Loading...
HomeMy WebLinkAboutLetter of Completion D\ o-7 - CLk LETTER OF COMPLETION CITY ENGINEER DATE: ( 21 — 06/ CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OFF SG aT t o ffri454 .Zr /L 6 a rr4 n4A Da Las _ Dear Sir: fVG(:5/ 7/%A( �L,7 S�.PL /1���`i�,4 S /-7),cThe purpose of our fitter is to request that the following listed improvements be 1/ 1�/ _ approved and accepted as being constructed under City inspection and completed Tv according to plans and specifications as approved and required by the City of College ''7 'c , Station, Texas. This approval and acceptance by the City is requested in order that wejp ,� may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by (Lr GoA nY 4Cf19^j and by their subcontractors as indicated by signatures below. WORK COMPLETED WARRANTY DATE VAT 44 Z.z -- 21 --- di SE' */ Lt^J 6 2 — I AL -- 21 — U9 Sr/1.4 S rS 1 -- 21 — 0 9 Cez r e6"isravcrt�•.� C..D� GLC Owner: j3A1t4b# PilitniA0e6.4P, �.. Contractor: Phone Number: 777' "/lid - 1,/i Phone Number: 1), -'/1 - I2-Sb Address: /�.0 Sp it 3 Address: 33 2 3 6.9406.) Tao. ND�zw.A.�CLE� tel` 7787, (.o4e.e44 Sr4v`c...11 7784rs" Signature: tai' ignature: `'4� ACCEP • &APPR VA Ci y Representative WIPLAT FILED V OFFSITE ESMTS FILED ty nginee L ' TEMP BLANKET ESMT FILED Revised 1/31/07 e'L • OTHER OMITS NEEDED