000
LABORATORY TEST DATA
Sample Date Age Cross-sectional Maximum Compressive
Identification No. Tested (Days) Area(in2.) Load(lbf.) Strength (psi.)
VAIE09 09/07/09 7 12.57 30,135 2,400
VALE 10 09/28/09 28 12.57
VA IE 11 09/28/09 28 12.57
VAIE 12 Reserve 12.57
Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance
with the following applicable ASTM methods: C 31,C 39,C 138,C 143,C 231,&C 1064.
FIELD TEST DATA
Supplier: Brazos Valley Services Time Batched: 10:28 AM Air Content,(%): 2.7
Truck No.: 72 Time Sampled: 11:10 AM Unit Weight,(pct): ND
Ticket No.: 3927 Concrete Temp, (°F): 84 Sample Type: Cylinder
Mix No.: 1"3000 Ambient Temp,(°F): 82 Sample Size: 4 in. dia.
Accumulated Yards: 10 Slump(in.): 4.5 Water Added on Site, (gal): 0
Weather: Mostly Cloudy
Field Contact: Mr.Alfonso Guillen(Brazos Valley Services)was informed of field test results.
Remarks: ND— Not Determined; NP—Not Provided; NA—Not Applicable
Copies To: Ms.Carol Cotter,P.E.,City of College Station
Mr. Ricky Palasota, Sr., Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
CME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.KeithTinker Report Date: 9/23/09
City of College Station Project No.: 29073
P.O. Box 9960 Report No.: 21
College Station,Texas 77842 Technician: Kyle Rosenbaum
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Date Sampled: August 26,2009
No. of Sets Cast: 1 of 1
Sample Represents: Sidewalk along Victoria Avenue at Station 3+03,Right of Centerline
Required Compressive Strength at 28 Days,(psi): 3,000
LABORATORY TEST DATA
Sample Date Age Cross-sectional Maximum Compressive
Identification No. Tested (Days) _ Area(in2.) Load(lbf.) Strength(psi.)
VAIE 05 09/02/09 7 12.57 31,755 2,530
VAIE 06 09/23/09 28 12.57 37,645 2,990
VAIE 07 09/23/09 28 12.57 37,975 3,020
VAIE 08 ---- Reserve 12.57
Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance
with the following applicable ASTM methods: C 31,C 39,C 138,C 143,C 231,&C 1064.
FIELD TEST DATA
Supplier: Brazos Valley Services Time Batched: 8:48 AM Air Content,(%): 4.2
Truck No.: 73 Time Sampled: 9:40 AM Unit Weight,(pct): ND
Ticket No.: 3871 Concrete Temp,(°F): 86 Sample Type: Cylinder
Mix No.: 1"3000 Ambient Temp,(°F): 94 Sample Size: 4 in.dia.
Accumulated Yards: 10 Slump(in.): 5.0 Water Added on Site,(gal): 0
Weather: Partly Cloudy
Field Contact: Mr.Alfonso Guillen(Brazos Valley Services)was informed of field test results.
Remarks: ND—Not Determined;NP—Not Provided;NA—Not Applicable
Copies To: Ms. Carol Cotter,P.E.,City of College Station
Mr. Ricky Palasota,Sr., Brazos Valley Services
Mr.Joe Gattis,P.E.,Gattis Engineering
CME Testing and Engineering, Inc.
CME Testing and Engineering,Inc.
320 Graham Road
College Station,Texas 77845
(979)690-3600 Fax(979)690-3668
Client: Mr.KeithTinker Report Date: 9/28/09
City of College Station Project No.: 29073
P.O.Box 9960 Report No.: 22
College Station,Texas 77842 Technician: Jimmy Ledford
PROJECT: VICTORIA AVENUE & INFRASTRUCTURE EXTENSION; REATTA MEADOWS,
SECTION 1,PHASE 2; COLLEGE STATION,TEXAS
CONCRETE COMPRESSIVE STRENGTH TEST REPORT
Date Sampled: August 31,2009
No. of Sets Cast: 1 of 1
Sample Represents: Sidewalk along Victoria Avenue at Station 2+50,Left of Centerline
Required Compressive Strength at 28 Days,(psi): 3,000
LABORATORY TEST DATA
Sample Date Age Cross-sectional Maximum Compressive
Identification No. Tested (Days) Area(in2.) Load (lbf.) Strength (psi.)
VAIE 09 09/07/09 7 12.57 30,135 2,400
VAIE 10 09/28/09 28 12.57 41,970 3,340
VAIE 11 09/28/09 28 12.57 39,540 3,150
VAIE 12 ---- Reserve 12.57
Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance
with the following applicable ASTM methods: C 31,C 39,C 138,C 143,C 231,&C 1064.
FIELD TEST DATA
Supplier: Brazos Valley Services Time Batched: 10:28 AM Air Content,(%): 2.7
Truck No.: 72 Time Sampled: 11:10 AM Unit Weight,(pcf): ND
Ticket No.: 3927 Concrete Temp,(°F): 84 Sample Type: Cylinder
Mix No.: 1"3000 Ambient Temp,(°F): 82 Sample Size: 4 in.dia.
Accumulated Yards: 10 Slump(in.): 4.5 Water Added on Site,(gal): 0
Weather: Mostly Cloudy
Field Contact: Mr.Alfonso Guillen(Brazos Valley Services)was informed of field test results.
Remarks: ND—Not Determined;NP—Not Provided;NA—Not Applicable